Search results with tag "Nerc"
State of Reliability 2018 - nerc.com
www.nerc.comNERC | State of Reliability 2018 | June 2018 vi Executive Summary NERC, as the ERO of North America, assures the effective and efficient reduction of reliability and security risks for
Agenda Compliance Committee Open Session - nerc.com
www.nerc.comMinutes* ― Approve a. ... Management will report on actions taken since the Board meeting, provide a project update, and further outline anticipated timelines. Summary . Prior to the November Board meeting, NERC released the joint Electric Reliability Organization (ERO) Enterprise White Paper
PRC-005-2(i) - nerc.com
www.nerc.comReliability Standard PRC-005-2, with its associated Implementation Plan, was adopted by the NERC Board of Trustees on November 7, 2012. The SDT has revised the applicability section of PRC-005-2 to
Implementation Plan - nerc.com
www.nerc.comImplementation Plan . Project 2007-11 Disturbance Monitoring . ... data is collected from Disturbance Monitoring Equipment distributed across the BES. 2. A significant amount of sequence of events recording (SER), fault recording (FR), and dynamic ... Implementation of Disturbance monitoring recording following changes to the system are ...
Implementation Plan - nerc.com
www.nerc.comThe Implementation Schedule set forth in this document facilitates implementation of the more lengthy maintenance intervals within the revised Protection System Maintenance Program in approximately equally-distributed steps over those intervals prescribed for each respective
2020 Long-Term Reliability Assessment - NERC
www.nerc.comThis 2020 LTRA is the ERO’s independent assessment and comprehensive re-port on the adequacy of planned BPS resources to meet electricity demand across North America over the next ten years. It also identifies area trends and emerging issues that affect the long-term reliability and security of the BPS. A summary of the key findings is as ...
1. Title: 2. 3. 4.
www.nerc.comequipment owned by the Distribution Provider for the protection or restoration of the BES: 4.2.1.1. Each UFLS or UVLS System that: 4.2.1.1.1. is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and 4.2.1.1.2. performs automatic Load shedding under a common control system
Standard Authorization Request Form - nerc.com
www.nerc.comStandards Authorization Request Form SAR-2 Industry Need (Provide a detailed statement justifying the need for the proposed standard, along with any supporting documentation.) Protection system coordination is an absolute necessity for the North American electric
Distributed Energy Resources - nerc.com
www.nerc.comThe North American electric power system is transforming to a resource mix that relies less on coal and nuclear while integrating more natural gas, wind, solar, distributed generation, and demand response resources.
Human Performance Fundamentals - nerc.com
www.nerc.comFOOD FOR THOUGHT “The average person puts only 25 percent of his energy and ability into his work. The world takes off its hat to those who put in more than 50
A. Introduction - nerc.com
www.nerc.comCIP-010-2 — Cyber Security — Configuration Change Management and Vulnerability Assessments Page 3 of 44 4.2.3.4 For Distribution Providers, the systems and equipment that are not included in section 4.2.1 above. 4.2.3.5 Responsible Entities that identify that they have no BES Cyber Systems categorized as high impact or medium impact according to the CIP-002-5.1
A. Introduction - nerc.com
www.nerc.comCIP-002-5.1a — Cyber Security — BES Cyber System Categorization Page 3 of 37 4.2.3.3. The systems, structures, and components that are regulated by the Nuclear
Technical Rationale Transition Plan - nerc.com
www.nerc.comImplementation Guidance, as described below. The TRAG recommends the approach outlined below as an effective means to efficiently achieve an orderly transition to Technical Rationale documents and
A. Introduction 1. Title - NERC
www.nerc.comA. Introduction 1. Title: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 2. Number: PRC-019-2 3. Purpose: To verify coordination of generating unit Facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and Protection System settings. 4 ...
