(VOL. 2)2016 GOVERNMENT OF INDIAP rice : Rs. 3000/- (for both volumes) excluding postage and forwarding charges etc. All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced in any form or byany means, electronic or mechanical including photocopy, recording or any information storage and retrieval system,without permission, in writing, from the Director General, CPWD, New Delhi Analysis of Rates is indicative, as coefficients for labour are likely to vary due to technological innovations,skill of workman and other local factors affecting the efficiency and output of labour. Further its use by , PSUs, private bodies & individuals shall be at their own discretion. CPWD shall not be responsible forany ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of DelhiAnalysis of Rates by such bodies or feed back and suggestions, please contact SE(TAS),CPWD, Room No.

08 Marble & Granite Work 09 Wood and PVC Work 10 Steel Work 11 Flooring 12 Roofing Two 13 Finishing 14 Repairs to Buildings 15 Dismantling and Demolishing 16 Road Work 17 Sanitary Installations 18 Water Supply 19 Drainage 20 Pile work 21 Aluminium Work 22 Water Proofing 23 Rain Water Harvesting & Tubewells 24 Conservation of Heritage Buildings.

Tags:

  Flooring, Integra

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of (VOL. 2)

1 (VOL. 2)2016 GOVERNMENT OF INDIAP rice : Rs. 3000/- (for both volumes) excluding postage and forwarding charges etc. All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced in any form or byany means, electronic or mechanical including photocopy, recording or any information storage and retrieval system,without permission, in writing, from the Director General, CPWD, New Delhi Analysis of Rates is indicative, as coefficients for labour are likely to vary due to technological innovations,skill of workman and other local factors affecting the efficiency and output of labour. Further its use by , PSUs, private bodies & individuals shall be at their own discretion. CPWD shall not be responsible forany ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of DelhiAnalysis of Rates by such bodies or feed back and suggestions, please contact SE(TAS),CPWD, Room No.

2 418, ''A'' Wing, Nirman Bhawan, No. : available atAll Leading Booksellers & Authorised Govt. Dealers In IndiaBooks will be delivered next day by COURIER(Payment to courier-boy)in Delhi, Noida, Ghaziabad, Faridabad & Gurgaon (nominal courier charges extra)JAIN BOOK AGENCY (SOUTHEND)1, Aurobindo Place Market,Hauz Khas, New Delhi-110016 Phone : 41755666E-mail : : JAIN BOOK AGENCY (GURGAON)19, Central Plaza Mall, Sector 53,Golf Course Road,Gurgaon 122002 HaryanaPhone : 4143020 Mobile : 9810666810 JAIN BOOK AGENCY (INTERNATIONAL)RA- 11, Sector- 126,Opp. Gate No. 2A of Amity University,NoidaMobile. : 9210080580 JAIN BOOK AGENCY (GREATER NOIDA)11 Jagat farm ComplexGama Sector MarketNear OBC BankGreater NoidaPhone : 0120-4206655A GOVERNMENT OF INDIA PUBLICATIONP ublished byDIRECTOR GENERALCPWD, Nirman Bhawan, New Delhi - 110011&Printed & Marketed byJAIN BOOK AGENCYA uthorised Dealers of Govt. PublicationsC-9, Connaught Place, New Delhi-110001 Phones : 44556677, 23416390 upto 94E-mail : : : 978-81-932679-1-2 DIAL-A-BOOK011-44332211( JAIN BOOK DEPOTC - 4, Opp.)

