Transcription of SLAB TRACK Recent developments in slab track
{{id}} {{{paragraph}}}
With the growth of traffic intensity itbecomes more and more difficult to carryout maintenance and renewal work. InThe Netherlands, night time possessions often lastno longer than 5 hours, and on the future high speedline in Korea (435 km from Seoul to Pusan) the max-imum effective possession is estimated at no morethan 11/2hours per night. In this respect, the currentincrease in popularity of low-maintenance trackdesigns is not the past, new projects were mainly assessed onthe basis of investment costs, whereas today the prin-ciple of life cycle costing is strongly emerging. As aresult of this new attitude, ballastedtrack concepts will loose attractive-ness in favour of slab TRACK considerationsPresently all over the world non-bal-lasted TRACK concepts are beingapplied, although still at a moderatevolume. The great advantages of suchstructures can be summarised as fol-lows: Reduction of structure height; Lower maintenance requirementsand hence higher availability; Increased service life; High lateral TRACK resistancewhich allows future speedincreases in combination with tilt-ing technology; No problems with churning ofballast particles at the low-maintenance characteristics of slab trackon open line are to be retained, great care must betaken to ensure that the subgrade layers are h
tural height could be achieved as is revealed by the dimensions in Figure 2, pg. 82. In Germany a prefabricated slab track system, produced by Bögl, is in use.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Slab, Ground Elevation Measurements in, Ground Elevation Measurements in Residential Foundation Engineering Performance Evaluations, The Slab-On-Grade Alternative, Slab Soil Vapor Standard Operating Procedures, TABLE OF CONTENTS – CONCRETE DECK SLAB CHAPTER, Cost Estimate Basement vs Crawl Space, SLAB DESIGN