Example: marketing

Hydraulics and Drainage Design - Indiana

Indiana DEPARTMENT OF TRANSPORTATION 2013 Design MANUAL. CHAPTER 203. Hydraulics and Drainage Design Design Revision Sections Affected Memorandum Date 13-04 Mar. 2013 (10), through 13-05 Mar. 2013 (02). (09), (15), (04), (06), 13-11 May 2013. Figure 203-4E, Figure 203-4 I. 16-19 May 2016 (02). 16-21 May 2016 (13), Figure 203-2F. (02), (11) thru (15), (02), 203- 17-07 Apr. 2017 (03), (07), (09), (16), and Figures 203-2A and 203-2B. TABLE OF CONTENTS. TABLE OF CONTENTS .. 2. LIST OF FIGURES .. 6. INTRODUCTION .. 8. Small Structure .. 8. Introduction [Rev.]

203-2A Maximum Span Lengths for Culverts [Rev. Apr. 2017] 203-2B Minimum Pipe Culvert Size [Rev. Apr. 2017] 203-2C Design-Storm Frequency for Bridge or Culvert 203-2D Stream Velocity for Erosion Protection 203-2E Pipe or Box Structure Sump Requirement 203-2F Recommended Manning’s n-Value for Culverts [Rev. May 2016] 203-2G Joint Probability ...

Tags:

  Indiana, Culvert

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Hydraulics and Drainage Design - Indiana

1 Indiana DEPARTMENT OF TRANSPORTATION 2013 Design MANUAL. CHAPTER 203. Hydraulics and Drainage Design Design Revision Sections Affected Memorandum Date 13-04 Mar. 2013 (10), through 13-05 Mar. 2013 (02). (09), (15), (04), (06), 13-11 May 2013. Figure 203-4E, Figure 203-4 I. 16-19 May 2016 (02). 16-21 May 2016 (13), Figure 203-2F. (02), (11) thru (15), (02), 203- 17-07 Apr. 2017 (03), (07), (09), (16), and Figures 203-2A and 203-2B. TABLE OF CONTENTS. TABLE OF CONTENTS .. 2. LIST OF FIGURES .. 6. INTRODUCTION .. 8. Small Structure .. 8. Introduction [Rev.]

2 Apr. 2017] .. 8. Small Structure Policy [Rev. Mar. 2013, May 2013, May 2016, Apr. 2017] .. 9. (01) Site Criteria .. 10. (02) Allowable Headwater (AHW) [Rev. Mar. 2016, Apr. 2017] .. 11. (03) Roadway-Serviceability Freeboard .. 13. (04) Structure Freeboard .. 13. (05) Maximum Velocity .. 13. (06) Minimum Velocity .. 13. (07) Temporary or Permanent Storage .. 13. (08) culvert Skew .. 13. (09) Cover [Rev. May 2013] .. 14. (10) culvert Sumping [Rev. Mar. 2013] .. 14. (11) culvert Sizing .. 15. (12) Pipe culvert Interior Designation [Rev. May 2016] .. 16.

3 (13) Pipe Lining .. 16. (14) Pipe or Box Extension Structure Sizing [Rev. May 2013, Apr. 2017] .. 17. (15) Energy 18. Design Considerations .. 19. (01) culvert Location .. 19. (02) culvert -Hydrology Methods .. 19. (03) Tailwater Relationship .. 19. (04) Inlet or Outlet End Treatment .. 20. (05) Pipe Length Determination .. 21. (06) Buoyancy Protection .. 22. (07) Relief Opening .. 22. (08) Erosion and Sediment Control .. 22. (09) Improved End Treatment .. 22. Design Procedures .. 24. (01) General .. 24. (02) Headwater 25. (03) Tailwater 25. (04) Energy 26.

4 Specialty 27. Page 2 2013 Indiana Design Manual, Ch. 203. (01) Precast Concrete Box culvert .. 27. (02) Precast Concrete Oversize Box Structure .. 28. (03) Precast Concrete Three-Sided Structure .. 28. Specialty Structure Requirements .. 32. (01) Wingwalls and Headwalls .. 32. (02) Reinforcement Treatment .. 33. (03) Scour Considerations .. 34. (04) Backfilling [Rev. May 2013] .. 34. (05) Plans Details, Design Computations, and Working Drawings .. 35. Documentation .. 36. BRIDGE .. 37. Introduction .. 37. Bridge Policy [Added Apr. 2017] .. 37. (01) Allowable Backwater [Rev.]

