1 CONSTRUCTION OFANINDUSTRIALFACILITYANDOFFICESForW lamb LTDUnit 1, Plot 1and 2 aston 41 aston CLINTONSPECIFICATIONM arch20172 CLAUSE AND CONTENTS Design, Materials and Workmanship (BASED ON NBS STANDARD WORK SECTIONS)CExisting site/buildings/servicesC10 Site surveyC11 Site investigationC20 DemolitionDGroundworkD20 Excavating and fillingEIn situ concrete/Large precast concreteE05In situ concrete construction generallyE10 Mixing/casting/curing in situ concreteE30 Reinforcement for in situ concreteE40 Designed joints in in-situ concreteE41 Worked finishesto in-situ concreteE60 Precast/composite concrete floors/roof decksFMasonryF10 Brick/ block wallingF30 Accessories/ sundry items for brick/ block/ stonewallingF31 Precast concrete sills/ lintels/ copings/ featuresGStructural/Carcassing metal/timberG10 structural steel framingG12 Isolated structural metal membersG20 Carpentry/ timber framing/ first fixingG30
2 Metal profiled sheet deckingHCladding/CoveringH20 Rigid sheet claddingH31 Metal profiled/ flat sheet cladding/ coveringH32 Plastics profiled sheet cladding/ coveringH43 Metal composite panel cladding/ coveringJWaterproofingJ40 Flexible sheet tanking/ damp proofingJ42 Single layer polymeric sheet roof coverings3 KLinings/Sheathing/Dry partitioningK10 Plasterboard dry linings/ partitions/ ceilingsK32 Panel cubiclesK40 Demountable suspended ceilingsLWindows/Doors/StairsL10 Windows/ Rooflights/ Screens/ LouvresL20 Doors/ shutters/ hatchesL30 Stairs/ ladders/ walkways/ handrails/ balustradesL35 Fixed utilitarian access systemsL40 General glazingMSurface finishesM10 Cement based levelling/ wearing screedsM12 Resin flooringM40 Stone/ concrete/ quarry/ ceramic tiling/ mosaicM50 Rubber/ plastics/ cork/ lino/ carpet tiling/ sheetingM60 Painting/clear finishingM61 Intumescent coatings for fire protection ofSteelworkNFurniture/EquipmentN10 General fixtures/ furnishings/ equipmentN13 Sanitary appliances and fittingsN14 General signage systemsN15 Fire and safety signage systemsN17 Portable fire fighting systemsN25 Permanent access and safety equipmentPBuilding fabric sundriesP10 Sundry insulation/ proofing workP12 Fire stopping systemsP20 Unframed isolated trims/ skirtings/ sundry itemsP21 Door/ window ironmongeryP30 Trenches, pipeways and pits for buriedengineering servicesP31 Holes, chases.
3 Covers and supports for servicesQPaving/Planting/Fencing/Site furnitureQ10 Kerbs/ edgings/ channels/ pavingaccessoriesQ31 External plantingQ35 Landscape maintenanceQ40 FencingQ41 Barriers/ guardrailsRDisposal systemsR10 Rainwater drainage systemsR11 Above ground foul drainage systemsR12 Below ground drainage systemsR18 Pumping stations and pressure pipelines4 XTransport SystemsX12 Vertical Platform Lift SystemsZBuilding fabric reference specificationZ10 Purpose made joineryZ11 Purpose made metalworkZ12 Preservative/ fire retardant treatmentZ20 Fixings and adhesivesZ21 MortarsZ22 SealantsZ31 Powder willcomprise thecivil, structural and building works associatedwith theconstruction ofan industrial unitwith associated offices at aston 41industrial estate, Aylesbury, development will include car parking, operational yard area, landscaping,services and drainage all as described on the contract drawings and in thecontract scope of the Project includes the construction of the estate road servingthe site.
4 The road, footpaths and street lighting are to be constructed toadoptable standards and strictly in accordance with the Consultant Engineersdetails and drawings. A separate specification isincluded in the contract setcovering the road and associated accommodation to be provided includes a large open production spacewith 2 storey offices. The ground floor of the offices includes the mainentrance and reception leadingto the main accommodation firstfloor contains offices andstaff toilets. Enclosed fire escape/access stairs linkthe first floor offices to the production area and provide means of project has Planning Permission.
