204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 excavation and backfill for structures DESCRIPTION Excavate for the STRUCTURES as shown in the Contract Documents. Unless specified otherwise, BACKFILL the completed STRUCTURES to the original ground line. BID ITEMS UNITS Class * EXCAVATION Cubic Yard Concrete (Grade **)(**) Cubic Yard Concrete for Seal Course (Set Price) Cubic Yard Foundation Stabilization Cubic Yard Foundation Stabilization (Set Price) Cubic Yard Granular BACKFILL Cubic Yard Granular BACKFILL (Wingwalls) (Set Price) Cubic Yard Water (Grading) (Set Price)
204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents.