Renewable Energy Interconnection Requirements …

Renewable Energy Interconnection Requirements …

www.ieee-pes.org

•Background and IntroductionNERC Integrating Variable Generation Task ... (FERC Order 661-A) ... per FERC Order 661A and exceed NERC

  Introduction, Order, Nerc, Cefr, Ferc order

Fast Frequency Response Concepts and Bulk Power System ...

Fast Frequency Response Concepts and Bulk Power System ...

www.nerc.com

This is the “highside of the generator substation” transformer, according to FERC Order No. 827. This white paper aligns with FERC on the - use of “Point of Measurement” rather than “Point of Interconnection” unless referencing a specific NERC Reliability Standard that uses Point “ of Interconnection.” 12

  Order, Cefr, Ferc order

Updated April 2019 Battery Energy Storage Overview

Updated April 2019 Battery Energy Storage Overview

www.cooperative.com

FERC Order 755 promotes energy storage as an option for frequency regulation, allowing for a premium to be paid in markets for ancillary services for the rapid response of energy storage to maintain system frequency.

  Order, Cefr, Ferc order

Transmission Basics - Energy

Transmission Basics - Energy

www.energy.gov

FERC Order 1000 –Requirement for participation in regional planning –Must incorporate public policy into planning –Discontinue utility right of first refusal – hence competitive projects –Cost allocation required . Tribal Leader Forum Series Feb 7-8 2012 10

  Order, Cefr, Ferc order