Example: barber

Installation Guide for Hive Active Heating™

2c – Testing the boiler To test the receiver to boiler connection follow these steps: 1 a number of common boiler controllers that Confirm that the receiver’s front panel is in place and that it is safe to commission the boiler. 2 Restore power to the central heating system - the receiver’s status light should flash amber.

Tags:

  Guide, Installation, Boiler, Installation guide

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Installation Guide for Hive Active Heating™

Related search queries