Example: air traffic controller

SMART ASH MODEL 100 - SEAPRO - Home

4/99 , SMART ASH MODEL 100 ASSEMBLY .AND OPERATING INSTRUCTIONS IMPORTANT: Read and understand operating instructions before using this unit. WARNING: NOT FOR USE WITH MATERIALS CONTAINING LIQUIDS SUCH AS GASOLINE OR PAINT THINNERS. ALL MATERIALS MUSr HAVE A FLASH POINT HIGHER THAN 100 DEGREES FAHRENHEIT. IMPORTANT SAFETY INSTRUCTIONS BEFORE USING YOUR REFUSE COMBUSTION SYSTEM, BASIC SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK AND INJURY TO PERSONS, INCLUDING THE FOLLOWING: 1. Read and understand all instructions. 2. Follow all warnings and Instructions marked on the product. 3. Care should be taken to ensure this product is disconnected from the power source when there is a chance water may come in contact with the electrical connections. 4. Operator must ensure that the combustion system Is on stable ground and in no danger of failing or tipping. 5. The combustion system must stand free and clear of surrounding build-Ings, vegetation or other combustible material, and care should be taken that there are no flammable items above the emission screen.

important safety instructions before using your refuse combustion system, basic safety precautions should always be followed to reduce the risk of fire, electric shock

Tags:

  Shocks

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of SMART ASH MODEL 100 - SEAPRO - Home

1 4/99 , SMART ASH MODEL 100 ASSEMBLY .AND OPERATING INSTRUCTIONS IMPORTANT: Read and understand operating instructions before using this unit. WARNING: NOT FOR USE WITH MATERIALS CONTAINING LIQUIDS SUCH AS GASOLINE OR PAINT THINNERS. ALL MATERIALS MUSr HAVE A FLASH POINT HIGHER THAN 100 DEGREES FAHRENHEIT. IMPORTANT SAFETY INSTRUCTIONS BEFORE USING YOUR REFUSE COMBUSTION SYSTEM, BASIC SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK AND INJURY TO PERSONS, INCLUDING THE FOLLOWING: 1. Read and understand all instructions. 2. Follow all warnings and Instructions marked on the product. 3. Care should be taken to ensure this product is disconnected from the power source when there is a chance water may come in contact with the electrical connections. 4. Operator must ensure that the combustion system Is on stable ground and in no danger of failing or tipping. 5. The combustion system must stand free and clear of surrounding build-Ings, vegetation or other combustible material, and care should be taken that there are no flammable items above the emission screen.

2 6. Never touch the combustion chamber (steel drum), or lid while Inciner-ating refuse. 7. Refer servicing to qualified personnel under the following conditions: a. When the power supply cord is frayed or damaged. b. If liquid has been in contact with the electrical system. c. If the product has been damaged and exhibits a distinct change in per-formance. 8. Do not operate this product in the vicinity of flammable gases. 9. Aerosol or other pressurized cans cannot be Incinerated in this system. 10. If operator is unsure if certain items can be safely incinerated in this system, consult the manufacturer for details and instructions. Elastec Inc. 618-382-2525 Elastec Inc., 121 Council St., Carmi, IL 62821 USA,618-382-2525 2 Assembly Instructions 1. Mount wheels & push nuts onto axle. Push Nut 2. Use hammer to drive on push nuts. 3. Slide side rails into cart base, make sure chain hooks are on the outside. 4. Insert U-bolt through frame, use axle spacer between axle and cart frame.

3 Make sure U-bolts are mounted in axle groove. Install and tighten 1/4" nuts. 5. Install fenders to cart with 1 1/2" screws & nuts. 6. Insert cart handle in side rails. Use 1 1 /2" screws, nuts 'and tighten. ""-9 Axle .. II " .. Cart Handle Nut _, -=11--1 1/2 Screw Chain hook to outside. -SldeRali 1 1/2 Screw Nut Fender _ / 1 1/4 U-Bolt o -----------\ cart Base ..___= CJ @ \ 3 Axel Spacer II=-r~ IE -7. Install 1/4" bolts into bottom side ralls. 8. Place plenum between rails, resting on bottom bolts. 9. Install top 1/4" bolts. 1 O. Tighten all bolts and nuts. ~--------------------------------i-J .. I L I-I :\6 I I I I I I I I I . I I@ I I -CQ[J I ./ I I Plenum I I I I I I I I I "" I I I I I I I I I I I I .1 I I ~-----------------~ j" c '-'-1/4' b olt -' -=Il 1 /4' b olt ---f---4 11. Assemble Stir Rod. Insert upset ends over straight ends & push together. CAUTION: STIR ROD IS SPECIALLY DESIGNED TO PREVENT FLAME FROM TRAVELLING THRU ROD DURING STIRRING.]

