Example: quiz answers

Material List: pv cp l s. pv Arched GreenHouse cp m …

S l l .c c p p m Arched GreenHouse p o a m n n Material List: v c s .c c l Page 1 of 3. a m a o p p o All Pipe is 1" Sch 40 PVC. v v m n s l (unless otherwise specified). l .c c .c p p o m p ASSEMBLE BASE FRAME: m .c p a n Item Qty Description v (Do Not Glue any Parts). s c c s c l a A 2 138" Pipe 1. Slide 3 Slip T's (J) onto " Pipes (B). o p o p n . v v and 2 Slip T's (J) onto 135" Pipes (A). m n s B 2 148-1/2" Pipe l (Space as Noted on Drawing). c c p p o m p C 5 228" Pipe a n 2. Connect Pipes at Corners with 3-Way's (K).. v D 4 36" Pipe 3. Drive 5 Stakes (M) into the Ground on s c s .c c l m a E 4 72" Pipe Each Long Side the Base.

pv cp l n s.com pvcplan s. m pv cp p lans.com pvcplans.co m s .com pvcpla n p vcplans.com pvcplans.com l ans.com pvcplans. co pvcplans.com o m pvcp l pvcplans.com pv

Tags:

  Greenhouse, Pvcplan s, Pvcplan, Vcplans, P vcplans, Co pvcplans

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Material List: pv cp l s. pv Arched GreenHouse cp m …

1 S l l .c c p p m Arched GreenHouse p o a m n n Material List: v c s .c c l Page 1 of 3. a m a o p p o All Pipe is 1" Sch 40 PVC. v v m n s l (unless otherwise specified). l .c c .c p p o m p ASSEMBLE BASE FRAME: m .c p a n Item Qty Description v (Do Not Glue any Parts). s c c s c l a A 2 138" Pipe 1. Slide 3 Slip T's (J) onto " Pipes (B). o p o p n . v v and 2 Slip T's (J) onto 135" Pipes (A). m n s B 2 148-1/2" Pipe l (Space as Noted on Drawing). c c p p o m p C 5 228" Pipe a n 2. Connect Pipes at Corners with 3-Way's (K).. v D 4 36" Pipe 3. Drive 5 Stakes (M) into the Ground on s c s .c c l m a E 4 72" Pipe Each Long Side the Base.

2 O p p v m n m n v Leave 2" of Stake Above Ground to Secure Base s F 10 27" Pipe l .c c p p a p a o m G 2 67" Pipe n v H 10 4" Pipe (1-1/4" Sch 40 PVC). s s c l .c l a p I 100-130 1-1/4" Snap Clamps 4" (Circo Item #13). p o p v n m n s J 30 1" Slip-T's (Circo Item #63). l c .c o p p a a o m K 4 1" 3-way Connector (Circo Item #33). n v L 8 1" 90 deg. Elbow .c s c .c l l m a p p p M 10 12+" Ground Stake (Wood or Metal). o v m n s s P 1 20'x13'-4" Top Cover (Plastic,Netting or Shade). l c c J. c o o m p .c p a S 2 12-1/2'x7' End Cover n v v . T 1 78"x38" Door Cover C..c .c s c l l a o p p p p U 1 38"x38" Window Cover 27". v n s s l W 100-130 Self Tapping Screws (3/4" Long).

3 C c p m p o a Z PVC Glue n n v v D. s c c c l a a INSTALL ARCHES: p m o p p p v m n .. (Do Not Glue any Parts). s s l l .c c 1. Slide 2 Slip T's (J) onto Middle Arches p p a m m o n n 228" Pipes (C). v C. v Centered s c l and 3 Slip T's (J) onto End Arches .c a a p o o 228" Pipes (C). p v m n (Space as noted on Drawing). s l l c c p o 2. Assemble Arches To Base as Shown p a m p m m n v 3. Attach 36" Pipes (D) Between Arches, . c s c l c Centered on Top as Shown to a a p p o o . Connect Arches Together. v m n v s l l .c c .c p p o p a m p n v s c s .c l c a o p p o v m n n v s l .c .c c p p a o m p n v s c s c .c l a p p o v n v n s l 36".

4 C .c p p a p o a m Spacing n 27". v s .c c l s l m a m p K. p p o v n A. m n s B. l c M. c .c J. p o m p a o a n v .c s c .c l l a m Plans prepared by: Dean Hunt/JC Designs o p p p December 2002. v n s s l .c c c o p o p a n s l l .c c p p m p o a m n Arched GreenHouse n Hinge v c s .c c l a m a o Page 2 of 3. p p o v v m n s l l .c c .c p p o m p m .c p a Latch n v s c c s c l ASSEMBLE DOOR & DOOR FRAME: a o p o p n . v v m n s Fig. 1. l c 1. Glue 2 Pieces of 1-1/4" PVC x 4" (H) Together c p p o m p a n To Create Hinges as Shown. Make 4 Hinges. Fig. 3.. v s 2. Glue 1 Piece 1-1/4" x 4" (H) to 1 SnapClamp (I). c s .c c l m a To Create Latches as Shown.

