Example: barber

PLUMBING GENERAL NOTES PLUMBING GENERAL NOTES - …

NETTAARCHITECTSARCHITECTURE - PLANNING - INTERIOR DESIGN1084 ROUTE 22 WEST, MOUNTAINSIDE, NEW JERSEY 07092 TEL: FAX: 973-379-1061 CERTIFICATE OF AUTHORIZATION AC-438 Confidential and Proprietary / DLB Associates 2017 This Drawing Is The Property Of DLB Associates Consulting Engineers, PC. It Was Prepared Exclusively For This Particular Project And Is Limited To This Project Only. Unauthorized Reproduction Or Other Use Of These Drawings Or Ideas Is Prohibited. Last Saved: N:\12\122\12285\12285P , 2/21/17 at 12:03 PM By CNASH Last Printed: 2/21/17 at 4:41 PM By Snyder, Cara Nash12285 Rob JankowskiDLB Project ID:Questions For dlb Call:Phone:dlb associatesOne Penn Plaza, Suite 2601, New York, NY 10119 CONSULTING ENGINEERS, (646) 381 6721 BID SET NEW CLUB HOUSEASH BROOK GOLF COURSE1210 RARITAN RD, SCOTCH PLAINS, NJ 07076 PLUMBING INFORMATION SHEETPLUMBING GENERAL NOTESPLUMBING GENERAL NOTESC ontract Requirements1.

1. Natural Gas Piping 2‐1/2” And Greater Shall Be Schedule 40 Welded Pipe And Fittings. Piping 2” And Smaller Shall Be Schedule 40 Threaded Pipe And Fittings. 2. All Natural Gas Piping Installed Outdoors Or In Corrosive Environments Shall Be Protected With An

Tags:

  Fitting, Pipe, Pipe and fittings

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of PLUMBING GENERAL NOTES PLUMBING GENERAL NOTES - …

1 NETTAARCHITECTSARCHITECTURE - PLANNING - INTERIOR DESIGN1084 ROUTE 22 WEST, MOUNTAINSIDE, NEW JERSEY 07092 TEL: FAX: 973-379-1061 CERTIFICATE OF AUTHORIZATION AC-438 Confidential and Proprietary / DLB Associates 2017 This Drawing Is The Property Of DLB Associates Consulting Engineers, PC. It Was Prepared Exclusively For This Particular Project And Is Limited To This Project Only. Unauthorized Reproduction Or Other Use Of These Drawings Or Ideas Is Prohibited. Last Saved: N:\12\122\12285\12285P , 2/21/17 at 12:03 PM By CNASH Last Printed: 2/21/17 at 4:41 PM By Snyder, Cara Nash12285 Rob JankowskiDLB Project ID:Questions For dlb Call:Phone:dlb associatesOne Penn Plaza, Suite 2601, New York, NY 10119 CONSULTING ENGINEERS, (646) 381 6721 BID SET NEW CLUB HOUSEASH BROOK GOLF COURSE1210 RARITAN RD, SCOTCH PLAINS, NJ 07076 PLUMBING INFORMATION SHEETPLUMBING GENERAL NOTESPLUMBING GENERAL NOTESC ontract Requirements1.

2 All PLUMBING Work Shall Be Prepared In Strict Accordance With The Specifications And With TheCurrently Adopted Edition Of The Prevailing State Code As Well As All Local Regulations That MayApply. In Case Of Conflict Between The Contract Documents And A Governing Code Or OrdinanceThe More Stringent Standard Shall Contractor Shall Provide All Required Labor, Materials, Equipment, And Services Necessary ToAccomplish A Safe And Complete Installation Of The Systems Indicated On The Drawings. AllMaterial And Methods Shall Be In Strict Accordance With All Authority Having JurisdictionRequirements. Work Shall Be Performed In A Neat And Workmanlike Contractor Shall Obtain All Necessary Permits, Licenses, And Certificates Required By TheAuthority Having Jurisdiction.

3 This Shall Include, But Is Not Limited To All Required BuildingDepartment Filing, Inspections, And Final Closeout Of The Scope Of Work As Outlined In These Documents Ends At A Distance Of 5 Feet Outside TheBuilding Wall. Coordinate Connection With Civil Engineer And Local Utility The Contractor Shall Furnish A Written Guarantee To Replace Or Repair Promptly And AssumeResponsibility For All Expenses Incurred For Any Workmanship And Equipment In Which DefectsDevelop Within One Year From The Date Of Acceptance By Owner, This Work Shall Be Done AsDirected By The Owner. The Contractor Shall Incur All Expenses That Result From Such Contractor Shall Visit The Site Prior To Submitting A Bid To Verify Existing Conditions And ConfirmSizes And Locations Of Existing Provide All As Built Drawings To GC To Verify Completion Of Work And For Owner's Existing Site Utility Connections, Invert Elevations, And Locations Shall Be Verified Prior ToBeginning Materials Approved By The Architect Or Engineer To Be Stored On Site Shall Be Stored In AnOwner Designated Location.

4 Off Site Storage Must Be Arranged For Materials And Equipment NotSuitable For On Site Storage Or Items Not Applicable To The Current System At The End Of Each Work Day The Contractor Shall Leave The Job Site In A Neat Condition AndRemove All Construction Debris From The All PLUMBING Work Shall Be Coordinated With All Other Trades Before Proceeding With TheInstallation. No Changes Are To Be Made In PLUMBING Layout Without Written Permission by TheArchitect or Drawings Are Diagrammatic As Shown. Exact Routing And Arrangements Of Systems Shall BeCoordinated With All Other Trades, The Structural Drawings, Architectural Drawings, And AllExisting Field Exact Dimensions And Locations Of PLUMBING Fixture Rough In Must Be Coordinated With TheArchitect And GENERAL Installation1.

