Transcription of CHAPTER 26 GENERAL PLUMBING REQUIREMENTS
{{id}} {{{paragraph}}}
CHAPTER 26 GENERAL PLUMBING REQUIREMENTSSECTION provisions of this CHAPTER shall govern theinstallation of PLUMBING not specifically covered in other chap-ters applicable to PLUMBING systems. The installation of plumb-ing,appliances, equipmentand systems not addressed by thiscode shall comply with the applicable provisions of theFloridaBuilding Code, fixtures, drains andappli-ancesused to receive or discharge liquid wastes or sewage shallbe connected to the sanitary drainage system of the building orpremises in accordance with the REQUIREMENTS of this section shall not be construed to prevent indirect Flood hazard areas prone to flooding asestablished by Table (1)
The maximum horizontal spacing of cast-iron pipe hangers shall be increased to 10 feet where 10-foot lengths of pipe are installed. b. Midstory guide for sizes 2 inches and smaller. P2608.4 Third-partytestingandcertification.Allplumbing products and materials shall comply with the referenced stan-
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}