1 Joseph Chamberlain College,Birmingham302 CasoLine MFConcealed grid MF suspended ceiling systemThis section includes updated information, addedsince it was first published in July 2009. Please seethe WHITE BOOK update document for updated 05/09/2011!3 CasoLine MFis a suspended ceiling system suitable for mostinternal drylining applications. The fully concealed grid andceiling lining can be used in conjunction with Gyprocplasterboards and Gyptone and Rigitone boards to create aseamless, monolithic RAPIDdB PlusCasoLine MF3038lMonolithic appearancelSuspension from concrete or timber floorsand purlinslAcoustic hangers provide option of resilient suspensionlDurable ceiling lininglVentilation ducts and other services accommodated in plenumlSimple accommodationof access panelslEasy to create bulkheads and level changelEasily integrated with CasoLine GRIDlFully integrated access hatchesKey factsCasoLine MF6850120mins566630 ALnwdBImpactRwdBAirborneGyproc Wafer Head Jack-Point ScrewsGypframe MF7 Primary Support ChannelGypframe MF6 Perimeter Support ChannelGypframeMF5 CeilingSectionA+++- wSound multi-occupancyHealthcareApartment
2 Buildings33 ApplicationsA wide range of residential and commercial use genuine branded British Gypsum components to qualify for SpecSure lifetime warrantyLIFETIMESYSTEMWARRANTYSPECSUREA lways use genuine branded British Gypsum components to qualify for SpecSure lifetime warrantyLIFETIMESYSTEMWARRANTYSPECSURES ystem componentsGypframe metal productsMF5 Ceiling SectionLength 3600mmSecondary section below Gypframe MF7 Primary Support SealantSealing air paths for optimum sound jointing materialsFor seamless and finishing productsInsulation productsMF6 Perimeter ChannelLength 3600mmPerimeter support for Gypframe MF5 Ceiling productsGyproc , 15mmWidth1200mmGyproc , 15mmWidth900mmGyproc , 15mmWidth900mmGyproc Drywall ScrewsFor fixing boards to Gypframe metal framing less thick ( I studs less than thick).
3 MF7 Primary SupportLength 3600mmChannelPrimary support Strap HangerLength 25m (coil)Suspension of ceiling Steel AngleLength 2900mmMF9 Connecting ClipAlternative method for fixing Gypframe MF5 Ceiling Section to Gypframe MF7 Primary Support Nut and BoltJoining hangerto soffit Soffit CleatSuspension pointfrom structural available in DUPLEX grades where vapour control is F MULTIBOARDT hickness6, 10, Profilex Access PanelsFor access to the plenum for maintenance Wafer Head Drywall ScrewsFor Gypframe metal-to-metal fixing less than thick ( I studs less than thick).Isover Spacesaver Ready-Cut100mm, for improved acoustic and installation toolsFor installation and finishing of Rigitone GypPrimeFor controlling suction on Rigitone board Vario 60 For jointing of Rigitone F FIRECASET hickness15mmWidth600, 1200mmGyproc Wafer Head Jack-Point ScrewsFor fixing hanger to Gypframe MF7 Primary SupportChannel, and for fixing Gypframe MF5 Ceiling Sectionto Gypframe MF7 Primary Support mineral wool (by others)
4 To achieve fire Access PanelsTo integrate with the Gyptone range of ceiling boards - LINE 6, Q UAT TRO 4 1, 46 and Frame Batt 3250mm, for improved acoustic, thermal and Sound Deadening Floor SlabFor providing sound deadening in timber-basedintermediate separating APR 120025mm and 50mm, for improved acoustic and Acoustic HangerLength 35mmGAH2 Acoustic HangerLength 70mm(supplied with washers).Thistle Multi-Finish or Thistle Board FinishTo provide a plaster skim Spray FinishGypsum finish plaster for spray or hand 0844 800 1991 F 0844 561 8816 E MF8 Gyptone Q UAT TRO 4 6 Thickness Q UAT TRO 4 7 Thickness LINE 6 Thickness 8/18 Thickness 10/23 Thickness 15/30 Thickness 12-20/66 Thickness 8-15-20 Thickness 8-15-20 SUPERT hickness Q UAT TRO 4 1 Thickness Q UAT TRO 4 5 Thickness board productsSystem components (continued)
5 Rigitone board productsGyptone LINE 7 CurveThickness BASEC urveThickness use genuine branded British Gypsum components to qualify for SpecSure lifetime warrantyLIFETIMESYSTEMWARRANTYSPECSUREA lways use genuine branded British Gypsum components to qualify for SpecSure lifetime warrantyLIFETIMESYSTEMWARRANTYSPECSUREFo r full installation details, refer to the British Gypsum SITEBOOK, available to download from from concrete soffitGypframe MF6 Perimeter Channel is fixed to the wall at maximum600mm centres, and Gypframe MF12 Soffit Cleats secured to thesoffit at 1200mm centres, using appropriate fixings . Gypframe MF8 Strap Hanger or Gypframe GA1 Steel Angles are pre-cut and securedto the soffit cleats with Gypframe MF11 Nut and Bolt.
