Practice Note for Authorized Persons, Registered ...
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-37 Curtain Wall, Window and Window Wall Structural Submission of Curtain Wall Plans Curtain wall should be designed to meet the performance requirements set out in sections 29 to 31 of the Building (Construction) Regulation (B(C)R). Attention should be paid to the requirements for wind loads, horizontal imposed loads specified in section 9 of and Table 3 in the Schedule to the B(C)R on curtain wall when there is no protective barrier provided, protection of openings, protection against corrosion and the quality of materials.
approval and consent from the BA. For the list of minor works items and the simplified requirements, please refer to Schedule 1 of the Building (Minor Works) Regulation and Practice Note for AP, RSE and Registered Geotechnical Engineers (PNAP) APP-147 respectively. Design and Construction Standards 8.
Download Practice Note for Authorized Persons, Registered ...
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: