Section 1: Identification - hanford.gov

DOCUMENT RELEASE AND CHANGE FORM Prepared For the Department of Energy, Assistant Secretary for Environmental Management By Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352 Contractor For Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800 1a. Doc No: RPP-RPT-58733 Rev. 00 1b. Project Number: T2R02 N/A 1 SPF-001 ( ) TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America.

1 SPF-001 (Rev.0) TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States

Tags:

  Identification, Section, Section 1

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Section 1: Identification - hanford.gov

1 DOCUMENT RELEASE AND CHANGE FORM Prepared For the Department of Energy, Assistant Secretary for Environmental Management By Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352 Contractor For Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800 1a. Doc No: RPP-RPT-58733 Rev. 00 1b. Project Number: T2R02 N/A 1 SPF-001 ( ) TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America.

2 Release Stamp 2. Document Title Slurry Pump Reliability/Availability/Maintainability (RAM) Analysis 3. Design Verification Required Yes No 4. USQ Number N/A 5. PrHA Number N/A Rev. 6. USQ Screening: a. Does the change introduce any new failure modes to the equipment? Yes No Basis is required for Yes: b. Does the change increase the probability of existing failure modes? Yes No Basis is required for Yes: c. For Safety Significant equipment, does the change require a modification to Chapter 4 of the DSA and/or FRED? Yes No N/A Basis is required for Yes: 7. Description of Change and Justification (Use Continuation pages as needed) Original issue for release.

3 Because of the relatively simple nature of the change and the general service status of the equipment, a graded approach was applied and design verification was not performed as allowed by ARES quality assurance procedure , Design Verification. 8. Approvals Title Name Signature Date Clearance Review BRATTON, GAYLA E BRATTON, GAYLA E 10/06/2015 Design Authority BELLOMY, JIM BELLOMY, JIM 10/01/2015 Document Control Approval HONEYCUTT, COLLEEN HONEYCUTT, COLLEEN 10/06/2015 Originator FELDMANN, MONIKA J FELDMANN, MONIKA J 09/22/2015 Other Approver HAGENSEN, ALAN R HAGENSEN, ALAN R 09/21/2015 Other Approver WHITE, MICHAEL A WHITE, MICHAEL A 09/29/2015 Other Approver WITHERSPOON, JP P WITHERSPOON, JP P 10/01/2015 Other Approver BRYDEN, MICHAEL J BRYDEN, MICHAEL J 10/01/2015 Other Approver QUAM, PAUL R QUAM, PAUL R 09/21/2015 Responsible Engineer BELLOMY, JIM BELLOMY, JIM 10/01/2015 Please see continuation sheet 9.

4 Clearance Review: Restriction Type: Public Undefined Unclassified Controlled Nuclear Information (UCNI) Export Control Information (ECI) Official Use Only Exemption 2-Circumvention of Statute (OUO-2) Official Use Only Exemption 3-Statutory Exemption (OUO-3) Official Use Only Exemption 4-Commercial/Proprietary (OUO-4) Official Use Only Exemption 5-Privileged Information (OUO-5) Official Use Only Exemption 6-Personal Privacy (OUO-6) Official Use Only Exemption 7-Law Enforcement (OUO-7) RPP-RPT-58733 - 9:55 AM1 of 35 Oct 06, 2015 DATE:DOCUMENT RELEASE AND CHANGE FORM Doc No: RPP-RPT-58733 Rev. 00 2 SPF-001 ( ) 10. Distribution: Name Organization ANDROS, BENJAMIN E BAUER, ROGER E A/AX RETRIEVAL ENGRNG BELLOMY, JIM A/AX RETRIEVAL ENGRNG BRYDEN, MICHAEL J SLUICE-BASED RETRIEVAL ENGRNG HULL, KEVIN J ELECTRICAL ENGINEERING PARKMAN, DAVID B MARS-BASED RETRIEVAL ENGRNG SNYDER, JOSHUA J WITHERSPOON, JP P A/AX RETRIEVAL ENGRNG 11.

