Example: barber

Installation Instructions for IRiS Recessed Housing ...

Housing Platform InstallationAdjustable bar hangers are captive and pre-installed for use in installations with spacing from 10 to 24 , while maintaining a minimum of spacing aroundplatform. They can be used with joist installations of wood, engineered lumber, steel stud construction and with grid ceilings having T-bars. Hanger bars areof an interlocking design and allow positioning of Housing platform along entire length of bars. Modular plaster frame collar allows fixture to be installed in to 2 thick ceilings. Note: Optional extended collars must be used for ceilings greater than 1 thick. Elements E4 LWW and E4AA are not recommended for ceilings greater than1 thick. Please refer to lamp module and optical element instruction : Non-IC Platform: The P406 TAT Housing is designed for Installation where it will not come in contact with insulation. Thermal insulation must be kept aminimum of three inches (3 ) away from the Housing sides, top and junction box (Fig.)

Customer First Center • 1121 Hwy 74 South • Peachtree City, GA 30269 • 770.486.4800 • 770.486.4801 704295INS Fig. 1 Fig. 3 Fig. 2 Installation Instructions for IRiS® Recessed Housing Platforms P406TAT - Non IC, Shallow and P408ICAT - IC

Tags:

  Installation, Instructions, Housing, Recessed, Iris, Installation instructions for iris recessed housing, Installation instructions for iris, 174 recessed housing

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Installation Instructions for IRiS Recessed Housing ...

1 Housing Platform InstallationAdjustable bar hangers are captive and pre-installed for use in installations with spacing from 10 to 24 , while maintaining a minimum of spacing aroundplatform. They can be used with joist installations of wood, engineered lumber, steel stud construction and with grid ceilings having T-bars. Hanger bars areof an interlocking design and allow positioning of Housing platform along entire length of bars. Modular plaster frame collar allows fixture to be installed in to 2 thick ceilings. Note: Optional extended collars must be used for ceilings greater than 1 thick. Elements E4 LWW and E4AA are not recommended for ceilings greater than1 thick. Please refer to lamp module and optical element instruction : Non-IC Platform: The P406 TAT Housing is designed for Installation where it will not come in contact with insulation. Thermal insulation must be kept aminimum of three inches (3 ) away from the Housing sides, top and junction box (Fig.)

2 1). If fixture is to be switched from wall switch, make sure black power supply wire is connected to the switch. DO NOT connect the white supply wire to theswitch. When installing wall wash element using the 26 watt double twin tube or 42 watt triple twin tube compact fluorescent lamp housings must be installedparallel to the wall (Fig. 2).CAUTION: To avoid possible electrical shock, be sure that power supply is turned off before installing or servicing fixture. For your safety read andunderstand instruction completely before beginning : iris Recessed luminaires (fixtures) are designed to meet the latest NEC requirements and are UL/cUL listed in full compliance with UL attempting Installation of any Recessed lighting luminaire check your local electrical code. This code sets the wiring standards for yourlocality and should be carefully studied before are Airtite and meet or exceed the performance requirements of the Council of American Building Officials 1995 Model EnergyCode (CABO MEC) and prescriptive method used by other Instructions for iris Recessed Housing PlatformsP406 TAT - Non IC, Shallow and P408 ICAT - ICCustomer First Center 1121 Hwy 74 South Peachtree City, GA 30269 704295 INSNon IC HousingJunction BoxJunction BoxTop AccessTop AccessUniversalHangerBracketHousingBar HangersAdjustable CollarPlaster FrameAdjustable CollarPlaster FrameIC HousingDisconnect power at fuse orcircuit breaker beforeinstalling or !

