Example: biology

Manufacturing Process Optimization - Arena Simulation

Manufacturing Process OptimizationArena Simulation Software Enables Manufacturer to Redesign Assembly Line and Reduce CostsBackgroundA major manufacturer of household appliances produces a line of refrigerators. ChallengeA major manufacturer of household appliances wanted to redesign a significant portion of its refrigerator-linear final assembly Process , as well as create and implement an effective and appropriate production schedule for that Objectives: Determine the optimal amount of buffer space for liners. Locate additional floor space for new equipment system under evaluation produced various sizes of refrigerator liners; transferred those whole liners to an area where they were cut, taped, and pressed; then transferred them to an insertion area. Limited resources required that the appropriate mix of liners enter the press area to maximize system equipment since changeovers required significant time.

Manufacturing Process Optimization Arena® Simulation Software Enables Manufacturer to Redesign Assembly Line and Reduce Costs Background A major manufacturer of ...

Tags:

  Process, Manufacturing, Optimization, Arena, Manufacturing process optimization, Manufacturing process optimization arena

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Manufacturing Process Optimization - Arena Simulation

1 Manufacturing Process OptimizationArena Simulation Software Enables Manufacturer to Redesign Assembly Line and Reduce CostsBackgroundA major manufacturer of household appliances produces a line of refrigerators. ChallengeA major manufacturer of household appliances wanted to redesign a significant portion of its refrigerator-linear final assembly Process , as well as create and implement an effective and appropriate production schedule for that Objectives: Determine the optimal amount of buffer space for liners. Locate additional floor space for new equipment system under evaluation produced various sizes of refrigerator liners; transferred those whole liners to an area where they were cut, taped, and pressed; then transferred them to an insertion area. Limited resources required that the appropriate mix of liners enter the press area to maximize system equipment since changeovers required significant time.

2 A buffer area prior to the press area provided the space to bank liners for later use during off-shift or slow production due to upstream failures or bottlenecks. More buffer space was needed for overflow storage and additional floor space had to be located for new equipment purchases. While the company was willing to invest in additional equipment and man-power, they wanted to have a clearer picture of what would be required. The Rockwell Automation Arena consulting team was asked to provide a workable and affordable manufacturer sought to redesign assembly line to gain operational efficiency. This included determining optimal buffer space for liners and better allocation of floor Software Arena Simulation SoftwareA Manufacturing Simulation model was developed using Arena .

3 The highly-detailed model evaluated the dynamic flows of products through the system, evaluating material handling as well as production evaluated various plant redesign alternatives with Manufacturing Simulation model. Analyzed scenarios to measure cost while determining optimal resource requirements to meet production throughput and volume Identified new design that met production goals with a minimal use of system resourcesSolutionA Manufacturing Simulation model was developed using Arena . The highly-detailed model evaluated the dynamic flows of products through the system, including material handling as well as production operations. The high level of detail was required to capture the system sensitivities to the production operations in the system. The analysis clearly showed the amount of buffer space that was required for various production scenarios as well as for multiple equipment layouts.

4 A detailed animation of the system provided validation of the model by displaying each liner as it traversed the system (including system bottlenecks), as well as the dynamic status of the buffers. ResultsBy running an anticipated production schedule through the Manufacturing Simulation model, Arena was able to find a design with the optimal amount of buffer space as well as the minimum system resources necessary to meet production goals. Various cost trade-offs were calculated with the model, balancing equipment and conveyor costs versus production throughput and volume. Publication Arena -AP016A-EN-P August 2014 Copyright 2014 Rockwell Automation, Inc. All Rights Reserved. Printed in USA. Allen-Bradley, Arena , LISTEN. THINK. SOLVE. and Rockwell Software are trademarks of Rockwell Automation, Inc.

5 Trademarks not belonging to Rockwell Automation are property of their respective companies.