Example: bachelor of science

Issues in Post-Tensioned - Seneca Structural

Pour strips ar e specific to post-ten - sioned structures and are typically lo-cated at the midspan or quarter point of the bay. To provide any crack con-trol benefit, the slabs on each side of the pour strip have to be completely separate when the tendons ar e str essed. Concrete Construction ©January 2006 85

Tags:

  Tensioned, Edison, Needs into

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Issues in Post-Tensioned - Seneca Structural