Example: tourism industry

self build COST BREAKDOWN - pmhi.com

ESTIMATED CONSTRUCTION COST BREAKDOWN - Self build Borrower:_____. Location:_____. 1. Land - Acquisition Cost $_____ Building Costs PMHI PACKAGE COST: $_____. 2. Development Costs Demolition $_____. Site Improvements $_____ Foundation - basement/garage $_____. Total Development Costs $_____ Poured concrete $_____. Trench/backfill/waterproofing $_____. 3. Building Costs $_____. 0 Structural steel $_____. (see total of right column) Lumber (included in PMHI) $_____. Other Lumber (if applicable) $_____. 4. Soft Costs Rough framing - labor $_____. Interest (during construction) $_____ Trusses (included in PMHI) $_____. Legal Fees - Borrower's $_____ Trusses installation labor $_____. Architect/Engineering $_____ Roofing including labor $_____. Estimated Closing Costs $_____ Sheathing (including in PMHI) $_____. Brokerage Fees $_____ Gutters $_____. Total Soft Costs $_____. 0 Windows (included in PMHI) $_____. Exterior/painting/trim with labor $_____.

Title: Microsoft Word - self build COST BREAKDOWN.DOC Author: Andrea Fellersen Created Date: 2/28/2013 11:56:07 AM

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of self build COST BREAKDOWN - pmhi.com

1 ESTIMATED CONSTRUCTION COST BREAKDOWN - Self build Borrower:_____. Location:_____. 1. Land - Acquisition Cost $_____ Building Costs PMHI PACKAGE COST: $_____. 2. Development Costs Demolition $_____. Site Improvements $_____ Foundation - basement/garage $_____. Total Development Costs $_____ Poured concrete $_____. Trench/backfill/waterproofing $_____. 3. Building Costs $_____. 0 Structural steel $_____. (see total of right column) Lumber (included in PMHI) $_____. Other Lumber (if applicable) $_____. 4. Soft Costs Rough framing - labor $_____. Interest (during construction) $_____ Trusses (included in PMHI) $_____. Legal Fees - Borrower's $_____ Trusses installation labor $_____. Architect/Engineering $_____ Roofing including labor $_____. Estimated Closing Costs $_____ Sheathing (including in PMHI) $_____. Brokerage Fees $_____ Gutters $_____. Total Soft Costs $_____. 0 Windows (included in PMHI) $_____. Exterior/painting/trim with labor $_____.

2 Doors- interior/exterior $_____. TOTAL ESTIMATED COST $_____. 0 Exterior doors (included in PMHI) $_____. Less Deposit Paid to Builder $_____ Rough heating $_____. Less Deposit on Land $_____ Rough plumbing $_____. Less Cash Payments Made to Date: $_____ Rough electric $_____. _____ Fireplace(s) $_____. Insulation $_____. Furnace/AC Unit $_____. Drywall $_____. Net Amount Required to build $_____. Finish carpentry/trim $_____. Loan Amount Requested $_____ Acoustical $_____. Wood flooring $_____. Cash Balance Required to Complete $_____. 0. Tile flooring $_____. Linoleum/carpet flooring $_____. Source of cash balance required: _____ Interior Painting $_____. _____ Cabinets - kitchen/bathrooms $_____. Finish tile work $_____. _____ Marble Tile $_____. Countertops $_____. Appliances $_____. Plumbing Fixtures $_____. _____ Showers/tubs $_____. Borrower Signature Date Electrical fixtures $_____. Elevator $_____. _____ Propane/oil tank $_____.

3 Borrower Signature Date Fire/security system $_____. Exterior porches/patios/decks $_____. Electric/water/sewer lines $_____. Septic system $_____. Well $_____. 2001 Lending/Forms&DisclosuresCabinet/costbre akdowns Blacktop/sidewalks $_____. Final grading/seeding/landscaping $_____. Other:_____ $_____. Contingencies $_____. Total Building Costs $_____. 0.


Related search queries