Example: bankruptcy

Section 3010 - Trench Excavation and Backfill

c. Frozen materials. d. Stumps, logs, branches, and brush. e. Trash, metal, or construction waste. f. Soil in clumps or clods larger than 6 inches, and without sufficient fine materials to fill voids during placement. g. Environmentally contaminated soils. h. Materials removed as rock excavation or over-excavation. 3. Topsoil: Class V material ...

Tags:

  Material, Fill, Backfill

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Section 3010 - Trench Excavation and Backfill

Related search queries