3 PVR Plaza, Post Box. No. 51,Connaught Place, New Delhi-110001 (India)Phone : 011- 23416101 / 02 / 03E-mail : byJBA DISTRIBUTORS4574 / 15, 2nd Floor, Padamchand Marg,Opposite Happy School, Darya Ganj, New Delhi- 110002 Tel.: 011-44332211, 44332222E-mail : : ; yksd foHkkxdsUnzh; yksd foHkkxdsUnzh; yksd foHkkxdsUnzh; yksd foHkkxdsUnzh; yksd Hkou] ubZ fnYyh Hkou] ubZ fnYyh Hkou] ubZ fnYyh Hkou] ubZ fnYyh Hkou] ubZ fnYyh 110011 Central Public Works DepartmentNirman Bhawan, New Delhi- 110011 Tel : 23062556 / 1317, Fax : 23061884E-Mail : ljdkjHkkjr ljdkjHkkjr ljdkjHkkjr ljdkjHkkjr ljdkjGovernment of IndiaFOREWORDDIVAKAR GARGD irector GeneralCentral Public Works Department Analysis of Rates for Delhi is a verycomprehensive and useful document forming basis for the rates of various is based on scientific assessment of Inputs of materials, labour and machinery invarious items of work normally involved in civil construction was first compiled in the year 1950, followed by subsequent publication orrevision in the years 1955, 1962, 1972, 1977, 1985, 1997, 2007, 2012, 2013 &2014.

4 Since publication of Analysis of Rates for Delhi 2014, prices of labour andmaterials have registered some changes. Besides the decrease in the cost ofCement and Steel, a number of new construction materials have also & introduction of new technology and mechanization of constructiontechniques have also taken place. This has necessitated revision of existingAnalysis of Rates for Delhi 2014 to include the above changes. Accordingly, thisAnalysis of Rates for Delhi 2016 has been analysis of existing items has been updated in conformity with updated items ofworks in DSR wish to place on record the technical input and the effective coordination on thepart of Shri Abhai Sinha, Special (HQ), Shri Balraj Chadha, ADG (TD),Shri Sharma, Chief Engineer(CSQ) and the efforts put in byShri Chaudhary, Director (Tech & PR) and team of officers in CSQ unit infinalizing Analysis of Rates for Delhi 2016 in a record am sure that Analysis of Rates for Delhi 2016 shall be very usefuldocument to various Central Govt.

5 Ministries, Departments & Public SectorUndertakings also besides various units of CPWD.(Divakar Garg)DIRECTOR GENERALP lace : New DelhiDate : July, Analysis of Rates for Delhi 2016 is the revised edition of Analysis of Rates forDelhi 2014. of Rates for Delhi 2016 incorporates most of the analysis of items of Analysis of Rates forDelhi 2014 with updated correction slips, including analysis of existing items and also correspondingnew items introduced in DSR of Rates for Delhi, 2016 is published in two volumes volume I & II as under:VolumeSub-head Sub-headNumberOne00 Basic Rates01 Carriage of Materials02 Earth Work03 Mortars04 Concrete Work05 Reinforced Cement Concrete06 Brick Work07 Stone Work08 Marble & Granite Work09 Wood and PVC Work10 Steel Work11 Flooring12 RoofingTwo13 Finishing14 Repairs to Buildings15 Dismantling and Demolishing16 Road Work17 Sanitary Installations18 Water Supply19 Drainage20 Pile work21 Aluminium Work22 Water Proofing23 Rain Water Harvesting & Tubewells24 Conservation of Heritage Glazing Aluminium Composite Panel26 New Technologies and of few existing items in sub head - 4 (RCC Work) and 18 (Water Supply) have beendeleted.

6 Similarly, analysis of many items have been modified to correspond to items of DSR2016. Several new analysis and sub items have been introduced in Analysis of Rates for Delhi2016. Labour coefficients for items of dry stone cladding, stone jali work in sub head 07 have alsobeen modified. Similarly, the labour coefficient for marble work 08 have also been of Rates for Delhi, 2016 is based on the study of current market rates of materials atDelhi, prevailing as on 01-04-2016. The basic rates of materials, incorporated in the analysis,pertain to materials conforming to BIS Standards/ CPWD Specifications/Materials of good qualitygenerally available in the market. Labour rates are taken from the minimum wages issued by theGovernment of Delhi and Central Govt. (whichever is higher) nomenclatures of main items have been printed along with the analysis of first Sub item only toconserve the space and number of have been considered as times based on Cost Index of Delhi as on (102) with base as per PAR-2012 as of efforts have gone into the preparation of this Analysis of Rates for Delhi 2016.

