Transcription of Appendix C Frac-Out Contingency Plan for …
{{id}} {{{paragraph}}}
Appendix CFrac-Out Contingency plan for HorizontalDirectional Drill: Appendix CFrac-Out Contingency plan for HorizontalDirectional DrillingThe natural gas pipeline extension to the Cosumnes Power Plant (CPP) is proposed to crossthe Cosumnes River, Badger Creek, and Laguna Creek by horizontal directional Drilling(HDD). HDD is less intrusive than traditional open-cut trenching where habitats sustaindirect soil , or inadvertent return of drilling lubricant, is a potential concern when the HDD isused under sensitive habitats, waterways, and areas of concern for cultural resources. TheHDD procedure uses bentonite slurry, a fine clay material as a drilling lubricant. Thebentonite is non-toxic and commonly used in farming practices, but benthic invertebrates,aquatic plants and fish and their eggs can be smothered by the fine particles if bentonitewere discharged to purpose of a Contingency plan or Frac-Out plan is to: Minimize the potential for a Frac-Out associated with horizontal directional drillingactivities Provide for th
Appendix C Frac-Out Contingency Plan for Horizontal Directional Drilling The natural gas pipeline extension to the Cosumnes Power Plant (CPP) is proposed to cross
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
WIND ENERGY POTENTIAL ASSESSMENT IN NEPAL, Potential, Energy, ANALYSIS REPORT: BASELINE, ENERGY SAVINGS, Analysis report: Baseline, Energy savings potential, Petroleum and Mineral Resources Eng., Energy Potential, Petroleum and Mineral Resources Eng. Sherif Ismail, Potential energy, Potential Induced Degradation