Example: tourism industry

WASHINGTON STATE ENERGY CODE RESIDENTIAL 2018 …

One set of approved construction documents shall be retained by the code official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws. SECTION R104 INSPECTIONS R104.1 General. Construction or work for which a permit is required shall be subject to inspection by the

Tags:

  Permit

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of WASHINGTON STATE ENERGY CODE RESIDENTIAL 2018 …

Related search queries