25It is essential to identify location of openings, mechanical and electrical (M&E) services, and other fixtures before INSTALLATION of drywall. The setting out of the framing system, openings and additional supports are critical contributors toward the functionality of the drywall. Sequence of board INSTALLATION , proper infill and insulation material INSTALLATION , and treatment material compatibility are also important to achieving quality work. All site work should be carried out in a safe manner to comply with safety Framing WorksFraming works form the structural component of the drywall.
INSTALLATION 28 6.2 Opening The most common openings on drywall are for doors. Such openings are usually reinforced by the introduction of box stud to stiffen the opening.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
28 vertical movement joints - end walls, Movement joints, 1600 Piling and Embedded Retaining Walls, Wall Ties, Wall Ties Movement, Fosroc Proofex Engage constructive solutions, Coursing Tables, Metric Shapes and Sizes, Seismic requirements for fire protection systems, CHAPTER VII. Design-POWER WATERWAYS, FIRE-SHIELD GYPSUM BOARD, FIRE-SHIELD® GYPSUM BOARD, Chapter 8 - Concrete