7 I convey mydeep appreciation and sincere thanks to Shri M K Sharma CE(CSQ), Shri S P Chaudhary, Director(T& PR), Shri Singh, SE (QA-cum-TLC), Shri Srivastava,E EE (QA) Shri , EE (QA) and team, Shri Sanjeev Rastogi , SE (C& M), Shri Virender Kumar, EE(C), Shri Keshav Ram, EE (M) and his team, Shri R B Garg, EE(TAS-II), Shri K R Meena,EE(TAD) and his team, Shri Adhikari, AE (QA) and other officers and staff of CSQ unitwhose names are not mentioned here, for sincere efforts made in the preparation of this documentin such a short time. Various Committees and field units, who contributed field inputs, also deserveappreciation for their timely care has been taken to print the Analysis of Rates for Delhi as correctly as is, however possible that some errors might have crept in. In case any error or omission isnoticed, it may be brought to the notice of the Superintending Engineer (TAS), CPWD, Room , A-wing, Nirman Bhawan, New Delhi.

8 (Balraj Chadha)ADG (TD), CPWD,Nirman Bhawan, New DelhiDated: July, 2016 VIISH. OF SUB-HEADPAGE CHARGES OF PLANTS & of Cement & Granite and PVC 1 VIIISH. OF SUB-HEADPAGE to Building829-90015 Dismantling and Demolishing901-93816 Road Work939-106617 Sanitary Installations1067-116218 Water Supply1163-138819 Drainage1389-148220 Pile work1483-151021 Aluminium Work1511-153822 Water Proofing1539-156623 Rain Water Harvesting & Tubewells1567-158624 Conservation of Heritage Glazing Aluminium Composite Panel1595-160626 New Technologies and Materials1607-1664 Note: For Sub Heads 1 to 12 refer to Vol. 1 CONTENTSVol. 2 SUB HEAD : HEAD : 13- mm cement plaster of mix :4 (1 cement: 4 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement : 4 fine sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of :6 (1 cement: 6 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement : 6 fine sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of mm cement plaster on the rough side of single or half brick wall of mix :4 (1 cement: 4 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement : 4 fine sand) as per Item Number of SH: (average) HEAD : 13- and 1 % Water 15 % Contractor's profit and of of.

9 6 (1 cement: 6 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement : 6 fine sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of mm cement plaster of mix :4 (1 cement: 4 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement : 4 fine sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of HEAD : 13- :6 (1 cement: 6 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement : 6 fine sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of mm cement plaster of mix :4 (1 cement: 4 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement :4 coarse sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of :6 (1 cement: 6 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement :6 coarse sand) as per Item Number of SH: (average) HEAD : 13- and 1 % Water 15 % Contractor's profit and of of mm cement plaster on rough side of single or half brick wall of :4 (1 cement: 4 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement :4 coarse sand) as per Item Number ofSH: (average) and 1 % Water 15 % Contractor's profit and of of :6 (1 cement.)

10 6 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement :6 coarse sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of HEAD : 13- mm cement plaster of mix :4 (1 cement: 4 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement :4 coarse sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of :6 (1 cement: 6 coarse sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 6 (1 cement :6 coarse sand) as per Item Number of SH: (average) and 1 % Water 15 % Contractor's profit and of of mm cement plaster finished with a floating coat of neat cement of mix :3 (1 cement: 3 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 3 (1 cement : 3 fine sand) as per Item Number of SH: HEAD : 13- FINISHINGLABOUR0155 Mason (average) and Cement (OPC-43 grade) of (average) and 1 % Water 15 % Contractor's profit and of of :4 (1 cement: 4 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 4 (1 cement : 4 fine sand) as per Item Number of SH: (average) and Cement (OPC-43 grade) of (average) and 1 % Water 15 % Contractor's profit and of of mm cement plaster on rough side of single or half brick wall finished with afloating coat of neat cement of mix :3 (1 cement: 3 fine sand)CodeDescriptionUnitQuantityRateAmou ntDetail of cost for 10 sqmMATERIALC ement mortar 1 : 3 (1 cement : 3 fine sand) as per Item Number of SH.