Transcription of Commissioning Plan - Architecture Engineering and …
{{id}} {{{paragraph}}}
July 2016 Generic Sample Commissioning Plan Building Name: _____ Project Name: _____ U-M Project U-M Building Editor s Notes: 11/26/01: Revised Training and added O&M under part 5/22/12: Revised the Progress Check Sheet sample to the condensed version. Changed all references from Commissioning Agent to Commissioning Authority . 9-1-14: Revised title to Commissioning Plan instead of Commissioning Manual and other minor changes to align better with ASHRAE Standard 202-2013. D. Karle for CPR dept. 3/23/16: Minor terminology changes and spec check.
operated as intended by the design team and users. Commissioning is a team effort that ... (GC) (or the Construction Manager (CM)).It is the responsibility of the Contractors to provide, through the GC (CM), all commissioning ... from submittal phase, through installation, pre-start tests, startup, functional - ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}