SCHEDULE OF RATES VOLUME -I [Incorporation of GST Act, 2017 & All addenda & Corrigenda of SOR, ] BUILDING WORKS [With effect from ] PUBLIC WORKS DEPARTMENT GOVERNMENT OF WEST BENGAL SCHEDULE OF RATES (Incorporation of GST Act, 2017 & all Addenda & Corrigenda of SOR, ) for BUILDING WORKS (VOLUME I) SANITARY & PLUMBING (VOLUME - II) ROAD & BRIDGE WORKS (VOLUME III) (including Materials, Labour & Carriage) Effective From PUBLIC WORKS DEPARTMENT GOVERNMENT OF WEST BENGAL X1 PREFACE In continuation of No. 332/SPW/2013 d a t e d of the Principal Secretary of PWD and subsequent U . O . No. 1143-ENC/13 d a t e & No. 1167-ENC/13 dated of the Engineer-in- Chief & Ex-officio Secretary of PWD, the Combined SCHEDULE of RATES in 3 (three) Volumes was published on Again, it was felt that a PWD Combined SCHEDULE of RATES need to be published after amalgamation of all addenda & corrigenda published till in order to avoid handling problem and reducing the probability of committing error during preparation of estimates, as well.

particular floor level means all work up to the roof of that floor. All works in basement shall be treated as work in first floor for payment. Renewal works include dismantling and taking out of old works with mending good damages after renewal and removal of waste materials. The rate for any item of original nature not provided in this

Tags:

  Basement

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of SCHEDULE OF RATES

1 SCHEDULE OF RATES VOLUME -I [Incorporation of GST Act, 2017 & All addenda & Corrigenda of SOR, ] BUILDING WORKS [With effect from ] PUBLIC WORKS DEPARTMENT GOVERNMENT OF WEST BENGAL SCHEDULE OF RATES (Incorporation of GST Act, 2017 & all Addenda & Corrigenda of SOR, ) for BUILDING WORKS (VOLUME I) SANITARY & PLUMBING (VOLUME - II) ROAD & BRIDGE WORKS (VOLUME III) (including Materials, Labour & Carriage) Effective From PUBLIC WORKS DEPARTMENT GOVERNMENT OF WEST BENGAL X1 PREFACE In continuation of No. 332/SPW/2013 d a t e d of the Principal Secretary of PWD and subsequent U . O . No. 1143-ENC/13 d a t e & No. 1167-ENC/13 dated of the Engineer-in- Chief & Ex-officio Secretary of PWD, the Combined SCHEDULE of RATES in 3 (three) Volumes was published on Again, it was felt that a PWD Combined SCHEDULE of RATES need to be published after amalgamation of all addenda & corrigenda published till in order to avoid handling problem and reducing the probability of committing error during preparation of estimates, as well.

2 So, the Combined S c h e d u l e of RATES was published on Now, after promulgation of GST from , it was felt to revise the RATES of all items considering only the basic price (i. e. exclusive of GST). GST is to be added later on. Sample Abstract sheet for preparing DPR given herein after (Annexure X ). For incorporation of GST Act, 2017, the Construction Labour Welfare Cess (1%) which was included within rate of item previously has been extracted from the entire items. In addition to above, all items in Chapter (U)-ADDITIONAL ITEMS, addenda & corrigenda published before publication of PWD SCHEDULE 2015, has been placed in other relevant existing chapters to facilitate users. This will take effect on & from All efforts have been taken for keeping this publication error free. However, effe ctiv e suggestion for any correction, addition & alteration is always welcome for any further betterment.

3 At last, we on behalf of the SCHEDULE committee would like to convey our sincere thanks to those Engineer Officers who have co-operated with suggestions and also expect fruitful comments & suggestions from all corners in future, as ever. (TAPASH KR. DEY) (BISWAJIT RAY) (DEBASHIS ROY) (SRIKUMAR BHATTACHARYA) Superintending Engineer Superintending Engineer Superintending Engineer Engineer-in-Chief Bridge Planning Circle Survey& Design Circle Planning & Monitoring Circle Public Works Department Member of the Combined SCHEDULE Committee PW Dte. &PW(Roads) Dte. Member of the Combined SCHEDULE Committee PW Dte. & PW (Roads) Dte. Convener of the Combined SCHEDULE Committee PW Dte. & PW (Roads) Dte. Chairman of the Combined SCHEDULE Committee PW Dte. & PW (Roads) Dte. X2 ANNEXURE X GENERAL ABSTRACT OF COST Project Title: CONSTRUCTION OF PROPOSED BUILDING Sl.

4 No. Description Amount (Rs) 1 Cost for Building Works X 2 Cost for Sanitary Works Y 3 Cost for Ancillary Work, if any Z 4 Sub-total Cost (1+2+3) A=(X+Y+Z) 5 GST, as applicable on Sl. 4 B 6 Cost of civil works excluding labour welfare cess (4+5) C=(A+B) 7 Labour welfare cess @1% on Sl. 6 D 8 Cost of civil works including labour welfare cess (6+7) E=(C+D) Note: Contingency Charge @ 3% is to be considered on Sl. No. 6. VOLUME - I for BUILDING WORKS 1. General Conditions----A1-A4 2. General Specifications(A) Material----B1-B6(B) Execution----B7-B37(C ) Mode of Measurements----B38-B43(D) ----B43-B44(E) Miscellaneous----B45-B47 3A . Quantity of Materials required for other than Design Mix Concrete items----B48-B59 3B. Quantity of Materials required for Design Mix Concrete items----B60-B62 4. List of frequently used 5. SECTION (I) : BUILDING WORKS(A)Earth Work, Antitermite Treatment----1-9(B)Dismantling, Cutting Chase, Holes (C)Brick Work, Concrete Work Brick works 14-23B.

