Transcription of Guidance Document for Preparing a Stormwater Pollution ...
{{id}} {{{paragraph}}}
Bureau of Materials management and Compliance Assurance DEP-PED-GUID-014 Page 1 of 43 Rev. 03/02/11 BUREAU OF MATERIALS management AND COMPLIANCE ASSURANCE WATER PERMITTING AND ENFORCEMENT DIVISION Guidance Document FOR Preparing A Stormwater Pollution PREVENTION plan MARCH 2011 Bureau of Materials management and Compliance Assurance DEP-PED-GUID-014 Page 2 of 43 Rev. 03/02/11 INSTRUCTIONS This Guidance Document has been prepared by the Department of Environmental Protection (the Department) to assist you in complying with the requirements of the General Permit for the Discharge of Stormwater Associated with Industrial Activities, issued August 23, 2010, effective October 1, 2011 (the general permit).
Bureau of Materials Management and Compliance Assurance DEP-PED-GUID-014 Page 6 of 43 Rev. 03/02/11 Plan Signature and Certification The Plan must be signed by a duly authorized representative pursuant to Section 5(c)(4) and shall also be certified, in accordance with Section 5(c)(7), by a Professional Engineer licensed in the State of
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
PLAN TEMPLATE, Template, Waste, Industry, Ship Energy Efficiency Plan SEEMP, Management, Casinos, HACCP Management for Food Manufacturing, Mining Proposal and Closure Plan, Plan for Low Impact Mining Operations, Contractor Health Safety Guidelines, Contractor Health & Safety Guidelines, SPCC Rule and Recent Amendments, EICC Validated Audit Process (VAP) VAP Operations Manual