NORSOK STANDARDPIPING design , LAYOUT AND STRESS ANALYSISL-002 Rev. 2, September 1997 Please note that every effort has been made to ensure the accuracy of the NORSOK standardsneither OLF nor TBL or any of their members will assume liability for any use design , LAYOUT and STRESS analysisL-002 Rev. 2, September 1997 NORSOK standardPage 1 of 17 CONTENTSFOREWORD21 SCOPE32 NORMATIVE REFERENCES33 DEFINITIONS AND Abbreviations44 design AND Numbering Safety and work Clearance and Pipe Vents, drains and sample Equipment Additional requirements related to PIPING Hook-up Hoses and flexible Instrumentatio
Pressure relief devices (relief valves, rupture discs) shall be accessible and installed for easy removal from deck or permanent platform. Relief valves shall be installed with the stem in the vertical position. Other valves may be tilted, as long as the stem is above horizontal position.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}