GUIDE TO SUPPLY AND METERING ARRANGEMENT ON …
Ratings of Outgoing Control Gear in the Main Switchboard ... Provision for at least one spare lateral tee-off unit is recommended on each floor for future use for multi-risers (rising mains) installation of commercial / industrial buildings. Version 9 – 09/18 Page 4 of 25 vl:ys 7.3 Where HRC fuses are used, they shall be fitted with insulated ...
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
CODE OF PRACTICE 101 FOR DISTRIBUTION …
www.clp.com.hkCode of Practice No. 101 for Distribution Substation Design Version 12.0 Content - 1 June 2012 CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION DESIGN
Code, Design, Practices, Distribution, Version, Code of practice, Substations, Code of practice 101 for distribution, For distribution substation design version, Code of practice 101 for distribution substation
CODE OF PRACTICE 101 FOR DISTRIBUTION …
www.clp.com.hkCODE OF PRACTICE 101 . FOR . DISTRIBUTION SUBSTATION DESIGN . Version 13.0. Issued By : Asset Management Department . Asset Development Branch . Date of Issue : 30 June, 2014
Code, Design, Practices, Distribution, Version, Substations, Code of practice 101 for distribution, Code of practice 101, Distribution substation design
CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION …
www.clp.com.hkCode of Practice No. 101 for Distribution Substation Design Page 5 Version 15 June 2020 Information Class: PROPRIETARY 專有 4.4.2 The minimum dimensions of the transformer plinth should be 1.8m long x 1.35m wide and level with finished floor level. Actual plinth size is subjected to the transformer rating and type.
CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION …
www.clp.com.hkARCHITECTURAL/CIVIL DESIGN 5.1 General Requirements 5.1.1 All substations shall comply with the Hong Kong Electricity Ordinance (Cap. 406), the Hong Kong Buildings Ordinance (Cap. 123) and the ... is covered by the canopy of the building, the direct distance from the
Update No. 2/2018 - Revision of COP101 Drawings
www.clp.com.hkCode of Practice 101 for Distribution Substation Design (COP101) Update No. 2/2018 - Revision of COP101 Drawings This letter serves to announce the revision of COP101 drawings as below: Document: COP101 Version 14 Effective Date: 19 December 2018 Summary of Change: 1. Revision of drawing - T-COP-10250-D-E33-0103-20-F-A (Detail CF9 revised) 2.
Code, Practices, Distribution, Substations, Code of practice 101 for distribution substation
Related documents
IS 3034 (1993): Fire Safety of Industrial Buildings ...
law.resource.orgunit, a fire barrier/separation wall shall be provided for each unit beneath the operating floor in the turbine and electri- cal bays; Between TG hall and control room/com- puter room/instrument room; Between TG hall and electrical switch- gear room ( unit-wise barriers needed );
D10 and D10 Turbo Installation Manual - Centurion Systems
www.centsys.co.zaUnit 13 Production Park Intersection Newmarket Road & Epsom Avenue North Riding Gauteng ... The D10 is a heavy duty sliding gate operator designed to open and close industrial sliding ... involute” gear instead of a helical gear, which means that there is a larger contact area with
Design Analysis Of Industrial Gear Box Casing.
www.irjet.netDesign Analysis Of Industrial Gear Box Casing. Balasaheb Sahebrao 1Vikhe 1 Assistant Professor, Dept. of Mechanical Engineering, SVIT College Nasik, Maharashtra, India -----***-----Abstract - This paper contains the study Design Analysis of a three stage Industrial Helical gearbox casing using Finite Element Analysis (FEA) Method.
Industrial Solutions Gyratory crushers
ucpcdn.thyssenkrupp.combevel gear set allows the installation of higher-capacity drive motors if required. A pre-pressurized hydraulic system (balance unit) ensures contin - uous contact between the individual step bearing discs and pre - vents the main shaft from lifting off of the …
AC Servo Motor and Driver˜ - Industrial Devices & Solutions
industrial.panasonic.coma heating unit such as a heater or a large wire wound resistor.˜ Do not place combustibles near by the motor, driver and regenera-tive resistor. Failure to observe this in-struction could result in fire and breakdowns. Ground the earth terminal of the motor and driver without fail. Failure to observe this in-struction could result in
Control systems - ZF
www.zf.comcompact package. The single unit design allows for the processor to be mounted in smaller spaces while maintaining two completely separate operating systems. MiniCommand provides the features of control systems costing significantly more, all with the proven durability from ZF Marine. For operators already familiar with ZF Marine’s existing
ZF 400 series
www.zf.com735 kW. The availability of multiple gear ratios, down angle, parallel, IV and W configuration variants gives manufacturers and fleet operators high flexibility for new designs and retrofits. Thus, the ZF 400 series • covers a wide range of applications for both yachts and commercial vessels. The advantages of this advanced transmission include