William E. dunn Water Reclamation Facility Facility Overview & Information Facility Highlights General Area Served: Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa Road to Keystone Road (N/S) Owner: Operator: Pinellas County Utilities Pinellas County Utilities Plant History 1973 Million Gallons per Day (MGD) Extended Aeration wastewater treatment Facility , utilizing reclaimed Water distribution for effluent disposal. 1985 Construction of new MGD 5-stage Bardenpho Advanced Wastewater Treatment Water Reclamation Facility , with expanded utilization of reclaimed Water distribution. Old MGD Facility taken out of service. 1993 - Existing Facility enhanced by construction of Center Oxidation Ditch, for improved process stability. Mid-1990 s - East Lake Tarpon area PCU package wastewater treatment facilities phased out and flows diverted to William E.

bardenpho process flow measurement grit removal effluent storage disinfection filtration solids handling clarification effluent reuse screening influent preliminary

Tags:

  Water, Facility, Removal, William, William e, Reclamation, Dunn, Dunn water reclamation facility

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of William E. Dunn Water Reclamation Facility Facility ...

1 William E. dunn Water Reclamation Facility Facility Overview & Information Facility Highlights General Area Served: Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa Road to Keystone Road (N/S) Owner: Operator: Pinellas County Utilities Pinellas County Utilities Plant History 1973 Million Gallons per Day (MGD) Extended Aeration wastewater treatment Facility , utilizing reclaimed Water distribution for effluent disposal. 1985 Construction of new MGD 5-stage Bardenpho Advanced Wastewater Treatment Water Reclamation Facility , with expanded utilization of reclaimed Water distribution. Old MGD Facility taken out of service. 1993 - Existing Facility enhanced by construction of Center Oxidation Ditch, for improved process stability. Mid-1990 s - East Lake Tarpon area PCU package wastewater treatment facilities phased out and flows diverted to William E.

2 dunn Wastewater Reclamation Facility (WED WRF) for treatment. 2002 - Construction of new Facility Administration Building, with adjacent open public park area and education kiosk. 2004 - Phase 2 & 3 construction upgrades and modernization of the WED WRF. Facility Operation Average Daily Flow MGD Operating Schedule 24 hours per day, 365 days per year Number of Collection System pump stations approximately 150+ Number of staff 24 positions (Administration, Operation & Maintenance) Type of Process Activated Sludge Process Mode 5-stage Bardenpho Advanced Wastewater Treatment Process Flow Distribution 100% reclaimed Water distribution for irrigation purposes Biosolids Production about 1,500 dry tons per year (375+ semi-trailers) Biosolids Reuse dried sludge is used as a soil amending agent (fertilizer) Annual Budget - $5 million Average Treatment Cost per Million Gallons - $2000 North County Collection System Area (crosshatched area) William E.

3 dunn WRF Plan Drawing MechanicalScreens (3)Grit RecoveryUnits (3)ScreeningstoDisposalFermentationTank1 st AnoxicTankOxidationReactor2nd AnoxicTankReaerationFermentationTank1st AnoxicTankOxidationReactor2nd AnoxicTankReaerationDistributionBoxes (2)Final ClarifierTanks (6)Influent& RASFlowMetersSludgePumpingStationABW SandFilters (4)PolyaluminumChlorideChlorineInternalR ecyclePumpStations (2)ChlorineContact Tanks(3)Reject WaterStorage PondReclaimed WaterStorage PondLowPressureRCW PumpsHigh PressureRCW PumpsLow Pressure ReclaimedWater (RCW)High Pressure RCWto Off-Site IrrigationPlantDrainBackwashWaterBeltPre ssBeltPressAeratedSludgeHoldingTanks (2)Sludge FeedPumps (2)ReturnActivatedSludge(RAS)Waste ActivatedSludge (WAS)InfluentChlorinePolymerFiltrateDewa teredSludge WRFP rocess Flow One of 6 Clarifiers RCW WW Elevation Storage Gallons Usable RCW Operational Alarm (Feet) (Millions) Wet Well Level Volume (mg)

4 Levels Overflow @ High-High @ High @ Low @ Low-Low @ Pump Cut Off @ Usable storage volumeis approx MG William E. dunn WRF RCW Storage Pond Levels ~\WI~~~ ~ ool~~ 0 I _f' I ~ ~.

5 BARDENPHOPROCESSFLOWMEASUREMENTGRITREMOV ALEFFLUENTSTORAGEDISINFECTIONFILTRATIONS OLIDSHANDLINGCLARIFICATIONEFFLUENTREUSES CREENINGINFLUENTPRELIMINARYTREATMENTEFFL UENTDISPOSALEFFLUENTPOLISHINGBIOLOGICALT REATMENTR emoval of rocks, rags,and other debrisRemoval of sand and gritMeasurement of Influentand Return ActivatedSludge (RAS) flow rateBiological Oxygen Demand(BOD) and Nutrient removalSeparation of suspendedbiological solids from wastewaterTreatment & disposal ofsolids from other processesRemoval of suspended solidsnot removed by ClarificationDestruction of disease-causing organismsStores reclaimed Water untilneededHighly treated effluent isreused as irrigation dunn WRFP rocess Flow Chart