III. Do the plans show the pile capacity ? (i) allowable foundation capacity, before and after accounting for negative skin friction, (ii) allowable tension load, lateral load, where applicable. Items to be shown on piling plan
Tags:
Load, Capacity, Lateral, Lateral load
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Handbook to BC1: 2012
www1.bca.gov.sgTable 3.2f Design Strength of American (AWS) Stud Shear Connectors 11 Table 3.3a Design Strength of Japanese (JIS) Structural Steels 11 Table 3.3b Design Strength of Japanese (JIS) Non-Preloaded Bolts 12 Table 3.3c Design Strength of Japanese (JIS) Preloaded Bolts 12
UPDATED GUIDANCE NOTE ON IMPROVING VENTILATION …
www1.bca.gov.sgoutdoor air quality is poor. Air-conditioning should be reduced or turned off when doors and/or windows are opened. b. Consider adding dedicated outdoor air supply and/or exhaust7. c. Operate exhaust fans (e.g. in toilets, kitchens) at full capacity to expel air from indoor spaces. Keep windows or other openings (e.g. back door)
CODE ON ENVELOPE THERMAL PERFORMANCE FOR …
www1.bca.gov.sgA2 Thermal Transmittance (U-value) 15 A3 Surface Air Film Resistance 15 A4 Air Space Resistance 16 . 3 APPENDIX B - Shading Coefficient of Sun Shading Devices B1 Basic Solar Data B1.1 Solar geometry 18 ... B2.3 Determination of ‘G’ factor 22 B3 Examples B3.1 Example A – finding the effective shading coefficient 26 ...
SPECIFIC REGISTRATION REQUIREMENTS FOR MECHANICAL ...
www1.bca.gov.sgMechanical, Electrical/Electronics Engineering or equivalent awarded by BCA Academy, Nanyang Polytechnic, Ngee Ann Polytechnic, Republic Polytechnic, Singapore Polytechnic, Temasek Polytechnic or such other diplomas or qualifications as approved by BCA from time to time. For ME05, an EMA electrician can be considered as one of the “T” for ...
CODE OF PRACTICE ON Buildability
www1.bca.gov.sgContents CODE OF PRACTICE Introduction 1 1 Scope 2 ... The following Act and Regulations have relevance: a. The Building Control Act. b. ... The various types of building development are categorised in Table A. Buildings listed
Guide on FM Procurement
www1.bca.gov.sgProcurement is a key enabler to FM transformation and in creating lead demand in the public sector. The FMIC’s Procurement Taskforce, set up to review and strengthen FM procurement practices, has consulted the Centre of Excellence for FM (JTC), various Government Procuring Entities (GPEs) and FM providers to prepare this Guide on FM Procurement.
Circular on Further Simplified Claim Process for ...
www1.bca.gov.sgTo: All firms registered in BCA’s Contractors Registration System (CRS) Circular on Further Simplified Claim Process for Prolongation Costs in Public Sector Construction Contracts due to COVID-19 Events Further to the BCA circular dated 27 …
System, Registration, Contractor, Contractors registration system
GREEN MARK AWARD
www1.bca.gov.sgCentral Library at National University of Singapore ... SUPER LOW ENERGY (SLE) BUILDINGS . 7 CONTENT PAGE Tiong Bahru Market Ulu Pandan Bus Depot (SBST) United World College of South East Asia ... 7 north coast 79 Anson Road Admirax …
STRATA MANAGEMENT GUIDE : 1
www1.bca.gov.sgThe MC, in respect of a strata title plan, is composed of the subsidiary proprietors (SPs) within the specific strata title plan. A SP is a purchaser to whom ownership of a unit has been transferred, as shown on the subsidiary strata certificate of title. 1.2 The Building Maintenance and Strata Management Act (BMSMA) is designed to
Management, Strata, Strata management, Strata management act
Ops START - bca.gov.sg
www1.bca.gov.sg1. Tilt the buffer bottle 2. Fill the extraction tube with buffer fluid until it reaches the fill-line of the extraction tube 3. Close the nozzle (blue cap) Test cartridge, swab stick, and extraction tube with buffer solution to be provided to the employee to conduct self-swabbing.
