DEVELOPMENT SERVICES. Single-Family & Duplex Projects PERMITTING guide . Page 1. Zoning and Building Permits for Single-family Homes and Duplexes Use this guide for new residential construction, additions, attic conversions, and other projects that include structural or excavation work, as well as for zoning-only reviews. For smaller projects (fences, interior remodels, windows, doors, decks, detached storage, and other non-structural repairs), consult the Home Projects section of In this guide Permit 2. Submittal checklist (includes the items you must submit to start the review process).. 3. Statement of valuation 5. Asbestos inspection acknowledgement form (for additions/renovations only).. 6. Affordable housing fee 7. Guidance for plans and drawings Site plan Building elevations Partial demolition plans (only for projects that include partial demolition of an existing building).

Jul 03, 2020 · If your project is mixed-use, provide the gross floor area for each use type. For additions to existing buildings: List the gross floor area (as calculated per Denver Zoning Code 13.3) for your addition by use type. Only list the floor area that will be new; do not include the square footage of …

Tags:

  Denver

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of In this guide

1 DEVELOPMENT SERVICES. Single-Family & Duplex Projects PERMITTING guide . Page 1. Zoning and Building Permits for Single-family Homes and Duplexes Use this guide for new residential construction, additions, attic conversions, and other projects that include structural or excavation work, as well as for zoning-only reviews. For smaller projects (fences, interior remodels, windows, doors, decks, detached storage, and other non-structural repairs), consult the Home Projects section of In this guide Permit 2. Submittal checklist (includes the items you must submit to start the review process).. 3. Statement of valuation 5. Asbestos inspection acknowledgement form (for additions/renovations only).. 6. Affordable housing fee 7. Guidance for plans and drawings Site plan Building elevations Partial demolition plans (only for projects that include partial demolition of an existing building).

2 14. Resubmittals (Use these instructions to submit additional or corrected information during a review.)..15. Tip sheets and sample plans (These are for your reference only and do not need to be submitted.)..16. How to submit Option 1 By email to All documents and plans prepared by an architect, engineer, or surveyor must be stamped/sealed and have a valid electronic signature that meets the guidelines in the Electronic Signatures guide (available from under Building Guides ). Save all files as PDFs. Combine plans into one PDF file if they were all prepared by the same individual. Otherwise, submit separate files for each discipline in order to preserve the encrypted digital signatures. All drawings must be scalable and legible. No JPEGs or other non-PDF file types can be reviewed. Make sure all email attachments use the following naming convention (examples below): <DocumentName>_<Address>_<Date>.

3 Completed forms in this guide ResGuide_201 WColfax_9-26-2017. Combined plans Plans_201 WColfax_9-26-2017. Separate plans (by trade) ArchPlans_201 WColfax_9-26-2017; StrucPlans_201 WColfax_9-26-2017; etc. Prior reviews/approvals Landmark_201 WColfax_9-26-2017. Reports, surveys, etc. SoilsReport_201 WColfax_9-26-2017. Resubmittals ResubmittalSlip_201 WColfax_9-26-2017 and PlansResubmittal_201 WColfax_9-26-2017. Option 2 In person. Make an appointment for the Log In counter at Plan review and permit fee information is available at Questions? or (720) 865-2710. Please allow up to 48 hours for a response. Last updated: September 25, 2018 201 W. Colfax Ave., Dept. 205. denver , CO 80202. DEVELOPMENT SERVICES. Single-Family & Duplex Projects PERMITTING guide . Page 2. Permit Application PROJECT TYPE (CHECK ALL THAT APPLY): c New primary structure c New Type-approved c Landmark c ADU - New structure or conversion c Addition, small (<400sf) c Zoning-only review c New Master c Addition, large (>400sf) c Other: _____.

4 APPLICANT INFORMATION. Issue Permit to (please check one) c Homeowner c Applicant c Contractor Name: Phone: Property Owner Address: City: Email: ZIP Code: Name: Phone: Applicant Information Company Name: (If different from owner and Address: City: contractor). Email: ZIP Code: Name: Phone: Contractor Information Company Name: License #_____ Address: City: Email: ZIP Code: SUBJECT PROPERTY INFORMATION. Property Address: What is the property's zone district? (Include all applicable overlay zones). PROPOSAL. Scope of Work Describe the nature of the proposed project. Attachments Included: c Submittal Checklist c Board of Adjustments Decision c Building Plan Set- Architecture/Full Floor Plans/Engineering/etc. c Valuation Statement c Site plan(s) showing all building, SUDP, and zoning information c Affordable Housing Fee Application c Elevation plan(s) showing all building and zoning information c Demolition and/or Excavation Plan c Other: _____.

