Example: stock market

SAFE WORK METHOD STATEMENT (Job Safety Analysis …

SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). Picture of a typical Genie E-Series Scissor Lift This Safe Work METHOD STATEMENT is submitted to: COMPANY: REFERENCE: SWMS-ELECTRIC-SLAB SCISSORLIFT. SITE ADDRESS: JOB DETAILS: Contact: Is designed for Elevating Personnel, Tools &. Mobile Number : Equipment to work areas. This Safe Work METHOD STATEMENT is approved by: NAME: (GENIE TM) POSITION: SIGNATURE: DATE: TIME: PHONE NUMBER: MOBILE NUMBER: This Safe Work METHOD STATEMENT was prepared by: NAME: JOHN YANNAKOPOULOS POSITION: CONSULTANT. SIGNATURE: DATE: 01/02/10 TIME: 7AM. PHONE NUMBER: 0417669048 MOBILE NUMBER: 0417669048. HAZARD IDENTIFICATION R. JOB SEQUENCE.

SAFE WORK METHOD STATEMENT (Job Safety Analysis Worksheet) E –Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069) ... Commissioning,Installation,Erection & Maintenance: Operator not licensed, trained or qualified to Operate Machine could result in the machine ...

Tags:

  Installation, Methods, Testament, Method statement

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of SAFE WORK METHOD STATEMENT (Job Safety Analysis …

1 SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). Picture of a typical Genie E-Series Scissor Lift This Safe Work METHOD STATEMENT is submitted to: COMPANY: REFERENCE: SWMS-ELECTRIC-SLAB SCISSORLIFT. SITE ADDRESS: JOB DETAILS: Contact: Is designed for Elevating Personnel, Tools &. Mobile Number : Equipment to work areas. This Safe Work METHOD STATEMENT is approved by: NAME: (GENIE TM) POSITION: SIGNATURE: DATE: TIME: PHONE NUMBER: MOBILE NUMBER: This Safe Work METHOD STATEMENT was prepared by: NAME: JOHN YANNAKOPOULOS POSITION: CONSULTANT. SIGNATURE: DATE: 01/02/10 TIME: 7AM. PHONE NUMBER: 0417669048 MOBILE NUMBER: 0417669048. HAZARD IDENTIFICATION R. JOB SEQUENCE.

2 (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Operator must be trained and Commissioning, installation ,Erection competent to use this & Maintenance: 4 : EWPAA Yellow . Operation of EWP Operator not licensed, trained or Card- SL Category. ( Scissor lift Type) qualified to Operate Machine could If the Operator is not familiar with result in the machine being used in the specific make and model an unsafe condition. instruction is to be provided using the Manufacturer's Operators Manual. Commissioning, installation ,Erection & Maintenance: Prior to using EWP, Operator must Failure to consult logbook & 4 conduct Pre-Operational Checks Operation of EWP conduct Pre-Operational Daily using the EWP's logbook ( Scissor lift Type ) Checks may mean machine is /Operators Manual as a reference.

3 Being used in an unsafe condition. SWMS: Genie Slab Scissor Lift Issue/Rev: A/1 Effective Date: 01/08/10 Rev date 10/12/2012. SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). (Page 2). HAZARD IDENTIFICATION R. JOB SEQUENCE. (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Crushing (Squashing): 3 Barricade off work area and place warning signs. Tools or material falling from Platform. Operation of EWP. Someone being crushed when 4 Clear all personnel from the area slewing, raising or lowering Platform before raising, lowering or slewing the Platform.

4 4 If working under overhead structures Person(s) in Platform being crushed overhead steelwork, under a Operation of EWP between the Platform & overhead bridge, in a tunnel etc if the Scissor is structure(s) if the Scissor Lift is driven to be driven on uneven ground or up/down a kerb or slope etc., under overhead structures on uneven remember the leverage factor and ground or up & down kerbs or slopes ensure ample clearance above the etc. platform to cater for any unexpected amplified upward platform movement ie: centimetres of movement at ground level can result in metres of sudden unintended/unexpected Upward movement at the platform. Operator Awareness-Never allows Operation of EWP Body or limbs can be crushed if not 4 any part of body through, under or kept clear of Scissor Lift Assembly. between Scissor arms.