Related documents
IS 2911-1-3 (2010): DESIGN AND CONSTRUCTION OF PILE ...
law.resource.orgJan 03, 2010 · The portion relating to load test on piles has been covered in a separate part, namely, IS 2911 (Part 4) : 1984 ’Code of practice for design and construction of pile foundations: Part 4 ... Procedures for calculation of bearing capacity, structural capacity, factor of safety, lateral load capacity, overloading, etc, have also been modified to ...
IS 2911-1-1 (2010): DESIGN AND CONSTRUCTION OF PILE ...
law.resource.orgJan 01, 2010 · 3.10 Initial Load Test — A test pile is tested to determine the load-carrying capacity of the pile by loading either to its ultimate load or to twice the estimated safe load. 3.11 Initial Test Pile — One or more piles, which are not working piles, may be installed if required to assess the load-carrying capacity of a pile. These
Piles Capacity - Reference Manual
hetge.comPiles Capacity is the “Estimator for Deep Foundation Designers”, which is built to be employed by ... Ultimate and allowable compressive load bearing capacities of bored piles (drilled shafts) with ... Coefficient of lateral earth pressure K is :
Manual, Reference, Load, Capacity, Pile, Lateral, Piles capacity reference manual, Piles capacity
Pile Foundation Design[1]
mtp.itd.co.th1.4.3 Friction or cohesion piles Carrying capacity is derived mainly from the adhesion or friction of the soil in contact with the shaft of the pile (see fig 1.2). Figure 1-1 End bearing piles Figure 1-2 Friction or cohesion pile 1.4.4 Cohesion piles These piles transmit most of their load to the soil through skin friction. This
Recommended Practice for Design, Manufacture, and ...
www.pci.orgaxial loads, as well as lateral loads caused by wind, waves, and earthquakes. In marine environments, these piles can re-sist corrosion caused by salt water and by thousands of cycles of wetting and drying. 1.1 Scope of report This report contains recommendations and guidelines for the design and detailing of prestressed concrete piles based
STRUCTURAL DESIGN HIGHLIGHTS OF ACI 318-19 PART 2 of …
asceneworleans.orgNov 14, 2019 · In-plane shear; capacity reduction factor 0.75. Nominal in-plane shear strength for cast-in-place slabs of normal weight concrete: V n = (slab thickness)(slab plan dimension in the direction of the load –openings = ^depth)( 2sqrt(f [c) + (area of steel reinforcing parallel to load per inch of slab width perpendicular to load / slab
FOUNDATION DESIGN AND CONSTRUCTION
www.cedd.gov.hk4.2.5 Driven Cast-in-place Concrete Piles 58 4.3 SMALL-DISPLACEMENT PILES 58 4.3.1 General 58 4.3.2 Steel H-piles 58 4.3.3 Open-ended Steel Tubular Piles 59 4.4 REPLACEMENT PILES 59 4.4.1 General 59 4.4.2 Machine-dug Piles 59 4.4.2.1 Mini-piles 60 4.4.2.2 Socketed H-piles60 4.4.2.3 Continuous flight auger piles 60
Foundations, Design, Construction, Pile, Foundation design and construction
DEEP FOUNDATIONS – Pile Foundations
www.ced.ceng.tu.edu.iq2 o For Piles in Clay; Equation (1) will be: Since for piles in normally consolidated clay the undrained condition is control, φu =0 and δ=0 ∴ ks.σv′.tanδ=0 and c =cu =qu / 2.Also, for φu =0: Nc =9(from Skempton chart for circular or square), Nq =1.0 and Nγ =0.0. In addition to, the difference between [Ab.q−W p] is only in (γconc.−γsoil)which is very small, that can be ...