3 Supply conductors (power wires) connectingthe fixture must be rated minimum 90 C. Ifuncertain, consult an !RISK OF FIREDo not install insulation within 3 inches (76 mm) of any part of the P406 TAT (fixture)or in a way that may entrap OF FIRERISK OF ELECTRICAL SHOCK!Customer First Center 1121 Hwy 74 South Peachtree City, GA 30269 704295 INSFig. 1 Fig. 3 Fig. 2 Installation Instructions for iris Recessed Housing PlatformsP406 TAT - Non IC, Shallow and P408 ICAT - ICNotes: (continued) Housing platforms must be installed with edge of plaster frame collar flush to within of bottom of the finished ceiling for proper operation (Fig. 3). The P406 TAT Housing is equipped with universal hanger brackets (Fig. 4). When used this fixture should be supported by main runners or other structurethat is capable of supporting a fixture weight of 10 pounds. Brackets are adjustable by loosening the two adjustment screws, moving brackets up ordown and retightening screws.

4 To facilitate tighter joist spacing remove universal hanger brackets by accessing mounting screws through access mounting screws into Housing to maintain Airtitetm construction. Maximum ceiling thickness is 2 with the appropriate plaster frame collar installed. For 10 spacing, the bar hanger can be shortened by breaking them atscore lines (Fig. 5).P406 TAT ONLYFig. 4 Fig. 5P406 TATONLYA djustment ScrewsMounting ScrewAccess HolesCustomer First Center 1121 Hwy 74 South Peachtree City, GA 30269 704295 INSI nstallation Instructions for iris Recessed Housing PlatformsP406 TAT - Non IC, Shallow and P408 ICAT - ICJoist Installation (Fig. 6 & 7)Step 1 Extend bar hangers to fit between joist andposition mounting tab locater lip tight to bottom ofjoist or framing member. Bar hangers should belevel with bottom of joist or framing 2 Attach bar hangers to joist or framing memberusing appropriate hardware for material 3 Adjust Housing platform position by sliding backand forth on bar hangers to desired may be locked into position by tighteningbar hanger locking screws on Housing Ceiling Installation (Fig.)

5 8)Step 1 Extend bar hangers between the T-bars and slidethe slots in the mounting tabs over the 2 Adjust Housing platform position by sliding backand forth on bar hangers to desired may be locked into position by tighteningbar hanger locking screws on Housing platform.(See Fig. 7)Adjustments Following Ceiling InstallationThe bottom edge of the plaster frame collar must be flush to within of bottom of the finished ceiling for proper operation. The plaster frame collar heightand rotational alignment are adjustable. The plaster frame collar has centered alignment notches to aid in Frame Collar Height and Rotational Alignment (Fig. 9)Height- Loosen the collar height adjustment screws and adjust the plaster frame collar flush with the finished ceiling. When the plaster frame collar is flushto within of the finished ceiling, tighten the collar adjustment If adjustment of the rotational alignment of the collar is necessary, loosen the collar centering thumbnut and the collar locking thumbnut.

6 Rotatethe collar to the desired position and then tighten the collar locking thumbnut. It is not necessary to tighten the collar centering 6 Fig. 9 Fig. 7 Fig. 8 Optional T ScrewCustomer First Center 1121 Hwy 74 South Peachtree City, GA 30269 704295 INSI nstallation Instructions for iris Recessed Housing PlatformsP406 TAT - Non IC, Shallow and P408 ICAT - ICInstallation of Extended Depth CollarsExtended depth collars are available in 1 -1 and 1 -2 ranges for thicker ceilings. To install an extended depth collar, remove the collar height adjustment screws (Fig. 9). Remove the collar, noting the orientation. Insert the extended depthcollar in the same orientation and reinstall the collar height adjustment screws. Adjust the extended depth collar flush to within 1/8 of the finished ceiling andtighten the collar height adjustment Connection (Fig. 10)Provide electrical service according the National Electrical Code or your local electrical code from a suitable junction box to the wiring box located on theplaster : The junction box will accept both metal conduit and non-metallic cable.