PRC-012-2 – Remedial Action Schemes - nerc.com
www.nerc.comPRC-012-2 – Remedial Action Schemes . Page 2 of 49 . M3. Acceptable evidence may include, but is not limited to, dated documentation and communications with …
A. Introduction - nerc.com
www.nerc.comStandard FAC-011-3 — System Operating Limits Methodology for the Operations Horizon M2. The Reliability Coordinator shall have evidence it issued its SOL Methodology, and any
Meeting Minutes Operating Committee - nerc.com
www.nerc.comMeeting Minutes – Operating Committee Meeting – September 11-12, 2018 3 activities related to these measures and will assist as needed. ORS does not recommend a scope change to do so. ORS continues to receive updates from the EIDSN Steering Committee on the IDC Tool
Meeting Minutes Operating Committee - nerc.com
www.nerc.comMeeting Minutes – Operating Committee Meeting – March 6-7, 2018 2 Meeting and the February 8, 2018 Board of Trustees (Board) Meeting. The MRC elected four trustees and also appointed David Zwergel to replace Lloyd Linke on the Reliability Issues Steering Committee (RISC).
Cyber Security Standards Transition Guidance (Revised)
www.nerc.com2 Guidance during the Transition Period NERC acknowledges that entities currently are in various stages of implementation of CIP Version 3 and
Odessa Disturbance - nerc.com
www.nerc.comas the “Odessa Disturbance.” While the ERO has analyzed multiple similar events in California, this is the first disturbance involving a widespread reduction of solar photovoltaic (PV) resource power output observed in the Texas Interconnection.
Cyber Security Recovery Plans for BES Cyber Systems - NERC
www.nerc.comCIP-009-6 — Cyber Security — Recovery Plans for BES Cyber Systems Page 3 of 25 4.2.3.4 For Distribution Providers, the systems and equipment that are not included in section 4.2.1 above. 4.2.3.5 Responsible Entities that identify that they have no BES Cyber Systems categorized as high impact or medium impact according to the CIP-002-5.1
1. Title: 2. 3. 4.
www.nerc.com4.2.1 Distribution Provider: One or more of the following Facilities, systems and equipment owned by the Distribution Provider for the protection or restoration of the BES: 4.2.1.1 Each UFLS or UVLS System that: 4.2.1.1.1 is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and
2021 State of Reliability - nerc.com
www.nerc.comA set of reliability metrics that evaluate four core aspects of system performance: resource adequacy, transmission performance and availability, generation performance and availability, and system protection and disturbance performance Chapter 4: Severity Risk Index
Cyber Security Information Protection - NERC
www.nerc.comCIP-011-2 — Cyber Security — Information Protection Page 1 of 16 A. Introduction 1. Title: Cyber Security — Information Protection 2. Number: CIP-011-2 3. Purpose: To prevent unauthorized access to BES Cyber System Information by specifying information protection requirements in support of protecting
National Habitat Network Maps - GOV.UK
magic.defra.gov.ukIntroduction Making Space for Nature, A review of England’s Wildlife Sites and Ecological Network1, published 2010, set out the essence of what needs to be done to enhance the resilience and coherence of England’s ecological networks. The report proposed that this could be summarised in four key ... (NERC) Act 2006 (England), 5 4.
Template - Standard (Results Based) - NERC
www.nerc.comgenerating unit within the Balancing Authority Area or, if a member of a Reserve Sharing Group, the largest generating unit within the Reserve Sharing Group. 2. 4.2.7.2. Automatic Reclosing applied on the terminals of all BES Elements at substations one bus away from generating plants specified in Section 4.2.7.1 when the substation is less than 10
PRC-025-2 – Generator Relay Loadability
www.nerc.comNERC System Protection and Control Subcommittee, “Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition.” (Date of Publication: March 2016) IEEE C37.102-2006, “IEEE Guide for AC Generator Protection.” (Date of Publication: 2006)
Security Plan Example
www.ferc.govwith NERC Standard CIP-006-2, Physical Security Program for the Protection of Critical Cyber Assets. Maintenance and testing (R8) is described in this plan. • The (Utility)'s Maintenance and Testing Program is consistent with FERC guidelines.
IEEE 1547
site.ieee.orgMV Code for syncr. DER may ride -through or may trip may ride -through or may trip may ride -through or may trip Category I (based on German requirements for sync. gen.) 0.88 p.u. 0.16 s NERC PRC -024-2 may ride -through 1 s 1.20 p.u.