5 Apr. 2017] .. 38. (02) Road-Serviceability Freeboard [Rev. Apr. 2017] .. 39. (03) Bridge Freeboard [Rev. Apr. 2017] .. 39. (04) Bridge Waterway Velocity [Rev. Apr. 2017] .. 40. (05) Upstream Structure Impacts [Added Apr. 2017] .. 40. (06) Bridge Sizing [Rev. Apr. 2017] .. 41. (07) Channel Clearing .. 42. (08) Temporary Runaround Bridge .. 43. (09) Bridge that Requires an IDNR CIF Permit [Rev. Apr. 2017] .. 43. Design Considerations .. 43. Design 45. (01) Bridge Hydraulics 45. (02) Scour .. 47. (03) Scour Hydraulics Modeling Using 48. (04) Pressure-Flow Scour.

6 49. Determination of Hydraulic and Scour Data Parameters .. 50. Documentation [Rev. May 2015] .. 52. PAVEMENT AND STORM Drainage .. 53. Introduction .. 53. General Policy .. 53. Design Considerations .. 54. (01) Corridor Plan .. 54. (02) Local Issues .. 54. (03) Existing Conditions .. 54. (04) Downstream 54. (05) Environmental Issues .. 55. (06) Roadway Drainage .. 55. 2013 Indiana Design Manual, Ch. 203 Page 3. (07) Bridge-Deck Drainage .. 56. (08) Construction and Maintenance .. 56. Design Procedure and 57. (01) Data Collection and Preliminary Sketch.

7 57. (02) Inlet Location .. 57. (03) Inlet Spacing and Spread [Rev. Apr. 2017] .. 57. (04) Pipe Capacity, Non-Pressure Flow .. 59. (05) Hydraulic Gradient, Pressure Flow .. 59. (06) Minimum Pipe Diameter and Design Velocity [Rev. May 2013] .. 59. (07) Pipe Cover [Rev. Apr. 2017] .. 59. (08) Connecting Inlets and Manholes .. 60. (09) Sag Vertical Curve and Flanking Inlets [Rev. Apr. 2017] .. 60. (10) Slotted Drain .. 61. (11) Underdrains .. 62. (12) Roadside or Median Ditch .. 63. (13) Curb and 63. (14) Shoulder Gutter or 64. (15) Impact Attenuator.

8 64. (16) Bridge Deck Drainage [Rev. Apr. 2017] .. 64. (17) Storm- Drainage Agreement Policy .. 67. (18) Computer Programs .. 69. Documentation .. 69. (01) Spread Calculations for Inlet 69. (02) Storm Sewer 69. (03) Hydraulic Grade Line Check .. 70. (04) Plan and Profile .. 70. (05) Additional Information .. 70. STORMWATER MANAGEMENT AND DETENTION .. 70. Introduction .. 70. General Policy .. 71. (01) Reasons for Storage .. 71. (02) Downstream 71. (03) Local Jurisdictional Requirements .. 72. Design Considerations .. 72. (01) Detention 72. (02) Retention Pond.

9 72. (03) Roadside Ditch Detention .. 73. (04) Underground Storage .. 73. (05) Outlet Conditions .. 74. (06) Maintenance .. 74. Page 4 2013 Indiana Design Manual, Ch. 203. (07) Safety 75. Design 75. (01) Detention 76. (02) Retention Pond .. 76. (03) Roadside Ditch Detention .. 77. (04) Oversized Storm Sewer and Inline Detention .. 77. (05) Infiltration Trench .. 78. Pump Station .. 78. Documentation .. 78. CHANNEL OR DITCH .. 79. Introduction .. 79. General Policy .. 80. (01) 80. (02) Design .. 80. (03) Federal Policy .. 80. (04) INDOT Policy .. 81. Open-Channel 81.

10 Stream Channel .. 82. (01) Stream Morphology .. 82. (02) Design Considerations .. 82. (03) Design Procedure .. 83. Roadside Channel or Other Ditches .. 83. (01) Design Considerations .. 83. (02) Design Procedure .. 84. (03) Channel 86. Bank Protection .. 87. (01) Erosion Potential .. 88. (02) Bank and Lining Failure 89. (03) Design Considerations .. 90. (04) Design Procedure .. 95. REFERENCES .. 107. FIGURES .. 110. 2013 Indiana Design Manual, Ch. 203 Page 5. LIST OF FIGURES. Figure Title 203-2A Maximum Span Lengths for Culverts [Rev. Apr. 2017]. 203-2B Minimum Pipe culvert Size [Rev.]


Related search queries