calculating the difference between the project completion date of the schedule after the addition of each delay and that prior to the addition (Ndekugri, Braimah, and Gameson, 2008). Collapsed as-built or ‗ ‘but-for’ analysis method. In this method, the analyst studies all contemporaneous