CRAWLER CRANE Sequence of Laying Down 43 The HMO must: Perform a parking/securing inspection at any time the crane is taken out of service and parked or secured. Record in the crane log: −The laid down configuration −Reference to the wind action plan or manufacturer’s manual page −Maximum wind speed allowed for such configuration