Installation & Programming Manual
1Quick Reference Refer to Quick Reference area and illustrations to identify components. Prepare door, per additional instructions (included) before installing unit. IMPORTANT: Read instructions completely before beginning the checklist below to assure completion of important steps. ATTACH CONNECTOR ........................................ .. PROGRAM CODE(S) ........................................ ..... VERIFY OPERATION ........................................ ..... Section 6Section 10 a, b, cSection 10 d1 23 45 67 89 0Copyright 2009 Black & Decker Corporation40490-01 SmartCode Lever Manual ProgramButtonMountingHolesTurnpieceLockB uttonCylinderSettingsSwitchPanelKeypadLE DCylinderGetting StartedInstallation & Programming ManualInteriorAssemblyInteriorCoverHalf roundSpindleExterior AssemblyLeverLatchLeverMountingPlateMoun tingBoltsInteriorAssemblyExterior Assembly22-3/8" (60mm)or 2-3/4" (70mm)1. Install latch and 1Fig. 2d. Install strike plate onto door jamb using two small screws.
5 8. Mount the levers. a Check both the interior and the exterior assemblies, to make sure the set screw is located on the opposite side, (the side furthest away from the latch bolt).
Download Installation & Programming Manual
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Section 33. Programming and Diagnostics, Section 33. Programming and Diagnostics Programming, 5000M CNC Programming & Operations Manual, Programming, Manual, OPERATION MANUAL, Model 5010 GroundFX Row Cleaner Assembly, GSM Automatic Voice Dialer Installation Operation Manual, GSM Automatic Voice Dialer INSTALLATION, Programming Manual, Customer Programming Manual