7 Note : Review fixture labeling to make sure it is rated for the voltage Installation being used. Make sure no bare wires are exposed outside the wire 1 Provide electrical service according to the National Electrical Code or your local electrical code to the junction box (located on the plasterframe). Supply wire insulation must be rated for at least 90 C. The junction box is also rated for a maximum of 4 No. 12 AWG Branch Circuitconductors suitable for at least 90 C Step 2 Remove junction box 3 Metal Conduit: Remove appropriate round knockout and connect conduit to junction box with proper connector (not included).Non-Metal Cable: Proceed to next 4(Fig. 11) Connect supply wires to wires in fixture using proper sized wire nuts (not included). Be careful not to leave any bare current carryingconductors outside the wire nut connectorsNote: The ground wire at the junction box may need to be secured to a ground AC SupplyConnect white to white, black to black and green (from electrical service) to the bare copper wire in the junction 5 Metal Conduit: Proceed to the next Cable: Open the appropriate wire trap cap and slide the cable into the wire trap.

8 The cable will be held in place and no otherconnector will be 6 Place all connections and excess wiring into the junction box and replace 10 Fig. 11 Customer First Center 1121 Hwy 74 South Peachtree City, GA 30269 704295 INSI nstallation Instructions for iris Recessed Housing PlatformsP406 TAT - Non IC, Shallow and P408 ICAT - ICLow Voltage CautionsWarning: MR16 lamps operate at higher temperatures than conventional incandescent lamps. Allow sufficient time for lamp to cool down before attemptingto replace the : Dimming quartz halogen lamps (MR16) may reduce lamp life. Low voltage fixtures with solid state or magnetic transformers require properdimming equipment. An improper dimmer may cause damage to the transformer and shorten lamp life. Consult factory for dimmer sound may be emitted by the transformer and/or the dimmer in the dimmed your local iris representative for further information on dimming, Installation or lamp Instructions and ApplicationsModules: Modules can be snapped into Housing platform before of after it is installed into the ceiling.

9 When possible, use top access feature to installmodule prior to Housing Installation . Refer to the Installation Instruction sheet for the module being used for proper Installation Note: Use only lamp listed on the element : Installation of element into Housing platform is performed after the Housing platform is installed in the ceiling, the module is installed in housingplatform and the aperture opening has been cut into the ceiling. Refer to the Installation Instruction sheet for the element being used for proper installationand lamping Access and Re-Lamping (Fig. 12): Top access is obtained by loosening the top access screw on the Housing platform and lifting or removing the will allow for inspecting and servicing the fixture without removal. In addition to normal re-lamping from below the ceiling, the P406 TAT and P408 ICAT Housing platforms can be re-lamped using top access. A minimum of 10 clearance above the Housing is recommended to allow top access.

10 The installermust insure proper clearance for access to the Ceilings - P408 ICAT Housing Platform Only (Fig 13): When used in slope ceiling applications, the junction box must be located on the downwardside of the 12 Fig. 13 Junction box must be located onthe downward side of the slopePRECAUCI N: Antes de instalar o darle servicio a la luminaria aseg rese que se encuentre desactivado el suministro el ctrico para evitar un posiblechoque el ctrico. Antes de comenzar con la instalaci n deber leer y comprender completamente estas instrucciones para garantizar :Las luminarias empotradas iris (luminarias) est n dise adas de modo que cumplen los requisitos NEC m s recientes, se encuentrancertificadas por la UL/cUL y cumplen con la norma UL 1598. Revise el c digo el ctrico local antes de intentar la instalaci n de cualquierluminaria empotrada. En este c digo se establecen los est ndares para el cableado en su localidad por lo cual debe estudiarsecuidadosamente antes de plataformas son Airtite y cumplen o superan los requisitos del Council of American Building Officials 1995 Model Energy Code(CABO MEC) as como los m todos establecidos y usados por otros la electricidad enel fusible o interruptor delcircuito antes de lainstalaci n o !


Related search queries