5 SIGNATURE REQUIRED. To the best of my knowledge and belief, I attest that the information stated in this application and in all supporting plans and documents is true and accurate. Signature of Owner or Authorized Owner Representative _____. Full Name (Print) _____ Date _____. Note: Proof of home ownership and/or contractor's license must be verified at time of permit issuance. NO REFUND WILL BE GIVEN FOR ANY PLAN REVIEW FEE COLLECTED BASED ON THE VALUATION PROVIDED BY APPLICANT. Last updated: September 25, 2018 201 W. Colfax Ave., Dept. 205. denver , CO 80202. DEVELOPMENT SERVICES. Single-Family & Duplex Projects PERMITTING guide . Page 3. LOG #: _____(for CPD use only). Submittal Checklist: Your project can start the review process if you submit the items below For details on any of the plan elements below, consult the site plan and building elevation checklists in this guide .

6 Any document (plans, drawings, reports, surveys, etc.) prepared by an architect or engineer must bear their seal and original signature on hard copies, or must be digitally signed and stamped if submitted via email. Items (Include house/duplex address[es] on all pages submitted.) # of hard copies needed (only 1 of each for email submittals). A legal address already assigned (needed for each new unit) 1. Permit application 1. Statement of valuation form 1. Affordable housing fee application 1. Asbestos inspection acknowledgement form (for additions and renovations only) 1. Approvals from Landmark Preservation or the Board of Adjustment (if applicable) 1. Additional items needed for new homes and accessory dwelling units (ADUs): Soils report that matches the project's address and scope of work 1. Structural drawings for foundation design and framing 2. Boundary (vacant land) or improvement survey (if there are existing structures).

7 ILCs not accepted. 2. *Surveys are also needed for any construction within 3 feet of a property line. Minimum requirements for plans # of hard copies needed (1 of each for email submittals. 2 of each for zoning-only reviews.). On the plan cover sheet (or on the site plan), include the current adopted building code being used the method of IECC compliance ( , prescriptive, performance, or ERI). 4 hard copies (or 1 by email) of a site plan that include 4. Address Reference lots Scale and dimensions Legend or call-outs Spot elevations Required and proposed setbacks Zoning calculations and Zone lot depth line Water/sewer lines - see Sewer Use information, including zone ( , 65/35 or 80/20) and Drainage item on page 4. district and building form Setback/separation Clearly identified location of addition, Legal description verification if applicable 4 hard copies (or 1 by email) of a floor plan that include 4.

8 Labels on all existing and proposed rooms, on all existing and proposed floors 4 hard copies (or 1 by email) of building elevations/sections that include 4. Scale and dimensions Legend or call-outs Required and proposed Required bulk plane Allowed and proposed setbacks and property lines Front and rear base planes maximum height Setback/separation verification Last updated: September 25, 2018 201 W. Colfax Ave., Dept. 205. denver , CO 80202. DEVELOPMENT SERVICES. Single-Family & Duplex Projects PERMITTING guide . Page 4. Submittal Checklist (continued). Listed below are items that while not required at time of initial submittal are necessary before your review can be completed. These can be submitted while your review is ongoing by using the Resubmittal Slip located in this guide . However, for a faster review, include this information with your initial submittal package.

9 Applicant Staff Address: Date: X or N/A X or N/A. Sewer Use & Drainage Permit (SUDP) for new homes, ADUs, and additions. For emailed submittals, show size, type, and location of water, storm sewer, and sanitary sewer lines to start a concurrent SUDP review. Paper submittals must still submit plans separately for SUDP review. Instructions at Energy code compliance: (1) List your method of IECC compliance ( , prescriptive, performance, or ERI) on your plans. (2) Submit two copies of an IECC compliance report, which could be RESCHECK (including the inspection checklist), RESnet HERS, or the IRC/IECC tables. (3) If your work includes new HVAC equipment, submit two copies of the ACCA Manual J and S calculation packages for equipment sizing, and Manual D calculations if new ducts are also proposed. This is not required for interior renovations or for additions that only increase the total area by 30% or less.

10 For 2nd-story additions, attic conversions, or a change of occupancy: Submit two copies of a letter of structural integrity signed and sealed by an architect/engineer for the existing foundation & buildings. (The letter must state they have personally inspected the foundation and building per DBCA ). As applicable, submit two copies of shoring and excavation details signed and sealed by an engineer with calculations per building code policy Admin Shoring is required when the wall slopes of an excavation will be steeper than feet horizontal to 1 foot vertical, or as indicated in the geotechnical investigation report. A separate shoring permit must be obtained before receiving a building permit. Any engineered truss design must bear the engineer's seal and signature and be available onsite at time of building inspection, with truss layout by supplier, per DBCA Engineered design and calculations are required for any design elements that do not conform to the prescriptive requirements of the 2015 IRC, per DBCA Drawings and engineer's calculations for underpinning and sister walls are required for additions or new basements, per DBCA Other approvals: If your project is on a designated parkway, approval may be needed from denver Parks & Recreation before permits can be released.