Energy Efficiency - Building Performance
6 1 January 2017 MINISTRY OF BUSINESS, INNOVATION AND EMPLOYMENT ENERGY EFFICIENCY Clause H1 Provisions H1.3.2EBuildings must be constructed to ensure that their building performance index does not exceed 1.55. H1.3.3 Account must be taken of physical conditions likely to affect energy performance of
Tags:
Performance, Building, Energy, Energy performance, Performance buildings
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Constructing Cavities - Building Performance
www.building.govt.nzTable 23 (’Properties of roof underlays and building wraps‘). Install the wall underlay directly over the framing. Install the cavity battens directly over the wall underlay as described in Cavity battens on page 9. No additional wall underlay is needed between the wall cladding and the cavity battens except in the following situations.
Building, Constructing, Wrap, Cavities, Building wraps, Constructing cavities
C/AS2 - Acceptable Solution for Acceptable Solution for ...
www.building.govt.nzC/AS2 Acceptable Solution for Buildings with Sleeping (non institutional) (Risk Group SM) For New Zealand Building Code Clauses C1-C6 Protection from Fire
E2 External Moisture
www.building.govt.nzFor single- and two-storey concrete and concrete masonry construction within specific limitations: E2/AS3. For light steel framed buildings up to 3 storeys, within specific limitations: E2/AS4. E2.3.3 Ground contact or proximity All walls, floors and structural elements in ground contact or proximity, except for buildings where external
Building work that does not require a building consent
www.building.govt.nzGUIDANCE Building Act 2004 THIRD EDITION 2014 - AMENDED AUGUST 2017 Building work that does not require a building consent
Earthquake geotechnical engineering practice
www.building.govt.nzEarthquake geotechnical engineering is a highly specialised field. As such the investigations for this need to be developed and carried out by an appropriately qualified and experienced geotechnical engineer or engineering geologist (referred to herein as the geotechnical professional). For the purposes of this document ‘geotechnical
Module 6: Earthquake resistant retaining wall design
www.building.govt.nzguidance on earthquake design aspects for retaining . structures that are not well covered in these handbooks or elsewhere. The main objective is to identify situations where seismic design of retaining structures should be considered, to provide the necessary seismic parameters, and to identify key issues relating to seismic design.
Design, Seismic, Structure, Walls, Module, Resistant, Seismic design, Retaining, Earthquake, Module 6, Retaining structures, Earthquake resistant retaining wall design
Worked Example 4 | Design of a tied-back retaining wall to ...
www.building.govt.nzDesign of a tied-back retaining wall to resist earthquake loading . Worked example to accompany MBIE Guidance on the seismic design of retaining structures for residential sites in Greater Christchurch (Version 2) November 2014 . Tied-back retaining walls were used originally as a substitute for braced retaining walls in deep excavations.
Design, Seismic, Structure, Walls, Loading, Seismic design, Retaining, Earthquake, Sisters, Retaining structures, Retaining wall to resist earthquake loading
Acceptable Solutions and Verification Methods
www.building.govt.nz4.2 Sizing of downpipes 42 4.3 Installation of downpipes 42 5.0 Roof Gutters 42 5.1 Size of roof gutter 42 5.2 Materials44 5.3 Gradients44 5.4 Thermal movement 44 5.5 Overflow outlets 44 Appendix A Rainfall intensities 45 Index 47 Contents Amend 4 Dec 2000 Amend 4 …
Verification, Solutions, Methods, Acceptable, Roof, Appendix, Sizing, Acceptable solutions and verification methods
Acceptable Solutions and Verification Methods
www.building.govt.nz4.2 Sizing of downpipes 42 4.3 Installation of downpipes 42 5.0 Roof Gutters 42 5.1 Size of roof gutter 42 5.2 Materials44 5.3 Gradients44 5.4 Thermal movement 44 5.5 Overflow outlets 44 E1/AS1 Appendix A Rainfall intensities 45 Acceptable Solution E1/AS2 52 1.0 AS/NZS 3500.3 Stormwater Dec 2000 drainage52 Index 56 Contents Amend 4
Verification, Solutions, Methods, Acceptable, Roof, Appendix, Sizing, Acceptable solutions and verification methods
Commentary for Acceptable Solutions C/AS1 to C/AS7 ...
www.building.govt.nzDecember 2013. Contents Acceptable Solutions C/AS1 to C/AS7 Part 1: General 2 ... 4.11 Protected shafts 31 4.13 Floors 32 4.14 Subfloor spaces 32 ... INNOVATION AND EMPLOYMENT – 15 FEBRUARY 2013 I 1 Part 5: Control of external fire spread 34 5.1 General principles 34 5.2 Horizontal fire spread from external walls 36 5.5 Table method for ...
Related documents
A Guide to Building Energy Rating for Homeowners
www.seai.ieA Building Energy Rating or BER is an energy label with accompanying advisory report for homes. The rating is a simple A to G scale. A-rated homes are the most energy efficient and will tend to have the lowest energy bills. BER Cert Advisory Report A BER makes the energy performance of a home visible to prospective buyers
Guide, Performance, Building, Energy, Ratings, Building energy, Energy performance, Guide to building energy rating
FLORIDA BUILDING CODE, ENERGY CONSERVATION …
www.floridabuilding.orgFORMS R-56 FLORIDA BUILDING CODE — ENERGY CONSERVATION, 6th EDITION (2017) TABLE R402A NR = No requirement. (1) Each component present in the As Proposed home must meet or exceed each of the applicable performance criteria in order to comply with this code using
High-Performance Building Envelopes: Design Methods for ...
www.brikbase.orgHigh-performance sustainable facades can be defined as exterior enclosures that use the least possible amount of energy to maintain a comfortable interior environment, which promotes the health and productivity of the building’s occupants (Aksamija, 2013). This means that
Vermont Residential Building Standards (RBES) Energy Code ...
publicservice.vermont.govThe Vermont Residential Building Energy Standards (“RBES”, the “Residential Energy Code” or simply the “Energy Code”) initially was passed by the Vermont legislature in May 1997. It is a minimum standard of energy efficiency that has applied to virtually all new residential
A Guide to Building Commissioning
www.pnnl.govprovide tremendous benefits such as reducing energy use, improving building opera-tion and occupant comfort, and increasing equipment life. These benefits can be achieved in several ways: • The process can return the building’s equipment to its original and intended operation. The need for this can be the result of years of accumulated deferred
Why Measure Carbon Dioxide Inside Buildings?
www.energy.wsu.eduBy Rich Prill, Washington State University Extension Energy Program Indoor air quality Workers and students spend about half their waking hours at work or school. Therefore, maintaining adequate indoor air quality (IAQ) in schools and the workplace is becoming a top priority for facility managers and building operating engineers. An essential