Example: barber

Port of Manila Schedule of Cargo Handling Tariff at Manila ...

Manila international container terminal Port of Manila Schedule of Cargo Handling Tariff at Manila international container terminal And South Harbor I. CONTAINERIZED Charges (Stevedoring) Non-Self Sustaining Vessel i. CY/FCL Basis Loaded 20 footer /box US $ 40 footer /box Empty 20 footer /box 40 footer /box ii. CFS/LCL Inbound/Outbound 20 footer /box 40 footer /box iii. Shifting on Board /box iv. Shifting via dock/barge/vice versa SVD Loaded 1-4 TEU/bay (or equivalent units) /box Above 4 TEU/bay (or equivalent units) But not more than 15 units/bay /box Above 15 units/bay /box SVD Empty 1-4 TEU/bay (or equivalent units) /box Above 4 units/bay (or equivalent units) /box v.

Manila International Container Terminal Port of Manila Schedule of Cargo Handling Tariff at Manila International Container Terminal And South Harbor

Tags:

  International, Schedule, Animal, Handling, Graco, Container, Terminal, Manila schedule of cargo handling, Manila international container terminal

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Port of Manila Schedule of Cargo Handling Tariff at Manila ...

1 Manila international container terminal Port of Manila Schedule of Cargo Handling Tariff at Manila international container terminal And South Harbor I. CONTAINERIZED Charges (Stevedoring) Non-Self Sustaining Vessel i. CY/FCL Basis Loaded 20 footer /box US $ 40 footer /box Empty 20 footer /box 40 footer /box ii. CFS/LCL Inbound/Outbound 20 footer /box 40 footer /box iii. Shifting on Board /box iv. Shifting via dock/barge/vice versa SVD Loaded 1-4 TEU/bay (or equivalent units) /box Above 4 TEU/bay (or equivalent units) But not more than 15 units/bay /box Above 15 units/bay /box SVD Empty 1-4 TEU/bay (or equivalent units) /box Above 4 units/bay (or equivalent units) /box v.

2 Foreign Transshipment (without rework) 20 footer /box 40 footer /box vi. Empty Flat Racks Two to four 20-foot empty flatracks bundled as one unit /bundle Two to four 40-foot empty flatracks bundled as one unit /bundle 1 Cargo Handling Tariffs Manila international container terminal B. Cargo Charges (Arrastre) vii. FCL Import 20 footer /box Php 3, 40 footer /box 8, viii. FCL- Export 20 footer /box 3, 40 footer /box 6, 1. SHUT-OUT Export an added charge on top of the arrastre (export) charge of: Full/Loaded /box 3, Empty /box 1, ix. CFS/LCL Import and Export shall be charged based on actual weight or measurement of LCL cargoes applying the present general Cargo rate.

3 C. Dangerous Cargo to be charged in accordance with PPA-AO No. 02-89 dtd. 08/14/89 and PPA-AO No. 01-90 dtd. 03/01/90 II. NON-CONTAINERIZED b. Vessel Charges (Stevedoring) Basis Non Palletized Palletized i. General Cargo 2. Bagged Cargoes (Cargoes In bags, sacks) /RT Php 3. Frozen Cargoes a. Unpacked Fish /RT - b. Fish in Cartons /RT - (Cargoes In crates, boxes, cases, drums, etc.) /RT ii. Heavy Lift 1. 5 20 tons /MT - 2. Over 20 tons /MT - iii. Steel Products /MT iv. Logs /1000 Bd. Ft - v. Lumber /1000 Bd. Ft - vi. Bulk 1. Free Flowing /MT - 2. Non-Free Flowing /MT - vii. Shifting within hatch 150% of applicable rates 2 Cargo Handling Tariffs Manila international container terminal viii.

4 Shifting from hatch to another or from one hold to dock/pier or barge or vice versa 200% of applicable rates NB The above charges shall be exclusive of equipment except for item 6 Bulk cargoes where clamshell shall be provided. c. Cargo Charges (Arrastre) Import Basis Non Palletized Palletized i. General Cargo Cargoes (cargoes in bags, sacks) /RT Php 2. Frozen cargoes a. Unpacked Fish /RT - b. Fish in Cartons /RT - Others (Cargoes in crates, boxes, cases, drums, etc.) ii. Steel Products /RT iii. Logs /1000 Bd. Ft - iv. Lumber /1000 Bd. Ft - v. Heavy Lift 1. 5 15 tons /MT - 2. Over 15 to 20 tons /MT - 3.

