Metering data data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. Metering Data126 Meter Mounting EquipmentEnergization of Electrical EquipmentBefore energizing1) Give equipment a thorough visual examination to determine that: A) Proper clearances have been maintained B) All connections have been made C) Equipment is clean and dry2) Make a thorough physical examination to verify.
Metering Data Data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. Metering Data 127 …