Vents terminate a minimum 6” above roof line (10” in high snow load areas). (UPC 906.1 & 906.7) Vent clearance to building openings are 3’ above or 10’ horizontal. (UPC 906.2) Air-Admittance Valves Minimum 4” above drain. (Per local jurisdiction and manufacturer’s installation instructions ) Minimum 6” above insulation in attic.