5 SWMS: Genie Slab Scissor Lift Issue/Rev: A/1 Effective Date: 01/08/10 Rev date 10/12/2012. SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). (Page 3). HAZARD IDENTIFICATION R. JOB SEQUENCE. (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Prior to any operation carryout site inspection as part of the Safe Work Plan, Inspect the entire work area Operation of EWP EWP tipping or rolling over. 4 and all ground conditions where the machine will travel during operation. Ensure load on platform is secure & evenly distributed. Do not Operation of EWP EWP tipping or rolling over.

6 4 exceed Manufacturer's rated capacity. When elevated, drive only on ground capable of supporting its weight(no potholes or soft spots). Do not tie off the Platform to any fixed structure or plant, or use the platform as an anchor point for attaching rope, wire, etc . Do not use, elevate or leave Operation of EWP EWP tipping or rolling over. 4 elevated in high winds that exceed the machines maximum wind rating ( m/s ). Do not attach Sail Hazards such as signs, banners, shade cloth the platform. Do not perform work that will Operation of EWP EWP tipping or rolling over. 4 subject the boom to a side force greater than the machines rated side loading capacity (ie: 200N &. 400N) eg: pushing & pulling on a fixed structure when working from the platform. SWMS: Genie Slab Scissor Lift Issue/Rev: A/1 Effective Date: 01/08/10 Rev date 10/12/2012.

7 SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). (Page 4). HAZARD IDENTIFICATION R. JOB SEQUENCE. (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Overhanging loads such as pipes must not be lifted with the boom unless done so with a rack approved by the manufacturer. Operation of EWP EWP tipping or rolling over. 4 NB: Overhanging loads can alter the boom's centre of gravity and cause it to tip over. If fitted with an oscillating axle and the Scissor is on uneven ground and needs to be driven use extreme care. Operation of EWP EWP tipping or rolling over.

8 4 If one or more wheels are not making full contact with the ground, exercise extreme caution and fully lower the platform(if safe to do so) then drive/reposition machine so all wheels make full contact with the ground again. Never allow any personnel to work Operation of EWP Parts of the Plant collapsing 4 underneath any part of the Boom. Note: Do not walk or work under raised hydraulics. Avoid congested work areas. Operation of EWP Being trapped between the plant & 4 Remain within the confines of the materials, or fixed structures lift platform when operating. Ensure sufficient clearance between the platform and overhead obstructions. SWMS: Genie Slab Scissor Lift Issue/Rev: A/1 Effective Date: 01/08/10 Rev date 10/12/2012. SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069).

9 (Page 5). HAZARD IDENTIFICATION R. JOB SEQUENCE. (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Never use Ladders or Boxes to gain extra height. Operation of EWP Operator(s) falling from Platform 5 Never stand on Handrails to gain extra height. If Risk Assessment highlights the wearing of a Full Body Harness &. Lanyard the lanyard must be attached to the designated anchor point. Ensure all Safety devices such as audible and visual alarms are operating when the EWP is in Operation of EWP Driving into bystanders/other workers 5 motion. Clearly define the work area. Operation of EWP Unexpected movement of Plant 4 Keep all personnel clear. Electrical: Maintain mandatory minimum clearances from overhead power Electrocution from Overhead Power 5 lines as defined by Regulatory Operation of EWP lines.

10 Authorities. Barricade off work areas. Insulate power lines Look Up and Live(before and during operation). SWMS: Genie Slab Scissor Lift Issue/Rev: A/1 Effective Date: 01/08/10 Rev date 10/12/2012. SAFE WORK METHOD STATEMENT . (Job Safety Analysis Worksheet). E Series Slab Scissor Lifts (Models: GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2632, GS-3232, GS-2046, GS-2646, GS-3246, GS4069). (Page 6). HAZARD IDENTIFICATION R. JOB SEQUENCE. (What can affect Safety ) I CONTROLS THAT WILL BE USED. (Outline each task to do ASSESS THE RISK S (Safe Work Procedures). the job). (What could happen) K. Inspect cords & plugs for nicks, cuts, damage & test and tag date Operation of EWP Electric shock from damaged 5 before use. extension cords when charging Ensure cords are protected from batteries or supplying power to the falling objects, pinch points, or Scissor Lift.


Related search queries