Example: quiz answers

TM 10-8340-225-10 TECHNICAL MANUAL OPERATOR'S …

TM 10-8340-225-10 TECHNICAL MANUALOPERATOR'S MANUALSTANDARDIZED INTEGRATEDCOMMAND POST SYSTEMTENT COMMAND POSTA pproved for public is copy is a reprint which includescurrent pages from Changes 1 and , DEPARTMENT OF THE ARMY11 JULY 1988 INTRODUCTION1-1 OPERATINGINSTRUCTIONS2-1 OPERATOR SMAINTENANCEINSTRUCTIONS3-1 REFERENCESA-1 COMPONENTS OF ENDITEM LIST AND BASICISSUE ITEMS LISTB-1 ADDITIONALAUTHORIZATION LISTC-1 EXPENDABLE/DURABLESUPPLIES ANDMATERIALS LISTD-1TM 10- 8340 -225-10C 1 CHANGE HEADQUARTERSDEPARTMENT OF THE ARMYNO. 1 WASHINGTON, , 29 January 1990 OPERATOR'S ManualSTANDARDIZED INTEGRATEDCOMMAND POST SYSTEMTENT COMMAND POSTA pproved for public release; distribution is unlimitedTM 10-8340-225-10 , 11 July 1988, is changed as follows:1.

TM 10-8340-225-10 1-1. SCOPE. a. Type of Manual.Operator's Manual which provides instructions for the erection, striking and repair procedures for the Tent, Command Post, used with the Standardized Integrated Command Post System (SICPS).

Tags:

  Manual, Technical, 8340, Tm 10 8340 225 10 technical manual, Tm 10 8340 225 10 1

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of TM 10-8340-225-10 TECHNICAL MANUAL OPERATOR'S …

1 TM 10-8340-225-10 TECHNICAL MANUALOPERATOR'S MANUALSTANDARDIZED INTEGRATEDCOMMAND POST SYSTEMTENT COMMAND POSTA pproved for public is copy is a reprint which includescurrent pages from Changes 1 and , DEPARTMENT OF THE ARMY11 JULY 1988 INTRODUCTION1-1 OPERATINGINSTRUCTIONS2-1 OPERATOR SMAINTENANCEINSTRUCTIONS3-1 REFERENCESA-1 COMPONENTS OF ENDITEM LIST AND BASICISSUE ITEMS LISTB-1 ADDITIONALAUTHORIZATION LISTC-1 EXPENDABLE/DURABLESUPPLIES ANDMATERIALS LISTD-1TM 10- 8340 -225-10C 1 CHANGE HEADQUARTERSDEPARTMENT OF THE ARMYNO. 1 WASHINGTON, , 29 January 1990 OPERATOR'S ManualSTANDARDIZED INTEGRATEDCOMMAND POST SYSTEMTENT COMMAND POSTA pproved for public release; distribution is unlimitedTM 10-8340-225-10 , 11 July 1988, is changed as follows:1.

2 Remove and insert pages as indicated below. New or changed text material is indicated by a vertical bar in themargin. An illustration change is indicated by a miniature pointing pages Insert pages1-1 through 1-4 1-1 through 1-42-9 and 2-10 2-9 and 2-102-13 through 2-16 2-13 through 2-16A-1/A-2 A-1/A-2B-1 and B-2 B-1 and B-2B-5 and B-6 B-5 and B-6C-1/C-2 C-1/C-22. Retain this sheet in front of MANUAL for reference Order of the Secretary of the Army:CARL E.

3 VUONOG eneral United States ArmyChief of StaffOfficial:WILLIAM J. MEEHAN, IIBrigadier General, United States ArmyThe Adjutant GeneralDISTRIBUTION:To be distributed in accordance with DA Form 12-25A, Operator Maintenance requirements for Tent, Extendable,Modular (TEMPER).}TM 10-8340-225-10 WARNINGDO NOT work with cables or fixtures unless the electrical power isdisconnected from the power source. Possible fire or electrical hazard topersonnel may ALL flammable objects away from tent. Fire damage may SURE when tent is closed that all engine exhaust is vented to theoutside. Carbon monoxide poisoning may (b blank)TM 10-8340-225-10 HEADQUARTERSTECHNICAL MANUALDEPARTMENT OF THE ARMYTM 10-8340-225-10 WASHINGTON, , 11 July 1988 OPERATOR'S ManualSTANDARDIZED INTEGRATED COMMAND POST SYSTEMA pproved for public release.

4 Distribution is ERRORS AND RECOMMENDING IMPROVEMENTSYou can help improve this MANUAL . If you find any mistakes or if you know of a way to improve the procedures, please letus know. Mail your letter, DA Form 2028 (Recommended Changes to Publications and Blank Forms), or DA Form 2028-2(located in the back of this MANUAL ) direct to: Commander, Army Troop Support Command, ATTN: AMSTR-MCTS,4300 Goodfellow Blvd. St. Louis, MO 63120-1798. A reply will be furnished to OF CONTENTSPageCHAPTER ..1-1 Section IGeneral ..1-1 Section IIEquipment Description ..1-2 Section IIIT echnical Principles of ..1-9 CHAPTER ..2-1 Section IDescription and Use of OPERATOR'S Controlsand ..2-1 Section IIPreventive Maintenance Checks andServices (PMCS)..2-2 Section IIIO peration Under Usual.