5 Make 2 Latches o p p v m n Fig. 2. m n v 3. Slide a Slip-T (J) onto each Door Frame Side (E). s l .c c Locate 4" Down from Top. p p a p a o m F. n 4. Slide Hinges and Latch onto Door Frame Sides v L. s s c l .c l Positioned as Shown in Fig. 3. a p p o p 5. Connect the Two Door Frames with 27" Pipe (F). v n m n Assemble into Slip-T's on Arch and Base on s l c .c F. o p p Front of GreenHouse . a a o m G. n v 6. Slide Door Side Pipe (G) Through Hinges on J..c s c .c l l Door Frame and Then Assemble Door as Shown m a p p p in Fig 1. with Middle Support Pipe (F) Located in o v m n s s l the Center of the Door. Adjust Latch as Needed. c c c o o m p.

6 C p a 7. Slide Hinges to Farthest Positions Up & Down n E. v v . to Hold Door in Position Securely..c .c s c l l a o p p p p v n J. s s l c c p m p o a n n Fig. 4 Latch v v s c c c l a a p m o p p p v m n .. s s l l .c c p p a m m o Hinge n n v v s c l .c a a p o o p v m n Latch s l l c c p o p a m p m m n v . F. c s c l c a a p p o o Hinge L.. v m n v s l l .c c .c p p o p a m p n v ASSEMBLE WINDOW & WINDOW FRAME: s c s .c l c a o p p o F. v m n n v s 1. Slide 2 Slip-T's (J) onto Window Frame Sides (E). l .c .c c F. p Locate 4" Down from Top and 27" Apart. p a o m p n 2. Slide Latch onto 27" Window Frame Top (F) and v J. s c s c .c l 2 Hinges onto 27" Window Frame Bottom (F).

7 A p p o Connect Top and Bottom Window Frame to Side v n v n s l Window Frames and Assemble into Slip-T's on c .c E. p p a p o a Arch and Base on Back of GreenHouse . m n v 3. Slide Window Bottom Pipe (F) Through Hinges on s .c c l s l Window Frame and Then Assemble Window as m a m p p p o v Shown in Fig 4. Adjust Latch as Needed. n m n s l 4. Slide Hinges to Farthes Positions Side to Side c c .c p o m p a o a To Hold Window in Position Securely. n v .c s c .c l l a Plans prepared by: Dean Hunt/JC Designs m o p p p December 2002. v n s s l .c c c o p o p a n s l l .c c p p m p o a m n n Arched GreenHouse v c s .c c l a m a o p p Page 3 of 3.

8 O v v m n s l l .c c .c p p o m p m .c p a n v s c c s c l a o p o p n . v v m n s l COVER AND SECURE THE Arched GREEN HOUSE: c c p p o m p a n . v s 1. Cover the Door with Covering (T) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Door. c s .c c l m a 2. Cover the Window with Covering (U) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Window. o p p v m n m n v 3. Cover the Top with Covering (P) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Top. s l .c c 4. Cover the Ends with Covering (S) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Ends.

9 P p a p a o m n 5. Glue Fittings as Needed. v s s c l .c l 6. Screw Self Tapping Screw (W) into any Clamps, Hinges, or Latches as Needed. a p p o 7. Secure Green House to Gound with Stakes, Sandbags or Blocks. p v n m n 8. Trim Excess Coverings. s l c .c o p p a a o m n v These Plans are Free and Therfore we do not Warrent or Garauntee the Structure Built from Them..c s c .c l l m a p p p o v m n s s l c c c o o m p .c p a n v v ..c .c s c l l a o p p p p v n s s l c c p m p o a n n v v s c c c l a a p m o p p p v m n .. s s l l .c c p p a m m o n n v v s c l .c a a p o o p v m n s l l c c p o p a m p m m n v . c s c l c a a p p o o.

10 V m n v s l l .c c .c p p o p a m p n v s c s .c l c a o p p o v m n n v s l .c .c c p p a o m p n v s c s c .c l a p p o v n v n s l c .c p p a p o a m n v s .c c l s l m a m p p p o v n m n Plans prepared by: Dean Hunt/JC Designs s l c December 2002. c .c p o m p a o a n v .c s c .c l l a m o p p p v n s s l .c c c o p o p a


Related search queries