Construction Contractor Selection Criteria - …
Construction Contractor Selection Criteria Prepared by: Michael McCormick, Management Consultant October 2010 Page 1 This is easier to say than to do. Every client needing to build or renovate is faced with trying to assemble the best design and Construction team. They usually hire the design team first and do so with a qualifications based Selection . For a variety of reasons (schedule being the most common), the Contractor Selection is increasingly being made based on something other than a low bid. The question is what to use as the basis of the Contractor Selection . Best value bid or qualifications based Selection ? When the Contractor Selection is based on something other than a low bid, the first question is should the Client owner make their Contractor Selection based on a process that includes some weighting of the total Construction cost, or not?
Construction Contractor Selection Criteria Prepared by: Michael McCormick, Management Consultant – October 2010 Page 2 www.mccormickpcs.com
Download Construction Contractor Selection Criteria - …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Contract Administration, Delegations and, Contract Administration, Delegations and Reporting, Of Practice for the Construction, Of Practice for the Construction Industry, Best, Construction, TECHNICAL ARTICLE Construction, Underground Mining, Newport Administration Building DRAFT, Newport . Administration Building . DRAFT Findings in