5 2-9 Section IVOperation Under Unusual ..2-32 CHAPTER ..3-1 INTRODUCTIONOPERATING INSTRUCTIONSOPERATOR'S MAINTENANCE INSTRUCTIONSiTM 10-8340-225-10 TABLE OF CONTENTS (Continued)PageSection IOperator's Lubrication Instructions ..3-1 Section IIOperator's Troubleshooting Procedures ..3-1 Section IIIO perator's Maintenance Procedures ..3-2 APPENDIX OF Command Post Extension Tent ..1-11-2 ICP Extension Tent (External View)..1-41-4 ICP Frame Overview ..1-51-5 Light Set ..1-61-6 Map Board .. OF END ITEMS AND BASICISSUE ITEMS LISTADDITIONAL AUTHORIZATIONEXPENDABLE/DURABLESUPPLIES AND MATERIAL LISTGLOSSARYALPHABETICAL INDEXTM 10-8340-225-10 CHAPTER 1 INTRODUCTIONS ection I. GENERAL INFORMATIONF igure 1-1. Integrated Command Post Extension TentFigure 1-2.

6 ICP FrameChange 11-1TM of MANUAL . OPERATOR'S MANUAL which provides instructions for the erection, striking and repair proceduresfor the Tent, Command Post, used with the Standardized Integrated Command Post System (SICPS). Number and Equipment Name. No model number has been assigned at this time for the StandardizedIntegrated Command Post of Equipment. To provide shelter to support commanders; to control communications and intelligenceoperations at all Feature. Tent frame is a single piece collapsible FORMS AND RECORDS. Department of the Army forms and procedures used for equipmentmaintenance will be those prescribed by DA PAM 738-750, The Army Maintenance Management System (TAMMS). EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR).

7 If your tent needs improvement, let usknow. Send us an EIR. You, the user, are the only one who can tell us what you don't like about your equipment. Let usknow why you don't like the design or performance. Put it on an SF 368 (Quality Deficiency Report). Mail it to us at:Commander, Army Troop Support Command, ATTN: AMSTR-QX, 4300 Goodfellow Blvd., St. Louis, MO OF meterparaparagraphsq ftsquare feetSection II. EQUIPMENT , CHARACTERISTICS, CAPABILITIES AND To provide shelter to support command, control, communication and intelligence (C3I) operations atall and Features.(1)May be utilized as a stand alone structure or in conjunction with tactical vehicles.(2)Highly Mobile.(3)Quickly 10- 8340 -225-101-5. EQUIPMENT, CHARACTERISTICS, CAPABILITIES AND FEATURES-CONT.

8 (4)Capable of interconnecting to form larger work space areas.(5)Capable of interconnecting end to end, side to side and side to end in any configurationdesigned.(6)Tent sidewalls are interchangeable and can be installed in any configuration.(7)Two soldiers can set up and disassemble the tent to include load and unloading of allcomponents of the system.(8)The frame is a single piece collapsible component constructed of light weight tubularaluminum supports which fold and extend telescopically.(9)Walls are joined together using hook and pile velcro and buckles.(10)Tent is made of water resistant, mildew resistant, polyester duck fabric.(11)Tent frame can be adjusted to compensate for the slope of the 10- 8340 -225-101-6.

9 LOCATION AND DESCRIPTION OF MAJOR external view of the major tent fabric components is shown in Figure 1-3. ICP Extension Tent (External View)Roof Cap. Provides shelter from environment and contains two roofvents for ventilation purposes. Composed of vinylcoated polyester fabric and an inner vinyl coated nylon fabric. Anidentification label is located on the inside. One isprovided with each Wall. Constructed from polyester duck in the color of camouflagegreen, army shade #483. 'An identification label issewn on the inside of each. There are two provided with each Wall. Contains a 2' 3 1/2" x 3' 4" window. Constructed ofpolyester duck in the color of camouflage green, army shade #483. Anidentification label is sewn on the inside of each.

10 One is provided witheach Way Wall/Vestibule. Covered entrance way allows forentry/exit into the tent. Enhances ventilation and providesblack out protection. Constructed of polyester duck in the color ofcamouflage green, army shade #483. An identification label is sewn onthe inside. One is provided with each 11-4TM 10- 8340 -225-101-6. LOCATION AND DESCRIPTION OF MAJOR major tent frame components are identified in Figure 1-4. ICP Frame OverviewLocking Pin. Allows extension to the full width and height of the Collar. Maintains the expanded frame in place at the Allows extension of the legs and maintains legs in thecontracted Member. Supplies support to the roof Member.


Related search queries