5 All Exposed Piping Penetrations Through Walls, Floors, And Ceilings Shall Be Sealed WithApproved Fire Proofing Method and Escutcheons By PLUMBING Provide And Install Water Tight Piping Sleeves And Seal Systems At Exterior Concrete Walls AndSlabs On Grade For Service Piping Entries Into Building. Provide For Additional Waterproofing AtExterior Of POEs, Surrounding Piping / Sleeves As Necessarily With Approved No Piping Shall Be Run Exposed In Finished Areas Unless Specifically Stated Otherwise In Provide Dielectric Fittings, Couplings, Or Spacers Whenever Dissimilar Materials Are Joined OrOtherwise Come Into Contact With Each Where Overhead Construction Does Not Permit Fastening Of Supports The Contractor ShallProvide Supplementary Steel Required For Supporting Piping Any Piping Exposed To Freezing Conditions Shall Be Insulated And Heat Traced, This Includes AnySanitary Drainage Piping And Traps Installed In Unheated Spaces.

6 Heat Traced To Be Installed ByPlumbing Contractor And Coordinated With Electrical Contractor For For Water and Gas Piping: Expansion Loops Or Fittings Shall Be Provided At All Building ExpansionJoints And For Every 100 Feet Of Straight Piping Run. Provide Anchor Points And Restraints AsRequired By Manufacturer Installation Fixtures & Equipment1. All Fixtures Shall Be Provided With Standard Trap And All PLUMBING Fixture Flow Rates Shall Meet Minimum Flow Requirements As Outlined ByGoverning PLUMBING Code And Local Jurisdiction Federal Lead Free Legislation Effective January 4, 2014 Mandates That The Wetted Surface OfEvery pipe , Fixture, And fitting Sold Or Installed In Potable Water Applications Shall Not ContainMore Than Lead By Weight.

7 All Products Submitted Shall Be Certified Lead Trap Primers Shall Be Furnished For All Drains Not Receiving Continuous Discharge. WherePractical, Flow Type Trap Primers Shall Be Installed On The Cold Water Supply To Lavatory Trap Primers Shall Be Used In All Other Locations. Differential Pressure Trap PrimersAre Not Permitted For Use Under Any Water Systems1. All Work Shall Be Properly Tested, Balanced And Cleaned And Completely Insulate All Water Piping Except Where Exposed To Fixtures With Fiberglass InsulationWith Non Combustible UL Rated Vapor Barrier Or Closed Cell Flexible Insulation Equal ToArmaflex II. Breaks In Insulation At Hangers Will Not Be Provide Shut Off Valves On Hot And Cold Water Supply Pipes At Each Fixture, At Each BranchTake Off, And At All Connections To Water Heaters And PLUMBING At Each Hot Water Return Piping Connection To The Hot Water Supply Piping The Contractor ShallFurnish And Install Isolation, Balancing And Check Valves.

8 Balance to 1 GPM Unless Provide Bellows Type Water Hammer Arrestors At Each Flush Valve Or Bank Of Flush Valves,Dishwashers, And All Fast Closing Valves. Where Installation Is Not Accessible CoordinateLocation Of Access Panels With The Access Panels Shall Be Provided As Necessary To Allow For Access To Valves, Trap Primers AndWater Hammer Arrestors. All Access Panels Shall Be Provided And Installed By The GeneralContractor. PLUMBING Contractor Shall Be Responsible For Their / Storm Systems1. No PVC Or ABS Piping Shall Be Used In Any Above Grade PLUMBING Cleanouts In Horizontal Drainage Lines Shall Be Spaced At Intervals Not To Exceed The Following:A. 2 1/2" Or Less: 25 FeetB.

9 3" and 4": 50 FeetC. More Than 4": 85 Feet3. Install All Required Cleanouts To Clear Equipment And Fixtures. Cleanouts Shall Not Be Installed InElectrical Closets, IT Rooms, Or Any Similar Critical Or Water Sensitive Sanitary Piping 3 And Greater Shall Have A Minimum Slope Of 1/8 Inch Per Foot. Sanitary PipingLess Than 3 Shall Have A Minimum Slope Of 1/4 Inch Per Fixture Vent And Branch Vent Piping Shall Be Installed Free Of Sags And Drops And Be SlopedToward The Connection To The Sanitary Drainage System. All Fixtures Shall Be Vented InAccordance With Governing State And Local PLUMBING All Horizontal Storm Drainage Piping Shall Be Insulated To Prevent Condensation On The Shall Extend Vertically To The Underside Of The Drain Gas SystemsGeneral Requirements1.

10 Natural Gas Piping 2 1/2 And Greater Shall Be Schedule 40 Welded pipe AndFittings. Piping 2 And Smaller Shall Be Schedule 40 Threaded pipe And All Natural Gas Piping Installed Outdoors Or In Corrosive Environments Shall Be Protected With AnApproved Corrosion Resistant, UV Resistant Enamel Coating Or All Corrugated Flexible Natural Gas Connections Shall Be Properly All Natural Gas Piping Shall Be Pressure Tested And Leak Tested With Approved Non CorrosiveLeak Detecting Fluid Or Other Approved Leak Detection Method Prior To System Kitchen Installations Shall Include A Natural Gas Shut Off Valve Wired To Emergency Push ButtonShut Off Switches At All Paths Of Egress. Shut Off Valve Shall Be For Natural Gas Supply Requirements1.