4 DO NOT USE ANYTHING OTHER THAN THIS ROD TO STIR CONTENTS OF BURNER DURING BURNING PROCEDURE. 12. Mount bottom shield on cart, slide over bottom of plenum and behind axle. Then fasten with 1/2' bolt, nut and clamp (see blow up below). 13. Set OPEN HEAD DRUM on cart. 14. Fasten with chain. 15. Set drum lid on drum. 16. Thread hose onto threaded hose connector, then tighten clamp to secure hose. Drum Lid r-==========~~/ 55 Gal/an Open Head Drum (Nat Included) Snap Button Flex Hose 17. Insert flex hose with snap button lo-c::r-c:r-CI--'O-c::r-c:r-CI--' trl E~~:::"" Hose Clamp Into 2" Inlet on drum lid. 18. Install plug in cord lock. Assembly Is finished see operating Instructions. Axle Saf-Start (cord LOCk' \ Bottom Shield _Bottom Shield ~~-___ 1/2' Screw J Clamp 5 SlT1art Ash MODEL 1 00 Parts 110 & 220 Volt Units 4 3 23a 2 23 36_[-___ _ 22 13 34 25 19 28 29 REF# PART# OTY. DESCRIPTION 108001 DRUM LID ASSEMBLY 2 108015 TOP BAND SIS 3 108016 SCREEN SPACER 4 108017 SPARK SCREEN 5 108026 4 LID CLAMP ASSEMBLY 6 108030 1 SPARK DEFLECTOR ASSEMBLY 7 108040 STIR PORT COVER 8a 108049 PLENUM BOX ASSEMBLY 110V 8b 108048 PLENUM BOX ASSEMBLY 220 V 9a 108059 1 (KIT) REPLACEMENT MOTORS 110 V 9b 10B05B 1 (KIT) REPLACEMENT MOTORS 220 V 10a 108070 1 TOGGLE SWITCH 11 0 V 10b 10B05B 1 TOGGLE SWITCH 220 V 11 10B066 1 TOGGLE SWITCH 800T 12 108098 1 AIR SHUTTER CONTROL 13 108085 2 FILTER HOLDER 14 108086 2 FILTER 15 108087 2 FILTER KEEPER 16 10a088 1 8 LOWER COVER 17 108120 1 CART HANDLE 1B 108122 2 CART SIDE RAIL 19 108121 CART 8 ASE 20a 108076 1 SAFE START PLUG 110 V 20b 108077 1 SAFE START PLUG 220 V 6 REF# 21 22 23 23a 24 25 26 27 28 29 30 31 32 33 34 35 36 37a 37b 38 39 17 \ <.)]

5 =======0 7 27 32 10-94 PART# OTY. DESCRIPTION 108105 AIR PORT COVER 108107 HOSE CLAMP 108115 FLEX HOSE-STAINLESS STEEL 108116 SNAP BUTTON KIT 108130 DOUBLE LOOP CHAIN 108079 CORD LOCK 108131 2 FENDER 108132 1 AXLE 108133 2 AXLE SPACER 108134 2 AXLE U-BOLT 108135 2 CARTWHEEL 108136 2 AXLE pUSH NUT 108137 1 AXLE CLAMP 108138 1 BOnOMGUARD 108149 1 GRATE COMPLETE (OPTIONAL) 108045 Not Shown STIR ASSEMBLY 108140 OPEN HEAD DRUM 108175 Not Shown SPARE PARTS KIT 110 V 1 YEAR OPERATION 108176 NolShown SPARE PARTS KIT 220 V 1 YEAR OPERATION 108176 THRD AIR PORT 2 1f4" 108176 THRD AIR PORT 11f4" 0: dclsmartamvpllrlnllW Elastec~ Inc. Choosing the correct power supply outlet First determine electrical power required for your particular unit, 120 volts or 240 volts. Afteryou have determined the power supply required, you will need to choose the correct electrical outlet for the unit. In choosing an outlet, a circuit with a 20 amp breaker or greater Is best suited for the unit.