5 Concrete Works23-44C. Repair and Rehabilitation works44-46(D) Flooring----47-77A. Original Works47-75B. Repair and Rehabilitation75-77(E) Roofing, Sheet Walling &Waterproofing----78-98A. Roofing & Sheetwalling78-89B. Waterproof Treatment89-92C. Repair and Rehabilitation for waterproofing92-93D. Repair and Rehabilitation93-98(F)Structural Steel Works, Grills, Gates Original Works99-110B. Repairing 110-113(G) Wood and PVC Works----114-182 CONTENTSA dditional Condition of Contract for Departmental MaterialsSUBJECTPAGECONTENTSSUBJECTPAGEA . Door Window Frame114-117B. Door Window Shutter117-135C. Miscellaneous Woodwork135-139D. Accessories139-147E. Repair Works147-156F. False Ceiling156-171G. Wall Panelling172-181H. Additional Rate181-182(H) Band Moulding, Cornice Original Works183-186B. Maintenance Works186-188(I)Plastering, Pointing Original Works189-192B. Miscellaneous Items192-193C. Additional Rate193(J) White Wash, Colour Wash, Distemper----194-199A.

6 Original Works194-198B. Miscellaneous Items198C. Additional Rate198-199(K) Painting, Varnishing Original Works200-203B. Miscellaneous Items203-204(L) Glazier's Work----205-207A. Original Works205-206B. Miscellaneous Items207C. Additional Rate207(M) Drain, Down Pipes, Chimney Pipes (N)Thatch, Mud and Bamboo Works----214-218A. Original Works214-216B. Maintenance Works216-218(O) Fencing----219-225A. Original Works219-223B. Maintenance Works223-225(P) Soling, Edging and Metalling----226-231(Q) Maintenance of Statues and Monuments (R) Aluminium Works----233-250(S) Well for Water Supply----251-258(T) Miscellaneous Works----259-279A. Special Works - (i) Horticulture259-263 (ii) Compound Development263-268 (iii) Event Management268-275B. Maintenance Works275-279(U) Additional Items----280-298 6. SECTION (II) : Materials and Labour(A)Materials Delivered and Stacked at site----299-302(B) Labour RATES per Diem----303 7.

7 ANNEXURE-ITable - : Issue rate of Cement & Steel Materials----304----305----306 8. ANNEXURE-II----307 9. TABLE : T-1----308-309 10. TABLE : T-2----310 11. TABLE : T-3----311 12. DRAWINGS----312-315 13. INDEX SHOWING CORRESPONDING ITEM NO. OF SOR, (Volume-I)----C1-C7 RATES for Pakur Variety Stone Aggregates At Different Railway YardsFORMAT - A : Format for Rate Analysis of Cement Concrete items Road Transportation & Carriage Works Rate for loading & unloading of Stone AggregateFORMAT - A : For Analysis of rate of items involving use of Cement supplied by ContractorFORMAT - B; For Analysis of rate of Reinforceing Steel supplied by ContractorA-1 G E N E R A L C O N D I T I O N The SCHEDULE of RATES (Volume I) is divided into two sections, Section -I for works, Section -II for materials & Labour and each section into sub-sections. In all cases of contracts in respect of Building Works, this entire volume of SCHEDULE will be operative.

8 Though this entire volume of SCHEDULE is divided for convenience into sections and sub-sections it is to be taken as a whole. An item under one section will apply equally to work falling under the category of another section unless a similar item appears in the later section. The same principle applies to items under different sub-sections. The Engineer-in-Charge shall mean the Executive Engineer of the Division concerned. The Sub-Divisional Officer concerned is authorized to carry out on behalf of the Engineer-in-Charge general supervision, day to day instructions with approval of materials and workmanship. In case of dispute, the decision of the Engineer-in-Charge shall be final and binding. Except when specifically mentioned in the description of the item itself, the rate for any item of work will apply equally to all floors, in any position and up to any height.

9 In respect of concrete work etc. where the rate is on the basis of volume, the item shall apply to all cases irrespective of the thickness unless a specific item appear in the SCHEDULE for the particular type of work. The work up to a particular floor level means all work up to the roof of that floor. All works in basement shall be treated as work in first floor for payment. Renewal works include dismantling and taking out of old works with mending good damages after renewal and removal of waste materials. The rate for any item of original nature not provided in this SCHEDULE may be deduced from the rate of similar item of renewal work by multiplying by a factor 100/105 and conversely the rate of any item of renewal nature not provided in this SCHEDULE may be deduced from the rate of similar item of original nature by multiplying by a factor 105/100.

10 White washing, painting etc. include preparation of surface (including plugging old nail holes etc.) prior to the treatment and removal of all marks or stains from walls, floor, glass, panes, chowkats etc. For repair works, this also includes shifting and/or covering furniture etc. All works shall be carried out with due regard to the convenience of the occupants, if any, and the arrangement and programme of work must be adjusted accordingly. In case of works within Jails, Hospitals etc. the Rules & Regulations of Authorities concerned must be strictly obeyed. The RATES given in the SCHEDULE are deemed to be inclusive of all such factors and contingencies. All materials, tools and plants are to be arranged for the work. All labours (Skilled & Unskilled) including their housing, sanitation, procurement of food stuff, medical aids etc.