5 Copies of the consent are included in theEmployers requirements has taken place with the Building Regulations ApprovedInspector, Approved Design, during the course of design development. Copiesof the consultation report are included in the Employers Requirement reference is made in this specification to specific products ormanufacturers, alternatives of similar quality and performance may besubstituted subject to prior written approval of theArchitect and noted and listed in the Preliminaries and Pre-ambles section ofthe tender elements of the works, materials, and workmanship will be designed andconstructed in accordance with all relevant BritishStandards and Codes ofPractice current at the time of commencement of the works including (but notexclusively) the following.
6 -The 16th Edition of the IEE Wiring RegulationsHealth and Safety at Work ActLocal Water Board Requirements and RegulationsThe Gas Safety RegulationThe Clean Air ActsThe Local Authority Building Regulations 1992 and subsequentamendmentsthereto, subject only to the relaxations sanctionedby the DepartmentforCommunities and Local requirements of theUtility Supply Local Authorities and LocalPlanning British Standards and Codes of Practice6 The requirements of the Local Fire BrigadeThe CIBSE GuidesThe Factories Act 1961 Local Authority Bye-LawsThe Electricity Supply ActConstruction (Design and Management) Regulations (CONDAM)2007 Exclusion of materials identified as potentially hazardous in BPF/BCO report Good practice in the selection of construction materials -Highways Agency Design site will be regularly cleaned of all dust and debris arising from the workstoprevent the accumulation of debristhatcouldcause problems at will take place at least once per week.
7 Operatives and sub-contractors will be madeaware of the required standards and will be requiredto take measures in the manner of working to minimise the risk of dirt anddust accumulation. Regular inspections will take , Materials and design, materials, workmanship and any testing shall all be in accordancewith the latest amendments of the Building Regulations, the relevant BritishStandards and any other relevant mandatory documents at the time of design life of the structural and civil elements shall be as follows;Building structure50 yearsDrainage50 yearsRoads and Paving25years without significant maintenance design, materials and workmanship of the structural and civil elements ofthis project shall be in accordance with the current revisions and amendmentsof the following documents.
8 The Building RegulationsBRE Design GuidesThe Highways Agency design guidelinesThe national structural steelwork Spec (NSSS)The national Building Spec (NBS)NHBCBS EN 752 Drain and Sewer systems outside buildingsBS5268 structural use of TimberBS5628 structural use of MasonryBS5950 structural use of steelwork in BuildingsBS6399 Loading for Buildings7 Part 1 Dead and Imposed LoadsPart 2 Wind LoadsPart 3 Imposed Roof LoadsBS8000 Workmanship on Building SitesBS8002 Earth Retaining StructuresBS8004 FoundationsBS8102 Protection of structures against water from thegroundBS8110 structural use the purposes of the tender, the following drawings are to be read inconjunction with this specification and theContractdocuments:-TheDCMP artnershipdrawings.
9 866/C/001 CSite Plan866/C/101 ASite Setting Out866/C/201 EWarehouse Floor Plan866/C/202 GOffice Plans866/C/204 AMain Staircase866/C/301 ARoof Plan866/C/401 EElevations866/C/501 ESections866/C/801 BDoor Schedule866/C/802 AWindow Schedule866/C/803 ASchedule ofInternalColours and Finishes866/C/901 BExternal supply of all fire fighting equipment, hose reels, smoke ventilators andextinguishers and any otherfirst aidfire fighting equipment as a requirement of theLocal Authority Building Regulations and/or Bye Laws or the Fire Officer other thanincluded in the scope of works. The use and supply of the items above to comply withthe Regulatory Reform Order and dataequipmentSignageSecurity Alarmand CCTV installationLoose furniture, shelving, racking, kitchen equipment.
10 Reception information contained in this specification is to supersede anyreferences noted on the planning following specification is written in NBS format for the sake of site/buildings/servicesC10 Site the areaproduced byMilton KeynesSurveysisavailable showingthe siteand associated external Contractor isto ensure that all necessary site investigation has beencarried geo-technical survey is available but the contractor should carryout investigations to verify the notifytheArchitectifitbecomesapparenttha tany aspectofsurvey informationis missingand deemed to be (refer to Campbell Reith specification )D20 Excavating and site will be cleared by the Contractor of any obstructions in the groundnecessary forthe construction of the it is necessary to remove shrubs, trees, bushes, hedgerows etc, in orderto properly complete the Works, the Contractor is to allow for all necessaryexcavation and back filling to properly deal with the effects of root action ofthe shrubs, trees, bushes, hedgerows etc, including the removal of desiccatedclay or any other resultant ground conditions which are unsuitable for thescheme to be for the removal ofanytrees and shrubs willbe issued by , where necessary, will be cleared out.