Page : 1 of 21. KLM Technology Group Rev: 01. Project Engineering April 2012. Standard KLM Technology Group #03-12 Block Aronia, SPECIFICATIONS FOR PUMP INSPECTION. Jalan Sri Perkasa 2. Taman Tampoi Utama 81200 Johor Bahru (PROJECT STANDARDS AND SPECIFICATIONS). Malaysia TABLE OF CONTENT. SCOPE 2. REFERENCES 2. DEFINITIONS AND TERMINOLOGY 2. GENERAL 2. INTRODUCTION 2. PREDICTIVE MAINTENANCE SCHEDULE FOR CENTRIFUGAL pumps 3. PREVENTIVE MAINTENANCE INSPECTION SCHEDULE FOR. CENTRIFUGAL pumps 3. Horizontal Centrifugal pumps (Both ends supported) 3. Horizontal Centrifugal pumps (Overhanging Type) 5. Submersible pumps (Wet Motor Type & Dry Motor Type) 6. Vertical Centrifugal pumps 7. Partwise Inspection during complete Overhaul of Centrifugal pumps 8. Commissioning and Testing Procedures for Centrifugal pumps 12. PREVENTIVE MAINTENANCE INSPECTION SCHEDULE FOR POSITIVE.
i. After completing the checks listed above the pump shall be started and the following shall be checked during the trial run (the trial run duration shall be half to one hour for electric driven and 3 to 4 hours for diesel driven): a) Discharge pressure b) …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}