MODEL HB80RL FAN/LIGHT
U.L. Listed for use in insulated ceilings (Type I.C.) U.L. Listed for use over bathubs and showers when con-nected to a GFCI protected branch circuit Use supply wiring rated for at least 90°C Quiet heavy duty ventilators built with high per-formance blowers. MODEL HB80RL FAN/LIGHT TYPICAL SPECIFICATION Fan/Light unit shall be NuTone Model HB80RL.
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
PRODUCT GUIDE Interior & Exterior Doors (JPG013)
images.thdstatic.comInformation for Replacement weatherstrip Product Identification Weatherstrip Location Weatherstrip Type Color Amount Needed 1. Determine amount needed by measuring each piece to be replaced. Note the location on the door of each type of weatherstrip. 2. For each type of weatherstrip, add all measurements, then add an additional 10%. 3.
Guide, Information, Product, Doors, Exterior, Interior, Product guide interior amp exterior doors, Jpg013
Bottom Mount Refrigerator
images.thdstatic.comDimensions are for planning purposes only. For complete details, see Installation Instructions packed with product. Specifications subject to change without notice. Ref. W10635370B 2/15 2¹⁄₂" (6.3 cm) ¹⁄₂" (1.25 cm) To ensure proper ventilation for your refrigerator, allow for a ¹⁄₂" (1.25 cm) space on each side and at the top.
Undercounter Dishwasher
images.thdstatic.comsupply line. NOTE: If replacing an existing dishwasher, it is recommended to install a new water line (see the “Tools and Parts” section at the front of the guide for part details) and drain hose (supplied) with the new dishwasher. ELECTRICAL REQUIREMENTS You Must Have: 120-volt, 60 Hz, AC-only, 15- or 20-amp, fused electrical supply
LAUNDRY ACCESSORY GUIDE
images.thdstatic.comLAUNDRY ACCESSORY GUIDE. This quick reference guide to laundry accessories will help to make sure you have what . you need for a successful installation in just 3 easy steps. ... If your home was built before 1996 and has only a 3-wire connection, purchase a 3-prong dryer power cord. LG recommends a 4-wire connection and a 4-prong dryer power cord.
Unfinished Cabinetry orders deliver to the store within 3 ...
images.thdstatic.comTake in-stock cabinets home today or order through Express Options®. Express Options orders deliver to the store within 3 weeks; see an Associate or the Special Services Desk to place your order.* Most products are available when ordered through Express Options. In-Stock selection varies by store. Product Selection Unfinished
Electric Tankless Water heaters
images.thdstatic.comYour new electric tankless water heater features advanced water flow rate and temperature sensors designed to modulate power to the heating elements to maintain a user-selected output water temperature between 80°F (27°C) and 140°F (60°C) (subject to incoming water temperature and power of the selected heaters). ...
Electric, Water, Heaters, Tankless, Electric tankless water heaters
PERFORMANCE tankless electric water heaters offer ...
images.thdstatic.comPERFORMANCE™ tankless electric water heaters RHEEM PART NUMBER GPM RATING OF INSERTS PROVIDED CONNECTION SIZE RTE10001A 1.0, 1.5, 2.0 1/2" NPT RTE10001B 2.0, 3.0, 4.0, 5.0 3/4" NPT Optional Inline Flow Regulator • Enhanced outlet temperature control • Install on the outlet side of the heater • Limit maximum volume to the specified flow
Electric, Water, Heaters, Offer, Tankless, Electric tankless water, Tankless electric water heaters offer
Heavy Electric Utility Heater Model: EG7500DGP “USER’S ...
images.thdstatic.com“USER’S MANUAL AND OPERATING INSTRUCTIONS” MODEL: Before the first use of this heater, please read this USER’S MANUAL very carefully. This USER’S MANUAL has been designed to instruct you as to the proper manner in which to assemble, maintain, store, and most importantly, how to operate the heater in a safe and efficient manner.
Manual, Operating, Instructions, S manual and operating instructions
CONCRETE SUBFLOOR REQUIREMENTS NEW …
images.thdstatic.comApproved subfloors include concrete, plywood, OSB, particleboard, chipboard, hardwood (solid, engineered, parquet), tile (ceramic, terrazzo, stone, asbestos, peel and stick), non-cushion sheet vinyl, metal, VCT, DRIcore. Adhered and sound vinyl sheet goods, linoleum and resilient (VCT) tiles: Old vinyl and linoleum tiles or sheet goods normally ...
Electric Residential Hybrid Water Heater
images.thdstatic.comElectric Residential Hybrid Water Heater The purpose of this manual is twofold: one, to provide the installer with the basic directions and recommendations for the proper installation and adjustment of the water heater; and two, for the owner– operator, to explain the features, operation, safety precautions, maintenance and
Electric, Water, Residential, Heaters, Hybrid, Water heaters, Electric residential hybrid water heater
Related documents
Accessible Showers: The Devil is in the Details
media.iccsafe.orgbathing facilities in a Type A units are also the same. Type B units require much less. To limit this discussion, I would like to examine accessible showers. Some of the provi-sions discussed will not apply to showers within Type B units, such as stall size, thresh-olds and access to controls.
Bureau of Reclamation River to feel the cuts.
www.comap.comProblem B: Tackling the Drought Background Lake Mead, a Colorado River reservoir on the Nevada-Arizona border, is the largest water ... out of our sinks, toilets, and showers. You may think this is impossible (and perhaps disgusting), but this technology already exists and is improving. ... (in this case a particular type of water treatment ...
Tropical Cyclone Report Tropical Storm Florence …
www.nhc.noaa.govAfrica early on 2 August, with an area of disorganized showers and thunderstorms ... b. Meteorological Statistics Observations in Florence (Figs. 2 and 3) include subjective satellite-based Dvorak ... smaller than the 5-yr means are shown in boldface type. Forecast Period (h) 12 24 36 48 72 96 120
Report, Types, Tropical, Cyclone, Storm, Shower, Florence, Tropical cyclone report tropical storm florence
Requirements for Electrical Installations
electrical.theiet.org244 Fig 701.2 f) Regulation 701.32.3 (ii) (b) states that Zone 1 is limited by the vertical service “at a distance of 1.20 m from the centre point of the fixed water outlet on the wall or ceiling for showers without a basin (see
MODELS AE50, AE80 & AE110 - Broan-NuTone
www.broan-nutone.comU.L. Listed for use over bathtubs and showers when connected to a GFCI protected branch circuit (ceiling mount only). 3-Year Warranty TYPICAL SPECIFICATION Fan shall be Broan Model AE50 (AE80) (AE110). Fan shall have corrosion resistant galvanized steel housing with four-point mounting capability. It shall be ducted to a
Energy Efficiency Design Summary: Prescriptive Method
www.toronto.caBuilding Type Airtightness Targets ACH @ 50 Pa NLA @ 10 Pa NLR @ 50 Pa Detached dwelling 22.5 21.26 cm 2/m 1.81 in /100ft 0.93 L/s/m2 0.18 cfm50/ft2 Attached dwelling 23.0 22.12 cm 2/m 3.06 in /100ft 1.32 L/s/m2 0.26 cfm50/ft2 The building code requires that a blower door test be conducted to verify the air tightness of the house during
Shelters and Shelter Management Reference Guide
scms.usaid.govb. Prepare reports for relevant agencies. National Disaster Co-ordinators, chief shelter managers, shelter managers . Conduct preliminary inspection to determine if building is habitable. a. Check building for essential facilities in good working condition (running water, toilets functioning, power, kitchen, storage). b.