Transcription of Guide to FULL-DEPTH RECLAMATION (FDR)
{{id}} {{{paragraph}}}
Reprinted January 2019[March 2017] Guide toFULL- depth RECLAMATION (FDR) with CementInjection of waterMilling drumDistressed asphaltUnderlying base materialDeep recycled layerOperating direction1. Report Government Accession Recipient s Catalog Title and SubtitleGuide to FULL-DEPTH RECLAMATION (FDR) with Cement5. Report Date[March 2017] January 20196. Performing Organization Code7. Author(s)Garret D. Reeder, Dale S. Harrington, Michael E. Ayers, Wayne Adaska8. Performing Organization Report Performing Organization Name and AddressNational Concrete Pavement Technology CenterInstitute for Transportation, Iowa State University2711 South Loop Drive, Suite 4700 Ames, IA 50010-866410.
1.5 Asphalt pavement with patching 7 1.6 Asphalt pavement with extensive alligator cracking 7 1.7tilities like this manhole may need to be lowered U beneath the proposed FDR depth before construction 7 1.8 Schematic of a roadway reclaimer during FDR process 8 1.9pplication of dry cement powder to pulverized A mix 8
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}