6 Gypframe MF7 Primary Support Channels are installed over the Gypframe MF6 Perimeter Channels. Fix hangers (two per fixing) to Gypframe MF7 Primary Support Channel using Gyproc Wafer Head Jack-PointScrews. Gypframe MF5 Ceiling Sections are run at right angles to theunderside of primary channels to form the secondary grid. The ceilingsections are secured to the primary channels by using two GyprocWafer Head Jack-Point Screws. Alternatively, the Gypframe MF5 Ceiling Sections can be secured to the Gypframe MF7 PrimarySupport Channels using Gypframe MF9 Connecting Clips. Pleaserefer to Ceiling lift in the Design section. Boards are fixed to thesecondary grid to form single or multi-layer linings as from timber joistsThe procedure is as for concrete except that soffit cleats are notrequired hangers are twice fixed directly to the side of the fixingsBoard fixings for Gyproc and British Gypsum specialist boards shouldbe at 150mm centres at board-ends, and at 230mm centres withinthe field of the fixings for Gyptone boards should be at 230mm centres acrossboard-ends and through the field of the board.
7 Board fixings forRigitone boards should be at 150mm centres at perimeters and230mm through the field of the special procedure is used for fixing and jointing Rigitone installation notes are given in the current British GypsumCeilings Installation Guide, available to download full installation details, refer to the British Gypsum SITEBOOK, available to download from overviewTable 2 CasoLine MFfire protection to floor or roof cavity above suspended ceilingSolutions to satisfy the requirements of BS EN 1364-2: 1999 Table 1 CasoLine MFfire protection to timber floor constructionSolutions to satisfy the requirements of BS EN 1365-2: 2000307T 0844 800 1991 F 0844 561 8816 E MF8 Performance (Refer to section 3 - Basic principles of system design)DetailBoardCeilingMF5MF7 Systemtypeliningsupportsupportreferencet hicknesscentrescentresmmmmmmFireLine2 x F M U LT I B OA R D3 x 104501200G10603512160 minutes fire resistanceFloor boarding of 21mm minimum t&g softwood or wood particle floor boarding.
8 Solid timber joists 38 x 195mm at 600mm centres. CasoLineMFsuspendedceiling fixed to joists. Ceiling linings as in boarding of 21mm minimum t&g softwood or wood particle floor boarding. Solid timber joists 38 x 195mm at 600mm centres. CasoLineMFsuspendedceiling fixed to joists. Ceiling linings as in x F FIRECASE2 x 154501200G106040111 CasoLineMFsuspended ceiling fixed to structure. 25mm stone mineral wool slabs (100kg/m3) laid over Gypframe MF5 Ceiling Section. Ceiling linings as in minutes fire resistanceFire resistance60 minutes fire resistance30 minutes fire resistanceENENENENENLIFETIMESYSTEMWARRAN TYSPECSURENBS work section K10 - Plasterboard drylinings / partitions / ceilingsENLIFETIMESYSTEMWARRANTYSPECSURE 11 The requirement for providing cavity barriers in the same plane as fire-resistant walls may not apply to cavities in floors and roofs if the ceiling beneath thefloor or roof cavity provides a minimum of a full 30 minutes fire resistance (30 mins.)
9 Integrity : 30 mins. insulation) in addition to satisfying other to section 10 Cavity fire fire resistance and sound insulation performances are for imperforate partitions, walls and ceilings incorporating boards with all joints taped and filled, or skimmedaccording to British Gypsum s recommendations. The quoted performances are achieved only if British Gypsum components are used throughout, and the Company s fixingrecommendations are strictly observed. Any variation in the specifications should be checked with British 4 CasoLine MFfire protection to floor or roof cavity above suspended ceilingSolutions to satisfy the requirements of BS 476: Part 22: 1987 Table 3 CasoLine MFfire protection to timber floor constructionSolutions to satisfy the requirements of BS 476: Part 21.
10 MF8 NBS work section K10 - Plasterboard drylinings / partitions / x x x x 1525450900C106004 Glasroc F M U LT I B OA R D3 x 10304501200G10603532221120 minutes fire resistanceDetailBoardCeilingMF5MF7 Systemtypeliningsupportsupportreferencet hicknesscentrescentresmmmmmmWallBoard2 x x 154501200C106051121 The requirement for providing cavity barriers in the same plane as fire-resistant walls may not apply to cavities in floors and roofs if the ceiling beneath thefloor or roof cavity provides a minimum of a full 30 minutes fire resistance (30 mins. integrity : 30 mins. insulation) in addition to satisfying other to section 10 Cavity fire fire resistance and sound insulation performances are for imperforate partitions, walls and ceilings incorporating boards with all joints taped and filled, or skimmedaccording to British Gypsum s recommendations.