5 TBDs or Holds N/A 12. Impacted Documents Engineering N/A Document Number Rev. Title 13. Other Related Documents N/A Document Number Rev. Title RPP-RPT-58298 00 LEAN Improvement Project Business Case to Benchmark Retrieval Technologies RPP-SPEC-57481 00 Level 2 Specification for AX Farm Retrieval RPP-SPEC-60187 00 Procurement Specification for Submersible Slurry Pump for 241-A/AX Tank Farm Retrieval Project VI-11-000017 00 AGI MODIFIED SLURRY PUMP 14. Related Systems, Structures, and Components: 14a. Related Building/Facilities N/A 241-A 241-AX 14b.

6 Related Systems N/A 241-WT 14c. Related Equipment ID Nos. (EIN) N/A RPP-RPT-58733 - 9:55 AM2 of 35 3 SPF-001 ( ) DOCUMENT RELEASE AND CHANGE FORM CONTINUATION SHEET Document No: RPP-RPT-58733 Rev. 00 8. Approvals Title Name Signature Date Responsible Manager BAUER, ROGER E BAUER, ROGER E 10/01/2015 This page intentionally left blank. RPP-RPT-58733 - 9:55 AM3 of 35A-6002-767 (REV 3) RPP-RPT-58733, Rev. 0 Slurry Pump Reliability/Availability/Maintainability (RAM) Analysis BD Groth Prepared by ARES Corporation for Washington River Protection Solutions, LLC Richland, WA 99352 Department of Energy Contract DE-AC27-08RV14800 EDT/ECN: DRCF UC: Cost Center: Charge Code: B&R Code: Total Pages: 35 Key Words: Sluicing, Hydraulic, Slurry Pump Reliability Analysis, 241-A Tank Farm, 241-AX Tank Farm Abstract.

7 A reliability analysis has been conducted on the A/AX Slurry Pump system that will be used to retrieve waste from the 241-A/AX Tank Farms at the Hanford Site to determine if the system design provides a reasonable probability of meeting its retrieval mission goals and if some general reliability and availability improvements can be made to the system. TRADEMARK DISCLAIMER. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. Release Approval Date Release Stamp Approved For Public Release RPP-RPT-58733 - 9:55 AM4 of 35By GE Bratton at 10:01 am, Oct 06, 2015 Oct 06, 2015 DATE:RPP-RPT-58733, Rev.

8 0 i SLURRY PUMP RELIABILITY/AVAILABILITY/MAINTAINABILITY (RAM) ANALYSIS September 2015 prepared by ARES Corporation Energy Services Division 1100 Jadwin Avenue, Suite 400 Richland, Washington 99352 (509) 946-3300 prepared for Washington River Protection Solutions, LLC RPP-RPT-58733 - 9:55 AM5 of 35 RPP-RPT-58733, Rev. 0 ii EXECUTIVE SUMMARY A reliability analysis has been conducted on the Slurry Pump system that will service the 241-A/AX Tank Farms at the Hanford Site. The Slurry Pump system is a generally standard design that will be used to retrieve other tanks as well, so recommendations made from this analysis will be useful for future like systems used for tank retrieval. This analysis was performed to determine if the current system design provides a reasonable probability that the Slurry Pump system availability and reliability are adequate to meet tank retrieval goals, and whether some cost effective equipment modifications and/or operating improvements could be made to improve the Slurry Pump system availability and reliability.

9 A system model of the Slurry Pump system was developed in BlockSim 1 using a reliability block diagram method. Using failure rate data for specific components and parts, the reliability of the system was determined over the anticipated mission time. The mean time to repair for each of the components was then estimated in a very conservative manner to determine a baseline availability. The analysis was then run again with reductions made in the mean times to repair to demonstrate how much system availability could improve by improving the mean time to repair by such methods as pre-planning replacement work, utilizing condition-based monitoring to detect impending component failures, providing for just-in-time procurement or spare parts storage, and other improvements in the general maintenance strategy and approach.

10 No reliability goals have been imposed on the Slurry Pump system by Washington River Protection Solutions, LLC; therefore, the only criterion for the design of this system to meet is that it has a reasonable probability of completing the retrieval mission. The analysis was conducted for a mission duration of 2 years. It has been estimated in a previous study that the actual operating time of the equipment will only be 4,066 hours over this time period. However, the 2-year mission time was used in the analysis as most of the failures will be either early or random failures as opposed to wear-out failures over this time period. From a system perspective, the Slurry Pump system is very similar to the Extended Reach Sluicing System Hydraulic Subsystem that was analyzed in RPP-RPT-58732.