PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

New Lectures5&6&7 PM Scheduling IP ENCE603 ext instructor

ENCE 603. Management Science Applications in Project Management Lectures 5-7. Project Management LP Models in Scheduling , Integer Programming Spring 2009. instructor : Dr. Steven A. Gabriel ~sgabriel 1. Copyright 2008, Dr. Steven A. Gabriel Outline Project Scheduling Critical Path Method (CPM). AON and AOA methods Project Crashing Precedence Diagramming Method (PDM). Gantt Charts 2. Copyright 2008, Dr. Steven A. Gabriel 1. Project Networks Project activities described by a network Can use the activity-on-node (AON) model Nodes are activities, arrows (arcs) indicate the precedence relationships Could also consider the activity-on-arc (AOA) model which has arcs for activities with nodes being the starting and ending points AON used frequently in practical, non-optimization situations, AOA is used in optimization settings First AON, then AOA. Main idea for both is to determine the critical path ( , tasks whose delay will cause a delay for the whole project).

12 Copyright 2008, Dr. Steven A. Gabriel 23 • The early event time for node i, ET(i), is the earliest time at which the event corresponding to node i can occur ...

Tags:

  Scheduling, Instructor, Lectures5, Ence603, Lectures5 amp 6 amp 7 pm scheduling ip ence603 ext instructor

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of New Lectures5&6&7 PM Scheduling IP ENCE603 ext instructor

Related search queries