Transcription of Productivity tables for professional painters applying ...
{{id}} {{{paragraph}}}
Productivity TablesResene Productivity TablesCall 0800 RESENE (737 363), visit or email us at Factors are the time needed for the average painting tradesperson to complete each painting task on an area basis. Multiply the Area x Factor = Hours Multiply the Hours by the Rate per Hour For example: 100m2 of new plasterboard (seal + 2 coats) = so 100m2 x = 24 hours x $45 = $1,080 The time is fixed, so to speak, by the averages of hundreds of painters , but the hourly rate changes as can be readily calculated at an average spreading rate of 10m2 per litre per coat, which allows for colours, wastage and other Tables1 Resene Productivity Tables2 Interior workHour % factorMeasureApply 1 coat sealer to flat surfaces ceilings and walls etc(a) brush and roll(b) airless 1 x sealer 2 x acrylic ceiling flat(a) brush and roll(b) airless and flat surfaces 1 x sealer/undercoat 2 x low sheen acrylicIncludes sanding, small defect fillings etc.
Resene Productivity Tables all 0800 RESENE , isit wwwresenecon or email us at adiceresenecon The ‘Factors’ are the time needed for the average painting tradesperson to complete each painting
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}