Transcription of INSTALLATION GUIDE FOR TROJAN CONCRETE …
{{id}} {{{paragraph}}}
INSTALLATION GUIDE FOR TROJAN CONCRETE SLEEPER retaining WALL Available From: STEP 1: BASE PREPRATION Clear and level your site where you plan to build the retaining wall. Please ensure you leave a minimum of 200mm behind the retaining wall area for backfill. STEP 2: POST HOLES Starting from one end of the wall, mark a cross on the ground at Intervals. STEP 3: AUGER HOLES Auger holes to a minimum diameter of 450mm and a depth as required determined by the height of the retaining wall, see schedule 1. Step 4: Placement of Steel Posts Ensure post are level and spaced at 1800mm centres. Step 5: CONCRETE Placement CONCRETE should be a minimum of 20mpa, check alignment of post before CONCRETE sets. Allow a least 3 days before installing CONCRETE sleepers. Set a CONCRETE levelling pad between posts for the bottom sleeper to sit on. This pad can be below ground level if you do not wish to view the pad when finished.
installation guide for trojan concrete sleeper retaining wall available from:
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
CHAPTER 11 - ABUTMENTS, WING WALLS, PIERS, Walls, Retaining walls, Concrete, Concrete retaining Walls, RETAINING, Common Retaining Walls, Design Guide for MassBlocä Retaining Walls, Retaining Walls and Chapter 730 Steep Reinforced, Retaining Walls and Chapter 730 Steep Reinforced Slopes, Product catalog