Transcription of INFORMATION Building Demolition/Removal 710
{{id}} {{{paragraph}}}
THE CITY OF SAN DIEGO Visit our web site: Upon request, this INFORMATION is available in alternative formats for persons with disabilities. DS-710 (03-22) Permit Instructions, Procedures for Building Demolition/Removal This INFORMATION Bulletin is provided to implement the Demolition/Removal Permit Procedures in Chapter 12, Article 9, Division 5 of the San Diego Municipal Code (SDMC). Demolition/Removal Permit applications are reviewed for compliance with the minimum standards necessary to safeguard public health, safety, and welfare. In addition, these procedures intend to protect the public against personal injury or property damage and to ensure completion of the l and cledemolition or removaan up of the site. I. WHEN IS A PERMIT REQUIRED? Demolition/Removal Permit is required for the complete demolition and/or removal of any structure (see SDMC for Demolition/Removal Permit Exemptions), including the dismantling of telecommunication facilities.
open plumbing and sewer lines must be capped in an approved manner whether a demolition permit is required or not. A separate permit is not required for the capping of the sewer. Exemptions from a permit do not apply if the site contains a designated Historical Resource structure(s) or is located in a designated historical
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}