6 When possible the SMART Ash unit must be the only appliance on the circuit, due to the high amperage draw. 120 volt units will draw 14 amps when running and nearly 30 amps at start-up. 240 volt units levels will be about half of that of the 120 volt units. Saf-Start mechanisms are Installed on SMART Ash units to guard against Improper start of the unit after a power Interruption has occurred. The Saf-Start Is a very sensitive electrical control device. When there Isa power Interruption or fluctuations In the power supply that are below recommended levels, the unit will disengage. Fluctuations for only a spilt second below recom-mended levels will cause the Saf-Start to disengage. What happens when the unit power supply switch Is turned on and the Saf-Start disengages but does not cause the circuit breaker to disengage? This is caused when the voltage drops below recommended levels for a spilt second, because of the high amperage draw made by the unit at start-up.

7 Unplugging of one or more appliances on the circuit if possible may solve this problem, If not, use another outlet on a different circuit If possible. If you have recurring problems of this nature an electrician to check line voltage drops at start-up, and amperage draw when the unit Is running, to Isolate the problem. 7 SMART ASH OPERATING INSTRUCTIONS SELECTING A DRUM Use standard OPEN HEAD 55 GALLON DRUM In good condition with undamaged lip. Lid will not fit a "de-headed" 011 or chemical drum. Do not pierce holes in drum. Even if drum Is standard, lid still may not fit because drum is out of round. Check drum and correct as follows: 1. Measure across top of drum in several directions. If there is a differ-ence of more than 1/4" in measurements, drum is egg-shaped and needs to be trued up. 2. To true up, place drum on Its side with "long" measurement vertical. Lean on rim and use body weight to depress rim. 3. Re-measure drum and repeat process until correction is made.

8 Paint on ordinary drum will smoke and possibly burn when drum is first used. Paint will flake off, leaving drum without rust protection. It should always be stored Indoors in clean dry place. Properly cared for, drum will have satisfactory service life. GETTING ACQUAINTED WITH SMART ASH study the SMART Ash parts list and Ipentify the major parts which will be referred to in these instructions. Two blowers behind the motor cover draw air Into the plenum. The air feeds to the drum through the air hose and lid .. The lid has two elements to block emissions of burning material; the spark screen on top, and an Internal spark deflector which can be seen beneath the exhaust vent in lid. Four clamps hold the lid in place during burning. Another moveable part on the lid is a porthole cover, which pivots off the porthole to permit observation of the fire and stirring or stoking with the stir rod supplied. It is moved easily from closed to open by rapping its side with the factory supplied stir rod.

9 Attached to the plenum is a lever which controls airflow to the burn chamber. Air reaching the burn chamber is regulated by this control latch which controls the blowers output. 8 Variation in air flow can be felt by holding your hand near the exhaust vent while changing throttle position. Before the first SMART Ash burn, the operator should practice mounting lid on drum and securing it with clamps. The manufacturer highly recommends the operator to walk through the Ignition procedure a few times prior to the first burn to fully acquaint him with the system operation. The SmartAsh is equipped with a Saf-Start Unit. This safety precaution prevents the SMART Ash from restarting automatically after a power interruption, even if the equipment switch Is left in the "on" position. Such a restart could cause damage to eqUipment and Injury to persons. Note: The Saf-Start unit button must be reset every time the unit is plugged In. As with the beginning of a burn.

10 SMART ASH OPERATION Required accessories: three-wire outdoor electric extension cord, safety glasses, high temperature gloves (ie. welding gloves) lighter and several sections of newspaper or cardboard. Cord wire should be no lighter than 18 GA. under 25 ft. or 16 GA. under 50 ft. PREPARING TO BURN 1. Select a site removed from buildings, hedges and trees. Place SMART Ash on bareground, gravel, or concrete. Do not burn on new blacktop, lawn or ground with dry vegetation. 2. Position SMART Ash so cart and air supply (and operator) are upwind and drum downwind. Place lid on ground. 3. Connect SMART Ash plug to extension cord and cord to grounded electrical outlet. Depress the reset button on Saf-Start plug. To prevent accidental interruption of burning install cord lock and arrange slack in cord beneath plug in. NOTE: If there is a power in)erruption during the operation of your SMART Ash Unit follow the steps below for restart. A.


Related search queries