CIP-003-8 - Cyber Security — Security Management Controls
www.nerc.com4.2.1. Distribution Provider: One or more of the following Facilities, systems and equipment owned by the Distribution Provider for the protection or restoration of the BES: 4.2.1.1. Each UFLS or UVLS System that: 4.2.1.1.1. is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard ...
2021 Long-Term Reliability Assessment - nerc.com
www.nerc.commechanisms to address physical and cyber security risks, including exercises and information-sharing efforts with the electricity industry. The LTRA data used for this assessment creates a reference case dataset that includes projected on-peak demand and system energy needs, demand response (DR), resource capacity, and transmission projects.
Cáncer colorrectal (CCR) - SciELO
www.scielo.org.coLa colonoscopia es el examen de elección para el diagnóstico permitiendo la toma de biopsias simultáneamente. El abordaje terapéutico estandarizado, en ausencia de comorbilidad es la cirugía curativa o paliativa, las metástasis a ganglios linfáticos regionales son de-
Guías Clínicas AUGE Cáncer de Mama - Gobierno de Chile
www.minsal.clcáncer de mama metastásico sin crisis visceral, cuyos receptores de estrógenos son fuertemente positivos. En cáncer de mama metastásico HER2 positivo, sin terapia anti HER2 previa, se recomienda el uso de trastuzumab, asociado o no a otro agente anti HER2, quimioterapia o terapia hormonal.
Impacto económico del cáncer en México
www.cefp.gob.mxFinanciamiento público universal de atención médica a: Cánceres infantiles De la mujer: Mama, Cervix, Ovario germinal Del hombre: Testículo, Próstata ... •Aseguramiento de una atención continua, aun en casos de cambio de estatus laboral Identificación y …
MINISTERIO DE SALUD. Guía Clínica CÁNCER …
www.minsal.clNivel Primario Nivel Secundario Nivel Terciario Laboratorio de Citología Anatomía Patológica Unidad de Patología Cervical Quimioterapia Ginecología Oncológica (Cirugía) PAP(-) PAP (+) Detección Diagnóstico Tratamiento Radioterapia Mujer PAP(+) y sospecha clínica BIOPSIA (-) BIOPSIA (+) MUJER CÁNCER (+) Exámenes Apoyo ALTA A. DOLOR C.P
Observatorio Nacional de Cáncer
www.minsalud.gov.coInstituto Nacional de Salud, bajo la asesoría del Instituto Nacional de Cancerología, con el fin de generar información válida, confiable y representativa para el país, que sea explotada a través de la aplicación de métodos estadísticos y modelos epidemiológicos que incrementen la investigación y generen evidencia científica apta ...
Cáncer de próstata - medigraphic.com
www.medigraphic.com248 Rev Mex Urol 2008;68(4):250-259 Álvarez-Blanco MA et al. Cáncer de próstata y entre más jóvenes se hayan encontrado éstos al mo-mento del diagnóstico.12-14 Otros factores relacionados con la dieta, tabaquis-
Consejos de alimentación: Antes, durante y después del ...
www.cancer.govUsted puede consultar este libro antes, durante y después del tratamiento del cáncer. Ofrece consejos sobre tipos comunes de problemas de alimentación y formas de controlarlos.
CÓDIGO EUROPEO CONTRA EL CÁNCER - mscbs.gob.es
www.mscbs.gob.esCÓDIGO EUROPEO CONTRA EL CÁNCER. 12 formas de reducir el riesgo de cáncer. 1 No fume. No consuma ningún tipo de tabaco. 2 Haga de su casa un hogar sin humo. Apoye las políticas antitabaco en su lugar de trabajo. 3 Mantenga un peso saludable. 4 Haga ejercicio a diario. Limite el tiempo que pasa sentado. 5 Coma saludablemente:
Eyewas renc Hose nits - Guardian Equipment
www.gesafety.comF FSH 8 ft. flexible stainless steel hose in place of PVC hose. F HG Undercounter hose guide bracket to prevent hose from tangling or binding. F VB In-line vacuum breaker for installation between valve and spray head. F G3600LF Thermostatic mixing valve precisely blends hot and cold water to deliver warm (tepid) water as required by ANSI Z358.1 ...
