HOT work . Chevron pipe line COMPANY (CPL). Procedure NUMBER: CPL HES-205. CPL HES 205 Hot work CONTENTS. HOT work HES-205. Section Title Page Purpose 205 - 3. Scope 205 - 3. Prerequisites 205 - 5. Process Overview 205 - 7. Instructions 205 - 8. Permit Origination 205 - 8. Hazard Evaluation 205 - 9. Site Preparation for Hot work Permit Requirements 205 - 10. Flammable Gas Testing 205 - 10. Authorize Hot work to Begin 205 - 10. Hot work 205 - 11. Permit Extension 205 - 11. work Completion 205 - 12. Roles and Responsibility 205 - 12. Reporting Requirements 205 - 13. Documentation and Records Retention 205 - 13. Appendices A Glossary B Hot work Permit Form (CPL-682). C Fire Watch Training Requirements Revised & Printed January 2012, Uncontrolled when printed. CPL HES 202 Hot work CPL HES 205 Hot work Purpose The purpose of this Procedure is to: describe the written hot work permit process.
hot work chevron pipe line company (cpl) procedure number: cpl hes-205
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Adjustable Pipe Support Configurations, LINE, Line Pipe, Line® Pipe, STANDARD AND LINE PIPE TOLERANCE TABLE, Pipe, Specification for line pipe, Pipe Line Sizing and Calculation, Pipe Line, PROTECTA-LINE, Universal, clevis and pipe supports, Universal, clevis and pipe supports Pipe, SEAMLESS WELDED FITTINGS