Transcription of Chapter 2 - Inspections, Tests and Safety …
{{id}} {{{paragraph}}}
Chapter 2 Inspections, Tests and Safety Considerations15 Chapter 2 Inspections, Tests and Safety ConsiderationsScopeOnce a PE piping system has been selected and designed for an application, the design is implemented by procuring the pipe, fittings and other necessary appurtenances, installing the system, and placing it in service. Piping installation involves people and machines in motion to move, assemble, install, inspect and test the piping system. Whenever moving machinery, piping parts, and personnel are engaged in piping system construction, Safety must be a primary consideration.
Chapter 2 Inspections, Tests and Safety Considerations 17 Figure 1 Typical Truckload of Coiled, Silo-Pack Pipe (40’ Trailer) PE pipe is produced in coils or in straight lengths and shipped on fl atbed trailers.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
An Introduction to Coiled Tubing, Coiled tubing, Coiled Tubing Hydraulics Modeling, Introduction, National Oilwell Varco, Tubing Forces Model (TFM) Calculation, UNMANNED WELLHEAD PLATFORMS - UWHP, UNMANNED WELLHEAD PLATFORMS - UWHP SUMMARY REPORT, 120591 Horizontal Well Production Logging, 120591 Horizontal Well Production Logging Deployment