PREVENCIÓN DEL CÁNCER Recomendaciones - SEOM
www.seom.orgno melanoma (carcinoma basocelular y espinocelular) también ha aumentado en todos los países europeos. Aunque mucho menos peligrosos para la vida que el melanoma, estos tumores representan el 95% de todos los cánceres de piel. Los individuos con …
¿Qué es el cáncer? - American Cancer Society
www.cancer.org_____American Cancer Society cancer.org | 1.800.227.2345 glóbulos sanguíneos, como es el caso con la leucemia, el linfoma y el mieloma múltiple. Los cánceres de tumor sólido son aquellos tipos que se desarrollan en cualquier
Síndrome de Stevens-Johnson y necrólisis epidérmica …
www.medigraphic.comEn SSJ y NET, la incidencia anual se describe entre 1-4 casos/1,000,000 de habitantes, aunque hay series descritas en ciudades europeas que citan de 4,3-10/1,000.0004,8,9; se estima que en 20% del total de casos corresponden a pacientes en edades pediátricas. La mayoría de los casos en todas las edades co-
Estrategia en Cáncer del Sistema Nacional de Salud
www.mscbs.gob.esEl tiempo transcurrido desde la segunda edición de la Estrategia contra elcáncer, algo más de 10 años, permite una visión amplia de los cambios observados en la prevención, el diagnóstico y el tratamiento del cáncer. Una primera constatación es la mejora del pronóstico de la gran mayoría de los cánceres
Cáncer de mama-México - UNAM
www.facmed.unam.mxincidencia y mortalidad, al ocupar el 8º. lugar en la escala baja de incidencia entre 30 países del continente americano y el 9º. lugar en mortalidad de la escala baja entre 24 países latinoamericanos. El riesgo de una mujer mexicana de desarrollar un C.M., durante su …
SISTEMA DE INFORMAÇÃO DO CÂNCER (SISCAN)
www.inca.gov.brApresentará um módulo de rastreamento que permitirá convocar as mulheres cadastradas no sistema para realizar os exames de rastreamento segundo a periodicidade e a faixa etária recomendadas. Incluirá um módulo do Programa Nacional de Qualidade em Mamografia.
Similar queries
Of reliability, Minutes, Meeting, Project, Implementation Plan, Distributed, Implementation, System, Assessment, NERC, Port, Equipment, Reliability, Detailed, Resources, Power, Performance, Configuration, Management, Transition, Implementation Guidance, A. Introduction, Remedial, Horizon, Meeting Minutes, Transition Guidance, Guidance, Disturbance, Security, Entities, Distribution, Reliability metrics, System performance, Transmission performance, Introduction, Balancing Authority, Generator, Protection, Overcurrent, Generator Protection, Critical Cyber, IEEE 1547, Code, Physical, Cáncer colorrectal CCR, Colonoscopia, Para, Guías Clínicas AUGE Cáncer de Mama, Mama, Impacto económico del cáncer en México, Universal, Aseguramiento, SALUD. Guía Clínica CÁNCER, Nivel Primario Nivel, Nivel, Observatorio Nacional de Cáncer, Instituto Nacional de, Cáncer, Consejos de alimentación: Antes, durante y después, Después del tratamiento del cáncer, CÓDIGO EUROPEO CONTRA EL CÁNCER, Eyewas renc Hose nits, Hose, PREVENCIÓN DEL CÁNCER, Carcinoma basocelular, El cáncer, American Cancer Society, American Cancer Society cancer.org, Stevens-Johnson y necrólisis epidérmica, Estrategia en Cáncer del Sistema Nacional de, Estrategia contra, Y el, Cáncer de mama-México, Escala, SISTEMA DE INFORMAÇÃO DO CÂNCER SISCAN, Rastreamento