5 Over 20 tons /MT - vi. Bulk Cargo /MT - vii. Checking Charge (shipside delivery) /RT d. Roll on Roll off Charges i. Vessel Charges (Stevedoring) /RT ii. Cargo Charges (Arrastre) /RT d. Dangerous Cargo - to be charged in accordance with PPA-AO No. 02-89 dtd. 08/14/89 and PPA-AO No. 01-90 dtd. 03/01/90 3 Cargo Handling Tariffs Manila international container terminal III. MISCELLANEOUS CHARGES (payable by whoever requested for services) a. CONTAINERIZED i. Lifting and closing of hatch covers, lids, Basis and supporting beams (non-self sustaining vessels only) /hatch US $ ii. Making fast and letting go lines Size of Vessel: Less than 10,000 GRT /vessel US$ 10,000 20,000 GRT /vessel 20,000 30,000 GRT /vessel above 30,000 GRT /vessel iii.

6 Pier lighting (night operations /hour 1800H to 0600H) iv. Reefer Charges (Plug in/out) /box/hour or fraction 20 footer 40 footer - Reefer vans for export shall be subject to one (1) hour minimum - A minimum of six (6) hours shall be imposed on import reefer vans 20 footer / box PHP 40 footer /box v. 1. Turnover Survey gang/hour US$ 2. Shoring/Recouping (Labor Cost Only) gang/hour Materials, subject to the determination of both parties based on actual usage. FCL /box PHP 7, 100% examination /box 7, Over 10% but below 100% /box 3, exam BOC Spot Checking exam /box 1, vi. Equipment Rental (includes operator) 4 Cargo Handling Tariffs Manila international container terminal Crane /hour or fraction US $ thereof 2.

7 Crane 100 ton mobile crane minimum of twelve (12) container moves /minimum EQUIPMENT HIRE Basis Crane (Mobile) 100 Tons Capacity /hour US$ Crane 50 Tons Capacity /hour Crane 25 Tons Capacity /hour Crane container Barge Tango /hour Forklift 20 Ton Capacity /hour Forklift 10 Ton Capacity /hour Forklift 3 Ton Capacity /hour Toploader 25 Ton Capacity /hour Toploader 35 Ton Capacity /hour Shifter/Straddle Carrier 25 Ton Capacity /hour Tractor Head /hour Truck, Stake /hour Chassis with Truck/Tractor 20 Footer /box 40 Footer /box (Outside Rental) /hour PHP vii. Transferring/storing of dangerous cargoes at the Dangerous Cargo Area (DCA)- (Per PPA MC 12-2004 For MICT & PPA MC-02-2005 for South Harbor) Containerized Dangerous Cargo /TEU PHP 4, LCL (Non Palletized) /RT LCL (Palletized) /RT The charges shall be distinct and in addition to the premium charges prescribed under PPA Admin.

8 Order no. 02-89 ( Cargo Handling Rate for Dangerous/Obnoxious Cargoes). Penalty Charges Stand by Charges a. Manpower gang/hour US $ Applies to vessel operations when labor is engaged to work but cannot work when causes are attributable to vessel s fault, under the ff. conditions: 5 Cargo Handling Tariffs Manila international container terminal a. Waiting for vessel to dock b. Breakdown of vessel gear c. Waiting for Cargo /truck d. Men engaged but not put to work Standby time charges due to inclement weather shall not apply except when the Cargo owner/consignee insists on the deployment of a gang or objects to the knocking off of the gang during or impending inclement weather.

9 Crane /minute US $ Equivalent to four (4) container Lifts per hour or fraction thereof /hour b. NON-CONTAINERIZED fast & letting go lines Size of Vessel: Less than 10,000 GRT /vessel Php 10,000 20,000 GRT /vessel 20,000 30,000 GRT /vessel Over 30,000 GRT /vessel 1, ii. Pier lighting (night operations /hour 1800H to 0600H) iii. Turnover Survey gang/hour 1, (Labor Cost Only) gang/hour Materials subject to the determination of both parties based on actual usage. 3. Equipment rental (includes operator) a. On-Dock Crane (Mobile) 100 Tons Capacity /hour Php 12, Crane 50 Tons Capacity /hour 5, Crane 25 Tons Capacity /hour 3, Forklift 20 Tons Capacity /hour 1, Forklift 10 Tons Capacity /hour Forklift 3 Tons Capacity /hour Toploader 25 Tons Capacity /hour 2, Toploader 35 Tons Capacity /hour 3, Shifter/Straddle /hour 3, Carrier 35 Tons Capacity Tractor Head /hour Tractor Stake /hour b.

10 On-board Forklift 3 Tons Capacity /hour rental pallets /hour 6 Cargo Handling Tariffs Manila international container terminal Penalty Charges Standby time charges shall be applied on delays beyond the control of the Cargo Handling operator, only under the following circumstances: a. Waiting for vessel to dock b. Breakdown of vessel s gear c. Waiting for Cargo /truck/barges; d. Non-readiness of the vessel; e. Gang cancelled by client due to instances other than the above. a. On-board gang/hour 2, b. On-dock gang/hour 2, Standby time charges due to inclement weather shall not apply except when the Cargo owner/consignee insists on the deployment of a gang or objects to the knocking off of a gang during or impending inclement weather.


Related search queries